<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee18038b568">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1995-03-17</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>30 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-95-45</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-95-45</identifier>
<identifier type="local">P0b002ee18038b568</identifier>
<identifier type="former package identifier">f:ns95045</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-28</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-95-45</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-95-45</accessId>
 <reportNumber>NSIAD-95-45</reportNumber>
 <subject>Ballistic missiles</subject>
 <subject>Fighter aircraft</subject>
 <subject>Missile warheads</subject>
 <subject>Advanced weapons systems</subject>
 <subject>Defense procurement</subject>
 <subject>Military budgets</subject>
 <subject>Cost analysis</subject>
 <subject>Air defense systems</subject>
 <identifier>Patriot PAC-3</identifier>
 <identifier>Desert Storm</identifier>
 <identifier>SDI Theater High Altitude Area Defense System</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>Ballistic Missile Defense: Computation of Number of Patriot PAC-3 Interceptors Needed Is Flawed</title>
</titleInfo>
<abstract>Pursuant to a congressional request, GAO reviewed the Ballistic Missile
Defense Organization&apos;s (BMDO) planned production of 1,200 Patriot
Advanced Capability-Three (PAC-3) interceptors, focusing on the: (1)
determination of the number of interceptors needed; and (2)
affordability of the interceptors.&lt;p/&gt;GAO found that: (1) the actual number of PAC-3 interceptors needed is
uncertain; (2) the Department of Defense (DOD) used inaccurate
assumptions and made mathematical errors in its affordability analysis;
(3) if the estimated quantity is greater than 1,200 PAC-3 interceptors,
the program could be underfunded by between $700 million and $3.4
billion; and (4) to avoid spending on programs which may require more
funding than is available, DOD must determine the number of interceptors
needed and adjust its program within budget constraints.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-95-45/html/GAOREPORTS-NSIAD-95-45.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-95-45/pdf/GAOREPORTS-NSIAD-95-45.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-95-45</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-95-45</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-95-45; Ballistic Missile Defense: Computation of Number of Patriot PAC-3 Interceptors Needed Is Flawed;
            </searchTitle>
</extension>
<subject>
 <topic>Ballistic missiles</topic>
 <topic>Fighter aircraft</topic>
 <topic>Missile warheads</topic>
 <topic>Advanced weapons systems</topic>
 <topic>Defense procurement</topic>
 <topic>Military budgets</topic>
 <topic>Cost analysis</topic>
 <topic>Air defense systems</topic>
 <topic>Patriot PAC-3</topic>
 <topic>Desert Storm</topic>
 <topic>SDI Theater High Altitude Area Defense System</topic>
</subject>
</mods>