<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180377d58">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">2006-11-17</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>56 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:GAO-07-96</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-GAO-07-96</identifier>
<identifier type="local">P0b002ee180377d58</identifier>
<identifier type="former package identifier">f:d0796</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-24</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-GAO-07-96</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-GAO-07-96</accessId>
 <reportNumber>GAO-07-96</reportNumber>
 <subject>Accountability</subject>
 <subject>Cost analysis</subject>
 <subject>Cost overruns</subject>
 <subject>Defense cost control</subject>
 <subject>Defense procurement</subject>
 <subject>Procurement planning</subject>
 <subject>Program evaluation</subject>
 <subject>Program management</subject>
 <subject>Strategic planning</subject>
 <subject>Aerospace research</subject>
 <subject>Cost estimates</subject>
 <subject>Air Force Advanced Extremely High</subject>
 <subject>Frequency Satellite Program</subject>
 <type>Other Written Product</type>
 <accountNo>A63513</accountNo>
 <law congress="109" isPrivate="false" number="364"></law>
</extension>
<titleInfo>
 <title>Space Acquisitions: DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems</title>
</titleInfo>
<abstract>Estimated costs for the Department of Defense&apos;s (DOD) major space
acquisition programs have increased by about $12.2 billion from  
initial estimates for fiscal years 2006 through 2011. Cost growth
for ongoing Air Force programs above initial estimates accounts  
for a substantial portion of this 44 percent increase. In light  
of the role that optimistic estimating is believed to have played
in exacerbating space acquisition cost growth, you requested that
we examine (1) in what areas space system acquisition cost	 
estimates have been unrealistic and (2) what incentives and	 
pressures have contributed to the quality and usefulness of cost 
estimates for space system acquisitions.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-GAO-07-96/html/GAOREPORTS-GAO-07-96.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-GAO-07-96/pdf/GAOREPORTS-GAO-07-96.pdf</url>
</location>
<identifier type="preferred citation">GAO-07-96</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-GAO-07-96</url>
</location>
<note>Other Written Product</note>
<extension>
 <searchTitle>GAO-07-96; Space Acquisitions: DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems;
            </searchTitle>
</extension>
<subject>
 <topic>Accountability</topic>
 <topic>Cost analysis</topic>
 <topic>Cost overruns</topic>
 <topic>Defense cost control</topic>
 <topic>Defense procurement</topic>
 <topic>Procurement planning</topic>
 <topic>Program evaluation</topic>
 <topic>Program management</topic>
 <topic>Strategic planning</topic>
 <topic>Aerospace research</topic>
 <topic>Cost estimates</topic>
 <topic>Air Force Advanced Extremely High</topic>
 <topic>Frequency Satellite Program</topic>
</subject>
<relatedItem type="isReferencedBy">
 <titleInfo>
  <title>United States Public Law 364 (109th Congress)</title>
</titleInfo>
 <identifier type="public law citation">Public Law 109-364</identifier>
</relatedItem>
</mods>