Citations are generated automatically from bibliographic data as a convenience and may not be complete or accurate.
U.S. Congress. House. To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. H.R. 3986. 106th Cong., 2nd sess., Introduced in House March 15, 2000. https://www.govinfo.gov/app/details/BILLS-106hr3986ih.
Congress, House of Representatives (2000, March 15). To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (H.R. 3986 (IH)). Retrieved from https://www.govinfo.gov/app/details/BILLS-106hr3986ih.
United States, Congress, House of Representatives. To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. U.S. Government Publishing Office, https://www.govinfo.gov/app/details/BILLS-106hr3986ih. 106th Congress, H.R. 3986, Introduced in House 15 Mar. 2000.
H.R.3986 - 106th Congress (1999-2000): To provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington., H.R.3986, 106th Cong. (2000), https://www.govinfo.gov/app/details/BILLS-106hr3986ih.