<mods xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" ID="P0b002ee18fd4a02d">
<name type="corporate">
 <namePart>United States Government Publishing Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">publisher</roleTerm>
  <roleTerm authority="marcrelator" type="code">pbl</roleTerm>
</role>
 <role>
  <roleTerm authority="marcrelator" type="text">distributor</roleTerm>
  <roleTerm authority="marcrelator" type="code">dst</roleTerm>
</role>
</name>
<name type="corporate">
 <namePart>United States</namePart>
 <namePart>Government Accountability Office</namePart>
 <role>
  <roleTerm authority="marcrelator" type="text">author</roleTerm>
  <roleTerm authority="marcrelator" type="code">aut</roleTerm>
</role>
 <description>Government Organization</description>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">government publication</genre>
<language>
 <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<extension>
 <collectionCode>GAOREPORTS</collectionCode>
 <category>Legislative Agency Publications</category>
 <waisDatabaseName>gao_comptroller_general</waisDatabaseName>
 <branch>legislative</branch>
 <dateIngested>2016-06-23</dateIngested>
</extension>
<originInfo>
 <publisher>U.S. Government Publishing Office</publisher>
 <dateIssued encoding="w3cdtf">1999-06-24</dateIssued>
 <issuance>monographic</issuance>
</originInfo>
<physicalDescription>
 <note type="source content type">deposited</note>
 <digitalOrigin>born digital</digitalOrigin>
 <extent>9 p.</extent>
</physicalDescription>
<classification authority="sudocs">GA 1.13:B-282295</classification>
<identifier type="uri">https://www.govinfo.gov/app/details/GAOREPORTS-B-282295</identifier>
<identifier type="local">P0b002ee18fd4a02d</identifier>
<identifier type="former package identifier">f:282295</identifier>
<recordInfo>
 <recordContentSource authority="marcorg">DGPO</recordContentSource>
 <recordCreationDate encoding="w3cdtf">2016-06-23</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2016-06-23</recordChangeDate>
 <recordIdentifier source="DGPO">GAOREPORTS-B-282295</recordIdentifier>
 <recordOrigin>machine generated</recordOrigin>
 <languageOfCataloging>
  <languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</languageOfCataloging>
</recordInfo>
<accessCondition type="GPO scope determination">fdlp</accessCondition>
<extension>
 <docClass>COMPTROLLERDECISION</docClass>
 <accessId>GAOREPORTS-B-282295</accessId>
 <reportNumber>B-282295</reportNumber>
 <type>Comptroller General Decision</type>
</extension>
<titleInfo>
 <title>Lavi Systems, Inc., B-282295, June 24, 1999</title>
</titleInfo>
<abstract>  1. Contracting agency reasonably considered the awardee an approved source
     for a solicited helicopter part, notwithstanding that the awardee was
     not listed in the solicitation as an approved source, where the
     helicopter&apos;s prime manufacturer had approved the awardee&apos;s predecessor
     as a source for the part 20 years ago; the awardee or its predecessors
     had since continually manufactured the solicited item for the prime
     manufacturer and other approved sources of the part; and the approved
     source that currently owns the drawings to the part authorized the
     awardee to submit an offer directly in response to the solicitation and
     addressed the agency&apos;s concerns about the qualification of the awardee.
  2. Contracting agency was not required to reevaluate the qualification of
     the awardee, or retest its part, where, in substituting the awardee for
     another approved source, there was no change of location or ownership
     of the plant where the part which met the qualification requirement was
     manufactured, or change in location or ownership of a previously
     qualified manufacturer or source. Even if the agency had conducted a
     reevaluation of the qualification of the awardee&apos;s predecessors
     following earlier ownership changes and relocation of the awardee&apos;s
     manufacturing facility, the protester has not shown why removal of the
     awardee or its predecessors from the approved source list was warranted
     or that retesting of the awardee&apos;s part was required.
  3. Protest allegation that the awardee&apos;s part does not comply with the
     specification, based on the protester&apos;s prior repairs to the awardee&apos;s
     part, is denied where the contracting agency has previously found that
     the awardee&apos;s part meets the specification; the awardee&apos;s first article
     test results submitted with its offer demonstrate compliance with the
     specification; and there is no evidence that the contracting agency has
     relaxed the specification for the awardee.</abstract>
<location>
 <url displayLabel="HTML rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-B-282295/html/GAOREPORTS-B-282295.htm</url>
 <url displayLabel="PDF rendition" access="raw object">https://www.govinfo.gov/content/pkg/GAOREPORTS-B-282295/pdf/GAOREPORTS-B-282295.pdf</url>
</location>
<identifier type="preferred citation">GAO/B-282295</identifier>
<location>
 <url displayLabel="Content Detail" access="object in context">https://www.govinfo.gov/app/details/GAOREPORTS-B-282295</url>
</location>
<note>Comptroller General Decision</note>
<extension>
 <searchTitle>GAO/B-282295; Lavi Systems, Inc., B-282295, June 24, 1999;
            </searchTitle>
</extension>
</mods>