Nuclear Safety: Concerns with the Nuclear Power Reactors in Cuba
(Testimony, 08/01/95, GAO/T-RCED-95-236).
It is uncertain if an when Cuba's nuclear power reactors will be
operational. It appears that no progress has been made on the
construction of the reactors since GAO issued its last report on this
subject (GAO/RCED-92-262, Sept. 1992). The civil construction, such as
floors and walls, of the first reactor is estimated to be more than 90
percent complete, while the second reactor is only between 20 to 30
percent complete. However, if Cuba obtains the assistance necessary to
finish building the reactors, several concerns must be resolved. These
include the quality of the civil construction completed so far, the lack
of a regulatory organization, and the adequacy of operator training.
Although the reactor will have a containment building and an emergency
core-cooling system, which lessens the likelihood of a radiation escape
during an accident, the containment dome was not designed to withstand
pressures as great as U.S. containment structures can withstand. GAO
concludes that continued monitoring of Cuba's progress toward completing
the reactors is warranted.
--------------------------- Indexing Terms -----------------------------
REPORTNUM: T-RCED-95-236
TITLE: Nuclear Safety: Concerns with the Nuclear Power Reactors in
Cuba
DATE: 08/01/95
SUBJECT: Nuclear powerplant construction
Nuclear powerplant safety
Foreign governments
Nuclear proliferation
Nuclear reactors
International relations
Treaties
Radiation accidents
Human resources training
IDENTIFIER: Cuba
Soviet Union
Russia
Cienfuegos (Cuba)
------------------------------------------------------------------------
We regret that electronic text of GAO Testimony is not available at
this time.
See the GAO FAQ - Section 2.0 for printed copy ordering information.
The FAQ is automatically retrieved with all WAIS search results or
can be obtained by sending e-mail to: info@www.gao.gov