<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180392e84">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">1993-11-03</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-94-75</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-94-75</identifier>
<identifier type="local">P0b002ee180392e84</identifier>
<identifier type="former package identifier">f:ns94075</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-23</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-94-75</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-94-75</accessId>
 <reportNumber>NSIAD-94-75</reportNumber>
 <subject>Reporting requirements</subject>
 <subject>Air Force procurement</subject>
 <subject>Military aircraft</subject>
 <subject>Bomber aircraft</subject>
 <subject>Maintenance costs</subject>
 <subject>Repair costs</subject>
 <subject>Life cycle costs</subject>
 <subject>Military cost control</subject>
 <subject>Quality control</subject>
 <subject>Quality assurance</subject>
 <identifier>B-2 Aircraft</identifier>
 <identifier>DOD Selected Acquisition Reporting System</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>B-2 Bomber: Assessment of DOD&apos;s Response to Mandated Certifications and Reports</title>
</titleInfo>
<abstract>The Air Force is restricted from using about $2.3 billion in recent
appropriations to procure B-2 aircraft until (1) it gives Congress
certifications and reports on the B-2 bomber program and (2) a law is
passed authorizing release of the funds.  In October 1993, the Secretary
of Defense certified that 28 legislative requirements associated with
B-2 performance, fiscal controls and quality practices, and submission
of a cost report had been met.  The Pentagon gave GAO evidence that the
requirements involving B-2 performance and fiscal controls and quality
practices had been met. The requirement concerning submission of a cost
report, however, has not been met.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-94-75/html/GAOREPORTS-NSIAD-94-75.htm</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-94-75</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-94-75</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-94-75; B-2 Bomber: Assessment of DOD&apos;s Response to Mandated Certifications and Reports;
            </searchTitle>
</extension>
<subject>
 <topic>Reporting requirements</topic>
 <topic>Air Force procurement</topic>
 <topic>Military aircraft</topic>
 <topic>Bomber aircraft</topic>
 <topic>Maintenance costs</topic>
 <topic>Repair costs</topic>
 <topic>Life cycle costs</topic>
 <topic>Military cost control</topic>
 <topic>Quality control</topic>
 <topic>Quality assurance</topic>
 <topic>B-2 Aircraft</topic>
 <topic>DOD Selected Acquisition Reporting System</topic>
</subject>
</mods>