<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180379880">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1998-04-28</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>38 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-98-45</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-98-45</identifier>
<identifier type="local">P0b002ee180379880</identifier>
<identifier type="former package identifier">f:ns98045</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-24</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-98-45</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-98-45</accessId>
 <reportNumber>NSIAD-98-45</reportNumber>
 <subject>Defense procurement</subject>
 <subject>Advanced weapons systems</subject>
 <subject>Concurrency</subject>
 <subject>Defense capabilities</subject>
 <subject>Missiles</subject>
 <subject>Air warfare</subject>
 <subject>Defense cost control</subject>
 <subject>Combat readiness</subject>
 <identifier>AIM-9X Missile</identifier>
 <identifier>Joint Helmet-Mounted Cueing System</identifier>
 <identifier>AIM-9M Missile</identifier>
 <identifier>F-15 Aircraft</identifier>
 <identifier>F-16 Aircraft</identifier>
 <identifier>F-22 Aircraft</identifier>
 <identifier>F/A-18 Aircraft</identifier>
 <identifier>Sidewinder Missile</identifier>
 <type>Chapter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>AIM-9X Acquisition: Missile Risk Reduction Underway But System Production Plans Need to be Reexamined</title>
</titleInfo>
<abstract>Pursuant to a congressional request, GAO reviewed the development status
of the AIM-9X missile program and its concerns about the testing and
production of all elements of the AIM-9X weapon system, focusing on the:
(1) services&apos; efforts to reduce missile development risk; (2) missile
program&apos;s plan to transition from development to production; and (3)
importance of separately managed but essential supporting systems.&lt;p/&gt;GAO noted that: (1) the AIM-9X missile program includes many initiatives
to reduce the risk of technical, cost, and schedule problems; (2) it
uses many existing subsystems, components, and items not requiring
development, and government and contractor technical experts have joined
together in integrated product teams; (3) in addition, the services
conducted a competitive demonstration and validation of new technologies
to reduce technical risk; (4) GAO is concerned, however, about two
situations; (5) the plan to start missile low-rate initial production
about 1 year before completing development flight testing and before
operational testing of production-representative missiles will risk
later discovery of technical or operational suitability problems; (6)
accordingly, at this critical juncture, Department of Defense (DOD)
decisionmakers will not have enough verifiable information on the
system&apos;s key performance parameters in an operational environment to
make an informed production decision; (7) GAO is concerned that the
helmet-mounted cueing system is being developed under a separate program
from the missile even though U.S. fighter pilots need both the AIM-9X
missile and the helmet-mounted cueing system to ensure that they can
prevail in air-to-air combat against modern threat missiles; (8) while
the separate development programs are being coordinated, there is no
requirement that the missile, helmet, and aircraft modifications be
thoroughly and realistically tested and evaluated together as a system
of systems prior to initiating AIM-9X missile production; (9) until the
weapon system is tested and evaluated using production-representative
missiles and helmets, DOD decisionmakers will not have information on
whether the AIM-9X weapon system&apos;s key performance parameters--such as
the ability to acquire, track, and fire on targets over a wider area
than the AIM-9M--are achievable; and (10) further, if all elements of
the system are not produced and deployed together, the AIM-9X may not be
able to prevail in aerial combat against modern threat missiles.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-98-45/html/GAOREPORTS-NSIAD-98-45.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-98-45/pdf/GAOREPORTS-NSIAD-98-45.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-98-45</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-98-45</url>
</location>
<note>Chapter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-98-45; AIM-9X Acquisition: Missile Risk Reduction Underway But System Production Plans Need to be Reexamined;
            </searchTitle>
</extension>
<subject>
 <topic>Defense procurement</topic>
 <topic>Advanced weapons systems</topic>
 <topic>Concurrency</topic>
 <topic>Defense capabilities</topic>
 <topic>Missiles</topic>
 <topic>Air warfare</topic>
 <topic>Defense cost control</topic>
 <topic>Combat readiness</topic>
 <topic>AIM-9X Missile</topic>
 <topic>Joint Helmet-Mounted Cueing System</topic>
 <topic>AIM-9M Missile</topic>
 <topic>F-15 Aircraft</topic>
 <topic>F-16 Aircraft</topic>
 <topic>F-22 Aircraft</topic>
 <topic>F/A-18 Aircraft</topic>
 <topic>Sidewinder Missile</topic>
</subject>
</mods>