<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180383f36">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1996-07-26</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>26 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-96-126</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-96-126</identifier>
<identifier type="local">P0b002ee180383f36</identifier>
<identifier type="former package identifier">f:ns96126</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-24</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-96-126</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-96-126</accessId>
 <reportNumber>NSIAD-96-126</reportNumber>
 <subject>Product performance evaluation</subject>
 <subject>Military aircraft</subject>
 <subject>Military airlift operations</subject>
 <subject>Cost plus award fee contracts</subject>
 <subject>Contract specifications</subject>
 <subject>Overpayments</subject>
 <subject>Testing</subject>
 <subject>Air Force procurement</subject>
 <subject>Contractor payments</subject>
 <subject>Defense capabilities</subject>
 <identifier>C-17 Aircraft</identifier>
 <identifier>DOD Mobility Requirements Study</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>C-17 Aircraft: RM&amp;A Evaluation Less Demanding Than Initially Planned</title>
</titleInfo>
<abstract>Pursuant to a congressional request, GAO reviewed the Air Force&apos;s
reliability, maintainability, and availability (RM&amp;A) evaluation of the
C-17 aircraft, focusing on: (1) RM&amp;A planning, preparation, execution,
and results; and (2) whether the evaluation demonstrated the aircraft&apos;s
wartime surge rate.&lt;p/&gt;GAO found that: (1) the Air Force reported that the C-17 aircraft met or
exceeded 10 of the 11 contract requirements during its RM&amp;A evaluation,
but the evaluation was less demanding than originally planned; (2)
although the revised RM&amp;A evaluation plan increased total flying hours,
the number of sorties, and average wartime sortie duration, it decreased
the ratio of sorties to flying hours, which weakened the application of
RM&amp;A measurement criteria and lessened the stress on the aircraft; (3)
the RM&amp;A evaluation also had fewer airdrops and austere airfield
landings than originally planned, and the aircraft flew cargo loads that
averaged less than one-half the weight projected in contract
specifications; (4) 3 years of operational testing show that the
aircraft generally met RM&amp;A requirements with the exception of those
related to built-in-test parameters; (5) the RM&amp;A evaluation was not a
statistically valid test for determining C-17 fleet wartime utilization
rates because the test&apos;s duration was too short; and (6) the incentive
fee should have been reduced, since the aircraft could not perform the
formation personnel airdrop mission under operational conditions, or the
aeromedical evacuation mission.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-96-126/html/GAOREPORTS-NSIAD-96-126.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-96-126/pdf/GAOREPORTS-NSIAD-96-126.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-96-126</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-96-126</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-96-126; C-17 Aircraft: RM&amp;A Evaluation Less Demanding Than Initially Planned;
            </searchTitle>
</extension>
<subject>
 <topic>Product performance evaluation</topic>
 <topic>Military aircraft</topic>
 <topic>Military airlift operations</topic>
 <topic>Cost plus award fee contracts</topic>
 <topic>Contract specifications</topic>
 <topic>Overpayments</topic>
 <topic>Testing</topic>
 <topic>Air Force procurement</topic>
 <topic>Contractor payments</topic>
 <topic>Defense capabilities</topic>
 <topic>C-17 Aircraft</topic>
 <topic>DOD Mobility Requirements Study</topic>
</subject>
</mods>