<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee18038fc6b">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1999-08-24</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>24 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-99-146</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-99-146</identifier>
<identifier type="local">P0b002ee18038fc6b</identifier>
<identifier type="former package identifier">f:ns99146</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-23</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-99-146</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-99-146</accessId>
 <reportNumber>NSIAD-99-146</reportNumber>
 <subject>Helicopters</subject>
 <subject>Military aircraft</subject>
 <subject>Cost analysis</subject>
 <subject>Army procurement</subject>
 <subject>Concurrency</subject>
 <subject>Military cost control</subject>
 <subject>Future budget projections</subject>
 <subject>Operational testing</subject>
 <subject>Defense capabilities</subject>
 <subject>Weapons systems</subject>
 <identifier>Comanche Helicopter</identifier>
 <identifier>AH-1 Cobra Helicopter</identifier>
 <identifier>OH-6 Cayuse Helicopter</identifier>
 <identifier>OH-58 Kiowa Helicopter</identifier>
 <identifier>UH-1 Iroquois Helicopter</identifier>
 <identifier>Army Comanche Helicopter Program</identifier>
 <identifier>Longbow Apache Helicopter</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>Defense Acquisitions: Comanche Program Cost, Schedule, and</title>
</titleInfo>
<abstract>Pursuant to a congressional request, GAO reviewed the Army&apos;s Comanche
Helicopter Program, focusing on: (1) the risks in the Army&apos;s
restructured plans for developing and testing the Comanche; (2) the
changes in the Comanche&apos;s performance capabilities and requirements; (3)
cost estimates for development; and (4) the Comanche&apos;s impact on the
Army&apos;s overall aviation modernization efforts.&lt;p/&gt;GAO noted that: (1) the Comanche&apos;s restructured program contains
significant risks of cost overruns, schedule delays, and degraded
performance because it would: (a) begin the engineering and
manufacturing development phase before some key mission equipment
technologies have matured and have been integrated into the flight-test
aircraft; (b) compress the flight-test schedule, increasing the amount
of concurrent developmental and operational testing; and (c) begin
production before initial operational testing starts, resulting in
concurrency between development testing and initial production; (2) the
program is proceeding to the next development phase with high levels of
uncertainty; (3) successful commercial firms generally do not proceed
into product development and production with such high levels of
uncertainty; (4) the Army is proposing changes to the aircraft that
would adversely impact some of the Comanche&apos;s planned performance
capabilities; (5) while their exact impact is unknown, these changes
will increase the risk that the Comanche&apos;s planned performance goals
will not be achieved; (6) the Army acknowledges that it will not achieve
its goal of executing the Comanche&apos;s restructured development program
within its funding estimate of about $4.4 billion for fiscal years 1999
through 2006; (7) an analysis by the Department of Defense&apos;s Cost
Analysis Improvement Group in November 1998 found that total program
costs would be about $150 million (3.4 percent) higher than the Army&apos;s
estimate; (8) the Group also believes that insufficient near-term
funding could lead to a 6-12 month schedule delay, which could add
between $275 million and $425 million to the program&apos;s overall
development costs; (9) further, the Army&apos;s accelerated technology
development and testing plans increase the risk of additional schedule
delays and cost increases; (10) the Army continues to single out the
Comanche as the centerpiece of its aviation modernization plan; (11) the
Comanche program would absorb an increasingly larger share of the Army&apos;s
total aviation budget and would account for about 64 percent of the
budget in fiscal year 2008; (12) according to the Army, its
modernization plan provides the best balance between capabilities and
resources; (13) the plan recognizes that because of funding constraints,
some program modernization requirements must be traded off; and (14) as
a result, older helicopters will have to be retained longer than
originally planned, some helicopter upgrades will be foregone, and lower
quantities of some helicopters will have to be procured.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-99-146/html/GAOREPORTS-NSIAD-99-146.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-99-146/pdf/GAOREPORTS-NSIAD-99-146.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-99-146</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-99-146</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-99-146; Defense Acquisitions: Comanche Program Cost, Schedule, and;
            </searchTitle>
</extension>
<subject>
 <topic>Helicopters</topic>
 <topic>Military aircraft</topic>
 <topic>Cost analysis</topic>
 <topic>Army procurement</topic>
 <topic>Concurrency</topic>
 <topic>Military cost control</topic>
 <topic>Future budget projections</topic>
 <topic>Operational testing</topic>
 <topic>Defense capabilities</topic>
 <topic>Weapons systems</topic>
 <topic>Comanche Helicopter</topic>
 <topic>AH-1 Cobra Helicopter</topic>
 <topic>OH-6 Cayuse Helicopter</topic>
 <topic>OH-58 Kiowa Helicopter</topic>
 <topic>UH-1 Iroquois Helicopter</topic>
 <topic>Army Comanche Helicopter Program</topic>
 <topic>Longbow Apache Helicopter</topic>
</subject>
</mods>