Citations are generated automatically from bibliographic data as a convenience and may not be complete or accurate.
U.S. Congress. House. To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. H.R. 3986. 106th Cong., 2nd sess., Reported in House September 19, 2000. https://www.govinfo.gov/app/details/BILLS-106hr3986rh.
Congress, House of Representatives (2000, September 19). To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (H.R. 3986 (RH)). Retrieved from https://www.govinfo.gov/app/details/BILLS-106hr3986rh.
United States, Congress, House of Representatives. To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. U.S. Government Publishing Office, https://www.govinfo.gov/app/details/BILLS-106hr3986rh. 106th Congress, H.R. 3986, Reported in House 19 Sep. 2000.
H.R.3986 - 106th Congress (1999-2000): To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington., H.R.3986, 106th Cong. (2000), https://www.govinfo.gov/app/details/BILLS-106hr3986rh.