<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180380a42">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1995-09-15</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>19 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-95-161</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-95-161</identifier>
<identifier type="local">P0b002ee180380a42</identifier>
<identifier type="former package identifier">f:ns95161</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-23</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-95-161</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-95-161</accessId>
 <reportNumber>NSIAD-95-161</reportNumber>
 <subject>Defense procurement</subject>
 <subject>Advanced weapons systems</subject>
 <subject>Military aircraft</subject>
 <subject>Combat readiness</subject>
 <subject>Defense capabilities</subject>
 <subject>Systems evaluation</subject>
 <subject>Testing</subject>
 <subject>Air warfare</subject>
 <subject>Quality assurance</subject>
 <subject>Risk management</subject>
 <identifier>Short Range Unmanned Aerial Vehicle</identifier>
 <identifier>Israel</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>Unmanned Aerial Vehicles: Maneuver System Schedule Includes Unnecessary Risk</title>
</titleInfo>
<abstract>The cost of the Defense Department&apos;s unmanned aerial vehicle systems,
which are designed to fly over enemy territory and transmit images back
to ground stations, is expected to reach $4.2 billion. Past unmanned
aerial vehicle acquisition programs have been marked by premature entry
into production that resulted in extensive and costly system redesigns
in attempting to achieve acceptable system performance. Nevertheless,
the Joint Tactical Unmanned Aerial Vehicle Project Office plans to begin
production of the Maneuver system, a variant of the Hunter, without
adequate assurance that it can meet operational performance
requirements. As a result, the Pentagon will again risk acquiring an
unsatisfactory system.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-95-161/html/GAOREPORTS-NSIAD-95-161.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-95-161/pdf/GAOREPORTS-NSIAD-95-161.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-95-161</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-95-161</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-95-161; Unmanned Aerial Vehicles: Maneuver System Schedule Includes Unnecessary Risk;
            </searchTitle>
</extension>
<subject>
 <topic>Defense procurement</topic>
 <topic>Advanced weapons systems</topic>
 <topic>Military aircraft</topic>
 <topic>Combat readiness</topic>
 <topic>Defense capabilities</topic>
 <topic>Systems evaluation</topic>
 <topic>Testing</topic>
 <topic>Air warfare</topic>
 <topic>Quality assurance</topic>
 <topic>Risk management</topic>
 <topic>Short Range Unmanned Aerial Vehicle</topic>
 <topic>Israel</topic>
</subject>
</mods>