Mr. Hoeven (for himself and Mr. Young) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
To require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.
Citations are generated automatically from bibliographic data
as a convenience and may not be complete or accurate.
Chicago
U.S. Congress. Senate. Guaranteeing Reliability through the Interconnection of Dispatchable Power Act. S. 465. 119th
Cong., 1st
sess., Introduced in Senate February 6, 2025. https://www.govinfo.gov/app/details/BILLS-119s465is.
APA
Congress, Senate (2025, February 6). Guaranteeing Reliability through the Interconnection of Dispatchable Power Act (S. 465 (IS)). Retrieved from https://www.govinfo.gov/app/details/BILLS-119s465is.
MLA
United States, Congress, Senate. Guaranteeing Reliability through the Interconnection of Dispatchable Power Act. U.S. Government Publishing Office, https://www.govinfo.gov/app/details/BILLS-119s465is. 119th Congress, S. 465, Introduced in Senate 6 Feb. 2025.
Bluebook
S.465 - 119th Congress (2025-2026): Guaranteeing Reliability through the Interconnection of Dispatchable Power Act, S.465, 119th Cong. (2025), https://www.govinfo.gov/app/details/BILLS-119s465is.