<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee180396aad">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2010-08-12</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Printing Office</publisher>
 <dateIssued encoding="w3cdtf">2001-01-22</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>68 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:GAO-01-11</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-GAO-01-11</identifier>
<identifier type="local">P0b002ee180396aad</identifier>
<identifier type="former package identifier">f:d0111</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2010-08-12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2011-03-24</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-GAO-01-11</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>REPORT</docClass>
 <accessId>GAOREPORTS-GAO-01-11</accessId>
 <reportNumber>GAO-01-11</reportNumber>
 <subject>Construction costs</subject>
 <subject>Government facility construction</subject>
 <subject>Strategic planning</subject>
 <subject>Embassies</subject>
 <subject>Future budget projections</subject>
 <subject>Facility security</subject>
 <subject>Terrorism</subject>
 <identifier>Kampala (Uganda)</identifier>
 <identifier>Doha (Qatar)</identifier>
 <identifier>Tunis (Tunisia)</identifier>
 <identifier>Dar es Salaam (Tanzania)</identifier>
 <identifier>Nairobi (Kenya)</identifier>
 <identifier>Istanbul (Turkey)</identifier>
 <identifier>Zagreb (Croatia)</identifier>
 <identifier>Sao Paulo (Brazil)</identifier>
 <identifier>Rio de Janeiro (Brazil)</identifier>
 <identifier>Luanda (Angola)</identifier>
 <type>Letter Report</type>
</extension>
<titleInfo>
 <title>Embassy Construction: Better Long-term Planning Will</title>
</titleInfo>
<abstract>The State Department has determined that about 80 percent of overseas
U.S. diplomatic facilities lack adequate security and may be vulnerable
to terrorist attack. In September 1998, State expanded its capital
construction program to accelerate replacing its most vulnerable
embassies and consulates by acquiring sites and preparing plans at 10
priority locations. This report summarizes (1) the status of the 10
priority embassy and consulate construction projects, and (2) State&apos;s
plans for the overall construction program. As of November 2000, seven
projects are in the construction phase. The remaining three projects are
on hold pending agreement between State and Congress about the
Department&apos;s construction proposals. Although State envisions a
long-term, multi-billion dollar program and has ranked more than 180
facilities it may need to replace, it has not prepared a long-term
capital construction plan that identifies (1) proposed construction
project&apos;s cost estimates and schedules, and (2) estimated annual funding
requirements for the overall program.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-GAO-01-11/html/GAOREPORTS-GAO-01-11.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-GAO-01-11/pdf/GAOREPORTS-GAO-01-11.pdf</url>
</location>
<identifier type="preferred citation">GAO-01-11</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-GAO-01-11</url>
</location>
<note>Letter Report</note>
<extension>
 <searchTitle>GAO-01-11; Embassy Construction: Better Long-term Planning Will;
            </searchTitle>
</extension>
<subject>
 <topic>Construction costs</topic>
 <topic>Government facility construction</topic>
 <topic>Strategic planning</topic>
 <topic>Embassies</topic>
 <topic>Future budget projections</topic>
 <topic>Facility security</topic>
 <topic>Terrorism</topic>
 <topic>Kampala (Uganda)</topic>
 <topic>Doha (Qatar)</topic>
 <topic>Tunis (Tunisia)</topic>
 <topic>Dar es Salaam (Tanzania)</topic>
 <topic>Nairobi (Kenya)</topic>
 <topic>Istanbul (Turkey)</topic>
 <topic>Zagreb (Croatia)</topic>
 <topic>Sao Paulo (Brazil)</topic>
 <topic>Rio de Janeiro (Brazil)</topic>
 <topic>Luanda (Angola)</topic>
</subject>
</mods>