<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee1803868b0">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1997-02-24</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>16 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-97-58</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-97-58</identifier>
<identifier type="local">P0b002ee1803868b0</identifier>
<identifier type="former package identifier">f:ns97058</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-28</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-97-58</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-97-58</accessId>
 <reportNumber>NSIAD-97-58</reportNumber>
 <subject>Bomber aircraft</subject>
 <subject>Base realignments</subject>
 <subject>Air Force bases</subject>
 <subject>Military cost control</subject>
 <subject>Defense economic analysis</subject>
 <subject>Aircraft maintenance</subject>
 <subject>Construction costs</subject>
 <subject>Cost effectiveness analysis</subject>
 <subject>Military training</subject>
 <subject>Facility construction</subject>
 <identifier>B-1B Aircraft</identifier>
 <identifier>Air Force Route Integration Instrumentation System</identifier>
 <identifier>F-15 Aircraft</identifier>
 <identifier>Eagle Aircraft</identifier>
 <identifier>Air Force Logistics Composite Model</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>Military Bases: Mission Transfers Affecting Ellsworth Air Force Base</title>
</titleInfo>
<abstract>Pursuant to a congressional request, GAO reviewed the costs and benefits
of several B-1B aircraft mission transfers affecting the Ellsworth Air
Force Base (AFB) in South Dakota, focusing on the: (1) extent to which
the Air Force analyzed the costs and benefits of the proposed jet engine
intermediate maintenance consolidation at Dyess AFB, Texas; (2) costs
and benefits of transferring the Route Integration Instrumentation
System (RIIS) from Ellsworth to Nellis AFB, Nevada; and (3) reasons for
and cost of constructing facilities for housing B-1B aircraft at Robins
AFB, Georgia.&lt;p/&gt;GAO found that: (1) the Air Force&apos;s mid-1995 preliminary analysis showed
that consolidating B-1B engine intermediate maintenance at Dyess AFB
could result in savings; (2) however, this analysis was based primarily
on discussions among maintenance personnel and did not include certain
factors that could reduce the savings because several important
decisions, such as the extent that back-up capabilities would need to be
retained at other bases, were not made until later in calendar year
1995; (3) a cost-benefit analysis, including estimated workload
distribution, and one-time construction, moving, and set-up costs, was
not conducted; (4) such an analysis, using updated data, is needed to
assess whether the consolidation would in fact save money and result in
operating efficiencies; (5) GAO&apos;s analysis of Air Force data showed that
transferring the RIIS, a computer-based system for assessing flight crew
training missions, to Nellis AFB from Ellsworth, should result in annual
savings of about $262,000, primarily by reducing staff requirements; (6)
no significant military construction is presently needed or planned for
the transfer, however, some modifications may be necessary to meet
security requirements; (7) if projected savings are accurate and
estimated one-time transfer costs do not increase substantially,
transfer costs will be recovered in less than 3 years; (8) the National
Guard provided several reasons for its decision to relocate a newly
established B-1B unit from Dobbins AFB to Robins AFB; (9) according to
the National Guard, moving the B-1B unit to Robins minimized personnel
dislocations, avoided costly runway repairs, provided diversified
training routes, and permitted collocating the B-1Bs with supporting
tankers; (10) other existing B-1B bases, including Dyess, Ellsworth, and
McConnell, were briefly considered for the B-1B unit; (11) to put B-1B
aircraft at an existing B-1B base, however, would have required
activating an additional National Guard unit, while at the same time
deactivating a unit; (12) the National Guard estimates construction
costs for the B-1B wing at Robins will total about $99.5 million; and
(13) construction started in October 1996 and is scheduled to be
completed in 2001.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-97-58/html/GAOREPORTS-NSIAD-97-58.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-97-58/pdf/GAOREPORTS-NSIAD-97-58.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-97-58</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-97-58</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-97-58; Military Bases: Mission Transfers Affecting Ellsworth Air Force Base;
            </searchTitle>
</extension>
<subject>
 <topic>Bomber aircraft</topic>
 <topic>Base realignments</topic>
 <topic>Air Force bases</topic>
 <topic>Military cost control</topic>
 <topic>Defense economic analysis</topic>
 <topic>Aircraft maintenance</topic>
 <topic>Construction costs</topic>
 <topic>Cost effectiveness analysis</topic>
 <topic>Military training</topic>
 <topic>Facility construction</topic>
 <topic>B-1B Aircraft</topic>
 <topic>Air Force Route Integration Instrumentation System</topic>
 <topic>F-15 Aircraft</topic>
 <topic>Eagle Aircraft</topic>
 <topic>Air Force Logistics Composite Model</topic>