<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180396b6f">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <namePart>National Security and International Affairs Division</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">2000-05-31</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>35 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:NSIAD-00-121</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-00-121</identifier>
<identifier type="local">P0b002ee180396b6f</identifier>
<identifier type="former package identifier">f:ns00121</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-28</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-NSIAD-00-121</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-NSIAD-00-121</accessId>
 <reportNumber>NSIAD-00-121</reportNumber>
 <subject>Ballistic missiles</subject>
 <subject>Defense capabilities</subject>
 <subject>Operational testing</subject>
 <subject>Weapons systems</subject>
 <subject>Naval procurement</subject>
 <subject>Cost overruns</subject>
 <subject>Air defense systems</subject>
 <identifier>Navy Theater Wide System</identifier>
 <identifier>Patriot Missile Advanced Capability-Three Upgrade</identifier>
 <identifier>DOD National Missile Defense System</identifier>
 <identifier>SDI Theater High Altitude Area Defense System</identifier>
 <identifier>Navy Area Defense Program</identifier>
 <identifier>Aegis Weapon System</identifier>
 <identifier>Standard Missile System</identifier>
 <identifier>AN/SPY-1 Radar</identifier>
 <type>Letter Report</type>
 <seriesAbbrev>NSIAD</seriesAbbrev>
</extension>
<titleInfo>
 <title>Missile Defense: Schedule for Navy Theater Wide Program</title>
</titleInfo>
<abstract>Pursuant to a congressional request, GAO provided information on the
Navy Theater Wide system, focusing on: (1) how the additional funding
provided by Congress for the program in fiscal years (FY) 1997 through
1999 was used; and (2) whether significant risks to the program remain.&lt;p/&gt;GAO noted that: (1) the Navy used the $663 million in increased funding
as intended to reduce technical risks and develop system technologies
earlier than originally planned; (2) about 41 percent was used for
system design and analysis efforts, such as reducing the technical risks
associated with improving the system&apos;s ability to differentiate intended
targets from other objects; (3) about 20 percent of the funding was used
for procuring hardware items, such as rocket motors and test interceptor
missiles; (4) according to program officials, the additional funding
also allowed the program to shift from a demonstration effort to an
acquisition program in which a weapon system will be fully developed and
produced; (5) although the Navy used this additional funding to reduce
technical risk and develop the system sooner, significant technical and
schedule risks still exist; (6) technological advancement is required to
differentiate the target from other objects; (7) such discrimination
requires that the system&apos;s computer network can process an enormous
amount of data in real time; (8) this network has not been built, and
its software must be integrated with the computer code that is already
installed on each ship&apos;s computer system; (9) current activities include
writing software, examining several computer architectures for the
network, and building the capability to test the network; (10)
technological advancement is also required in developing the capability
of the interceptor missile to seek and destroy the target; (11) GAO is
concerned that the program office has proposed a schedule calling for
initial operational testing of the missile in 2010 even though 50
percent of the required 80 missiles would be produced and delivered by
2008 and 100 percent by 2010; (12) operational testing is designed to
provide an independent evaluation of whether a system meets required
performance levels prior to beginning production; (13) GAO has found
that cost overruns and the deployment of substandard systems occur when
the Department of Defense proceeds into production before systems are
tested under operational conditions; (14) the Navy has scheduled up to 7
flight tests between July 2000 and September 2001; (15) according to
testing officials, test programs typically separate flight tests by
about 6 months; (16) a longer interval between tests gives officials
better opportunities to evaluate test results, understand problems, and
incorporate solutions into the next test; and (17) the approved level of
funding does not match the Navy program office&apos;s estimate of how much it
needs to implement the program on schedule.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-00-121/html/GAOREPORTS-NSIAD-00-121.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-NSIAD-00-121/pdf/GAOREPORTS-NSIAD-00-121.pdf</url>
</location>
<identifier type="preferred citation">GAO/NSIAD-00-121</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-NSIAD-00-121</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO/NSIAD-00-121; Missile Defense: Schedule for Navy Theater Wide Program;
            </searchTitle>
</extension>
<subject>
 <topic>Ballistic missiles</topic>
 <topic>Defense capabilities</topic>
 <topic>Operational testing</topic>
 <topic>Weapons systems</topic>
 <topic>Naval procurement</topic>
 <topic>Cost overruns</topic>
 <topic>Air defense systems</topic>
 <topic>Navy Theater Wide System</topic>
 <topic>Patriot Missile Advanced Capability-Three Upgrade</topic>
 <topic>DOD National Missile Defense System</topic>
 <topic>SDI Theater High Altitude Area Defense System</topic>
 <topic>Navy Area Defense Program</topic>
 <topic>Aegis Weapon System</topic>
 <topic>Standard Missile System</topic>
 <topic>AN/SPY-1 Radar</topic>
</subject>
</mods>