Citations are generated automatically from bibliographic data as a convenience and may not be complete or accurate.
U.S. Congress. House. An act to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. H.R. 3986. 106th Cong., 2nd sess., Enrolled Bill October 18, 2000. https://www.govinfo.gov/app/details/BILLS-106hr3986enr.
Congress, (2000, October 18). An act to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. (H.R. 3986 (ENR)). Retrieved from https://www.govinfo.gov/app/details/BILLS-106hr3986enr.
United States, Congress, An act to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. U.S. Government Publishing Office, https://www.govinfo.gov/app/details/BILLS-106hr3986enr. 106th Congress, H.R. 3986, Enrolled Bill 18 Oct. 2000.
H.R.3986 - 106th Congress (1999-2000): An act to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington., H.R.3986, 106th Cong. (2000), https://www.govinfo.gov/app/details/BILLS-106hr3986enr.