United States Government Publishing Office
publisher
pbl
distributor
dst
United States
National Archives and Records Administration
Office of the Federal Register
author
aut
Government Organization
text
government publication
eng
FR
Regulatory Information
2012_register
executive
2012-04-24
article
Drawbridge Operation Regulation; Sturgeon Bay Ship Canal, Sturgeon Bay, WI
Proposed Rules
D09002ee1bdcbcac5
D09002ee1bdcbcb3a
United States
Department of Homeland Security
originator
org
United States Government Agency or Subagency
United States
Coast Guard
originator
org
United States Government Agency or Subagency
The Coast Guard proposes to establish a drawbridge operating schedule for the Maple-Oregon and Michigan Street Bridges across the Sturgeon Bay Ship Canal, at miles 4.17 and 4.3, in Sturgeon Bay, Wisconsin. The establishment of this schedule is necessary due to the construction of the Maple-Oregon Street Bridge and the completed rehabilitation of the Michigan Street Bridge. The proposed regulation also confirms the winter drawbridge schedules for all three drawbridges over Sturgeon Bay Ship Canal, including the two bridges above and the Bayview Bridge at mile 3.0.
77 FR 21890
https://www.govinfo.gov/app/details/FR-2012-04-12/2012-8813
2012-8813
fr12ap12-15
RIN 1625-AA09
9110-04-P
Docket No. USCG-2011-1109
https://www.govinfo.gov/app/details/FR-2012-04-12/2012-8813
https://www.govinfo.gov/content/pkg/FR-2012-04-12/html/2012-8813.htm
https://www.govinfo.gov/content/pkg/FR-2012-04-12/pdf/2012-8813.pdf
Bridges
4 p.
21890
21893
77 FR 21890
Code of Federal Regulations
Title 33 Part 117
33 CFR Part 117
Regulation Identification Number 1625-AA09
RIN 1625-AA09
Drawbridge Operation Regulation; Sturgeon Bay Ship Canal, Sturgeon Bay, WI; Federal Register Vol. 77, Issue
PRORULE
2012-8813
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
2012-05-14
Docket No. USCG-2011-1109
9110-04-P
2012-8813
Notice of proposed rulemaking.
The Coast Guard proposes to establish a drawbridge operating schedule for the Maple-Oregon and Michigan Street Bridges across the Sturgeon Bay Ship Canal, at miles 4.17 and 4.3, in Sturgeon Bay, Wisconsin. The establishment of this schedule is necessary due to the construction of the Maple-Oregon Street Bridge and the completed rehabilitation of the Michigan Street Bridge. The proposed regulation also confirms the winter drawbridge schedules for all three drawbridges over Sturgeon Bay Ship Canal, including the two bridges above and the Bayview Bridge at mile 3.0.
Comments and related material must reach the Coast Guard on or before: May 14, 2012.
If you have questions on this proposed rule, call or email Mr. Lee Soule, Bridge Management Specialist, Ninth Coast Guard District; telephone (216) 902-6085, email Lee.D.Soule@uscg.mil. If you have questions on viewing or submitting material to the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone (202) 366-9826.
Bridges
Drawbridge Operations:
Sturgeon Bay Ship Canal, Sturgeon Bay, WI.
,
Lee.D.Soule@uscg.mil
http://www.regulations.gov
Federal Register
Vol. 77, no. 71
Office of the Federal Register, National Archives and Records Administration
2012-04-12
continuing
daily
deposited
born digital
352 p.
Table of Contents:
AE 2.7:
GS 4.107:
AE 2.106:
KF70.A2
https://www.govinfo.gov/app/details/FR-2012-04-12
P0b002ee1825d1654
0097-6326
0042-1219
0364-1406
769-004-00000-9
000582072
f:fr12ap12
https://www.govinfo.gov/app/details/FR-2012-04-12
https://www.govinfo.gov/content/pkg/FR-2012-04-12/pdf/FR-2012-04-12.pdf
https://www.govinfo.gov/content/pkg/FR-2012-04-12/xml/FR-2012-04-12.xml
fdlp
21841
22184
DGPO
2012-04-24
2023-04-30
FR-2012-04-12
machine generated
eng
FR
FR-2012-04-12
77
71