<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee18039121a">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>Resources, Community, and Economic Development Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1994-11-08</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>20 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:RCED-95-29</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-RCED-95-29</identifier>
<identifier type="local">P0b002ee18039121a</identifier>
<identifier type="former package identifier">f:rc95029</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-28</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-RCED-95-29</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-RCED-95-29</accessId>
 <reportNumber>RCED-95-29</reportNumber>
 <subject>Nuclear facilities</subject>
 <subject>Energy research</subject>
 <subject>Contractor performance</subject>
 <subject>Facility maintenance</subject>
 <subject>Maintenance costs</subject>
 <subject>Work measurement standards</subject>
 <subject>Radioactive wastes</subject>
 <subject>Nuclear waste storage</subject>
 <subject>Tanks (containers)</subject>
 <subject>Nuclear waste management</subject>
 <identifier>Hanford (WA)</identifier>
 <identifier>DOE Hanford Tank Farm Maintenance Program</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>RCED</seriesAbbrev>
</extension>
<titleInfo>
 <title>Nuclear Health and Safety: Further Improvement Needed in the Hanford Tank Farm Maintenance Program</title>
</titleInfo>
<abstract>At the Energy Department&apos;s (DOE) Hanford facility in Washington state, a
backlog in routine maintenance increases the risk of a significant leak
or accident involving underground storage tanks that hold 61 million
gallons of high-level radioactive waste. Some progress has been made in
strengthening the tank farm maintenance program.  Westinghouse, a
contractor at Hanford, believes that a new maintenance approach has
helped to reduce the number of uncompleted maintenance projects from
1,969 to 1,517. However, the remaining backlog of projects is still too
great to guarantee that needed maintenance will be done in a timely
manner.  Tank farm maintenance personnel estimate that to respond
promptly to maintenance needs, the number of projects awaiting
completion should not exceed three months&apos; work--about 300 projects, or
less than one-fifth of the current backlog. Westinghouse can further
improve its maintenance program by reducing the time spent preparing and
closing out maintenance projects.  Westinghouse has started to
experiment with procedures that other DOE sites use to reduce delays,
and these experiments show promise.  Westinghouse can also improve its
program by gathering and analyzing more information about how it
processes maintenance projects.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-RCED-95-29/html/GAOREPORTS-RCED-95-29.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-RCED-95-29/pdf/GAOREPORTS-RCED-95-29.pdf</url>
</location>
<identifier type="preferred citation">GAO/RCED-95-29</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-RCED-95-29</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/RCED-95-29; Nuclear Health and Safety: Further Improvement Needed in the Hanford Tank Farm Maintenance Program;
            </searchTitle>
</extension>
<subject>
 <topic>Nuclear facilities</topic>
 <topic>Energy research</topic>
 <topic>Contractor performance</topic>
 <topic>Facility maintenance</topic>
 <topic>Maintenance costs</topic>
 <topic>Work measurement standards</topic>
 <topic>Radioactive wastes</topic>
 <topic>Nuclear waste storage</topic>
 <topic>Tanks (containers)</topic>
 <topic>Nuclear waste management</topic>
 <topic>Hanford (WA)</topic>
 <topic>DOE Hanford Tank Farm Maintenance Program</topic>
</subject>
</mods>