<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180376be3">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>Resources, Community, and Economic Development Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1996-03-13</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>10 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:T-RCED-96-100</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-T-RCED-96-100</identifier>
<identifier type="local">P0b002ee180376be3</identifier>
<identifier type="former package identifier">f:rc96100t</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-28</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-T-RCED-96-100</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-T-RCED-96-100</accessId>
 <reportNumber>T-RCED-96-100</reportNumber>
 <subject>Nuclear weapons testing</subject>
 <subject>Strategic forces</subject>
 <subject>Atomic energy defense activities</subject>
 <subject>Nuclear weapons plants</subject>
 <subject>Missile warheads</subject>
 <subject>Spare parts</subject>
 <subject>Safety standards</subject>
 <identifier>DOE Nuclear Weapons Stockpile Surveillance Program</identifier>
 <identifier>W62 Warhead</identifier>
 <identifier>W78 Warhead</identifier>
 <identifier>W88 Warhead</identifier>
 <identifier>DOE Nuclear Explosive Safety Study</identifier>
 <identifier>W87 Warhead</identifier>
 <identifier>Minuteman III Missile</identifier>
 <type>Testimony</type>
 <seriesAbbrev>RCED</seriesAbbrev>
</extension>
<titleInfo>
 <title>Nuclear Weapons: Status of DOE&apos;s Nuclear Stockpile Surveillance Program</title>
</titleInfo>
<abstract>GAO discussed the Department of Energy&apos;s (DOE) nuclear weapons stockpile
surveillance program. GAO noted that: (1) during the last 4 years, DOE
has not conducted all of the tests necessary to ensure the stockpile&apos;s
reliability; (2) testing delays have resulted from equipment problems,
lack of space on missiles for testing, an incomplete safety study, and
physical relocation of testing activities; (3) for 3 of the 9 types of
weapons scheduled for flight testing, DOE had conducted more than 33
percent fewer tests than scheduled, which causes DOE to be concerned
about the accuracy of the weapons&apos; reliability levels; (4) laboratory
tests of nonnuclear components are seriously behind schedule for one
weapon type; and (5) destructive laboratory testing of most nuclear
components is behind schedule, but DOE expects to be back on schedule by
the end of fiscal year 1997.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-T-RCED-96-100/html/GAOREPORTS-T-RCED-96-100.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-T-RCED-96-100/pdf/GAOREPORTS-T-RCED-96-100.pdf</url>
</location>
<identifier type="preferred citation">GAO/T-RCED-96-100</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-T-RCED-96-100</url>
</location>
<note>Testimony</note>
<extension>
 <searchTitle>GAO/T-RCED-96-100; Nuclear Weapons: Status of DOE&apos;s Nuclear Stockpile Surveillance Program;
            </searchTitle>
</extension>
<subject>
 <topic>Nuclear weapons testing</topic>
 <topic>Strategic forces</topic>
 <topic>Atomic energy defense activities</topic>
 <topic>Nuclear weapons plants</topic>
 <topic>Missile warheads</topic>
 <topic>Spare parts</topic>
 <topic>Safety standards</topic>
 <topic>DOE Nuclear Weapons Stockpile Surveillance Program</topic>
 <topic>W62 Warhead</topic>
 <topic>W78 Warhead</topic>
 <topic>W88 Warhead</topic>
 <topic>DOE Nuclear Explosive Safety Study</topic>
 <topic>W87 Warhead</topic>
 <topic>Minuteman III Missile</topic>
</subject>
</mods>