<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee1803969d4">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1996-09-26</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>23 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-96-199</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-96-199</identifier>
<identifier type="local">P0b002ee1803969d4</identifier>
<identifier type="former package identifier">f:ns96199</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-28</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-96-199</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-96-199</accessId>
 <reportNumber>NSIAD-96-199</reportNumber>
 <subject>Military procurement</subject>
 <subject>Advanced weapons systems</subject>
 <subject>Missiles</subject>
 <subject>Testing</subject>
 <subject>Military land vehicles</subject>
 <subject>Multi-year procurement</subject>
 <subject>Concurrency</subject>
 <identifier>Javelin Antitank Weapon</identifier>
 <identifier>Dragon Missile</identifier>
 <type>Other Written Product</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
 <USCode title="10">
                      <section number="2306b"></section>
                </USCode>
</extension>
<titleInfo>
 <title>Army Acquisition: Javelin Is Not Ready for Multiyear Procurement</title>
</titleInfo>
<abstract>GAO reviewed the Army&apos;s procurement of the Javelin missile system,
focusing on whether the: (1) system meets established criteria for
multiyear production contracts; (2) Army adequately tested the system to
determine its suitability for full-rate production; and (3) Army&apos;s
purchase of command launch units during limited production is
appropriate.&lt;p/&gt;GAO found that the Army: (1) has not demonstrated that the Javelin&apos;s
design is sufficiently stable for multiyear production; (2) does not
plan to conduct operational testing of the missile until after full-rate
production begins; (3) has extensively redesigned the system since it
was operationally tested in 1993; (4) believes that its planned testing
of the system will be adequate; (5) has conducted only limited testing,
which may not be useful for predicting the system&apos;s reliability; and (6)
could acquire fewer units under its low-rate initial production contract
and still sustain the contractor&apos;s ability to produce the system.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-96-199/html/GAOREPORTS-NSIAD-96-199.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-96-199/pdf/GAOREPORTS-NSIAD-96-199.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-96-199</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-96-199</url>
</location>
<note>Other Written Product</note>
<extension>
 <searchTitle>GAO/NSIAD-96-199; Army Acquisition: Javelin Is Not Ready for Multiyear Procurement;
            </searchTitle>
</extension>
<subject>
 <topic>Military procurement</topic>
 <topic>Advanced weapons systems</topic>
 <topic>Missiles</topic>
 <topic>Testing</topic>
 <topic>Military land vehicles</topic>
 <topic>Multi-year procurement</topic>
 <topic>Concurrency</topic>
 <topic>Javelin Antitank Weapon</topic>
 <topic>Dragon Missile</topic>
</subject>
<relatedItem type="isReferencedBy">
 <titleInfo>
  <title>United States Code</title>
  <partNumber>Title 10 Section 2306b</partNumber>
</titleInfo>
 <identifier type="USC citation">10 U.S.C. 2306b</identifier>
</relatedItem>
</mods>