[List of CFR Sections Affected (LSA), August 2016] [From the U.S. Government Publishing Office, www.gpo.gov] TITLE 16_COMMERCIAL PRACTICES Chapter I_Federal Trade Commission (Parts 0_999) 1.98 (Subpart L) Revised; interim...............................16-42478 1.100 (a) amended................................................16-2742 1.110--1.119 (Subpart P) Added...................................16-2742 1.120--1.124 (Subpart Q) Added...................................16-2742 305.7 (g) revised................................................16-7202 305.10 (b) revised...............................................16-7202 305.11 (f)(9)(viii) removed; (f)(9)(ix) and (x) redesignated as new (f)(9)(viii) and (ix); (f)(5), (6), (9)(ii) and new (viii) revised..................16-7202 305 Appendices F1 and F2 revised; Appendix L amended......................................................16-7202 306.0 (b), (i), (j) and (l) revised; (o) added...................16-2062 306.5 Revised....................................................16-2063 306.6 (b) revised................................................16-2063 306.10 (a) and (f) revised.......................................16-2063 306.12 (a)(4) through (9) redesignated as (a)(5) through (10); new (a)(4) added; (f) amended..................16-2063 306.13 Added.....................................................16-2064 310.8 (c) and (d) revised.......................................16-59845 436.8 (a)(1), (5)(i) and (ii) amended...........................16-31501 Chapter II_Consumer Product Safety Commission (Parts 1000_1799) 1031 Authority citation revised..................................16-5377 1031.10 (b) amended..............................................16-5377 1031.11 (c), (d) and (e) revised; (f) removed....................16-5377 1031.12 (b) revised; (c) amended.................................16-5377 1109.1 Regulation at 80 FR 61732 eff. date further delayed to 2-12-16..............................................16-2 1109.5 Regulation at 80 FR 61732 eff. date further delayed to 2-12-16..............................................16-2 1109.11 Regulation at 80 FR 61732 eff. date further delayed to 2-12-16......................................16-2 1109.13 Regulation at 80 FR 61732 eff. date further delayed to 2-12-16......................................16-2 1112.15 (b)(40) added...........................................16-17065 1201.2 (a)(3) introductory text and (4) introductory text revised...................................16-15431 1201.4 Revised..................................................16-15431 1201.1--1201.7 (Subpart A) Figures 1 through 5 removed.....................................................16-15431 1211.2 (c) revised..............................................16-20228 1211.4 (c) revised..............................................16-20228 1211.5 (a)(1), (6), (b) introductory text and (3) revised.....................................................16-20228 1211.6 Revised..................................................16-20228 1211.7 Revised..................................................16-20228 1211.8 Revised..................................................16-20230 1211.9 (a), (b)(2) and (c) revised..............................16-20231 1211.10 Revised.................................................16-20231 1211.11 Revised.................................................16-20232 1211.12 (a)(1), (c)(1), (2) and (d) revised.....................16-20233 1211.13 Revised.................................................16-20233 1211.14 Redesignated as 1211.16; added..........................16-20234 [[Page 41]] 1211.15 Redesignated as 1211.17.................................16-20234 Added.........................................................16-20235 1211.16 Redesignated as 1211.18; redesignated from 1211.14.....................................................16-20234 Revised.......................................................16-20235 1211.17 Redesignated as 1211.19; redesignated from 1211.15.....................................................16-20234 (h) and (i) redesignated as (i) and (j); (g)(2)(v), new (h), (k), (l) and (m) added..................16-20237 1211.18 Redesignated from 1211.16...............................16-20234 (f) through (k) redesignated as (g) through (l); (b)(3), (c), new (i),new (j) and new (k) revised; new (f), (m) and (n) added.........................16-20237 1211.19 Redesignated from 1211.17...............................16-20234 (b) revised...................................................16-20238 1211.1--1211.17 (Subpart A) Figures 1 through 10 and table added.............................................16-20238 1211.40 (Subpart D) Added.......................................16-20245 1227.2 Revised..................................................16-37132 1233 Added......................................................16-17065 1500 Regulation at 80 FR 61732 eff. date further delayed to 2-12-16..............................................16-2 1500.91 Regulation at 80 FR 61732 eff. date further delayed to 2-12-16......................................16-2 1610 Policy statement...........................................16-12587 Proposed Rules: 0--999 (Ch. I).........................................16-7716, 16-51824 23.....................................................16-1349, 16-11697 259...................................................16-36216, 16-52780 304.............................................................16-23219 460...................................................16-19936, 16-35661 701.............................................................16-32680 702.............................................................16-32680 1025............................................................16-21775 1231.............................................................16-3354 1308............................................................16-54754