<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180393a6f">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1996-07-09</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>20 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-96-136</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-96-136</identifier>
<identifier type="local">P0b002ee180393a6f</identifier>
<identifier type="former package identifier">f:ns96136</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-24</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-96-136</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-96-136</accessId>
 <reportNumber>NSIAD-96-136</reportNumber>
 <subject>Ballistic missiles</subject>
 <subject>Defense capabilities</subject>
 <subject>Army procurement</subject>
 <subject>Nuclear weapons</subject>
 <subject>Advanced weapons systems</subject>
 <subject>Testing</subject>
 <subject>Military airlift operations</subject>
 <subject>Cost overruns</subject>
 <subject>Systems evaluation</subject>
 <subject>Concurrency</subject>
 <identifier>SDI Theater High Altitude Area Defense System</identifier>
 <identifier>THAADS</identifier>
 <identifier>THAADS User Operational Evaluation System</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>Ballistic Missile Defense: Issues Concerning Acquisition of THAAD Prototype System</title>
</titleInfo>
<abstract>GAO reviewed the Theater High Altitude Area Defense (THAAD) User
Operational Evaluation System (UOES) program, focusing on whether
planned testing would reasonably demonstrate the capabilities of UOES as
an interim system before funds are committed to interceptor production.&lt;p/&gt;GAO found that: (1) the Army purchased 20 interceptors for demonstration
and validation flight tests, of which only 14 will be used in these
tests; (2) the Army plans to commit funds for UOES production based on
the results of the first 7 of the 14 scheduled flight tests; (3)
transporting UOES interceptors from the United States to a theater of
operations will require significant airlift resources that may not be
available unless UOES is afforded a high priority; (4) the cost estimate
for the 40 UOES interceptors has increased from $80 million to $165
million, and THAAD project officials expect that estimate to rise to
$220 million; and (5) delivery of the 40 UOES interceptors will be
delayed due to increased delivery lead times and reduced fiscal year
(FY) 1997 funding.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-96-136/html/GAOREPORTS-NSIAD-96-136.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-96-136/pdf/GAOREPORTS-NSIAD-96-136.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-96-136</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-96-136</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-96-136; Ballistic Missile Defense: Issues Concerning Acquisition of THAAD Prototype System;
            </searchTitle>
</extension>
<subject>
 <topic>Ballistic missiles</topic>
 <topic>Defense capabilities</topic>
 <topic>Army procurement</topic>
 <topic>Nuclear weapons</topic>
 <topic>Advanced weapons systems</topic>
 <topic>Testing</topic>
 <topic>Military airlift operations</topic>
 <topic>Cost overruns</topic>
 <topic>Systems evaluation</topic>
 <topic>Concurrency</topic>
 <topic>SDI Theater High Altitude Area Defense System</topic>
 <topic>THAADS</topic>
 <topic>THAADS User Operational Evaluation System</topic>
</subject>
</mods>