FAA Budget: Management Attention Needed for Future Investment Decisions
(Testimony, 04/21/94, GAO/T-RCED-94-195).
At just more than $8.8 billion, the Federal Aviation Administration's
(FAA) fiscal year 1995 budget request represents a two-percent increase
over the previous year's appropriation. This includes $2.3 billion for
facilities and equipment; $4.6 billion for operations; $1.7 billion for
the Airport Improvement Program; and $267 million for research,
engineering, and development. About $6.6 billion will be charged to the
Airport and Airway Trust Fund and the rest charged to the General Fund.
At these levels, expenditures would exceed trust fund receipts from user
fees that are estimated at under $6 billion for fiscal year 1995. The
fiscal year 1995 budget would continue the trend of drawing down the
trust fund balance. Against this financial backdrop, FAA faces major
challenges. How FAA meets them will affect profoundly the nation's
airports and airlines as well as the traveling public. This testimony
focuses on air traffic control modernization, work force operations in a
period of downsizing, the use of Airport Improvement Program money, and
research and development for detecting explosives.
--------------------------- Indexing Terms -----------------------------
REPORTNUM: T-RCED-94-195
TITLE: FAA Budget: Management Attention Needed for Future
Investment Decisions
DATE: 04/21/94
SUBJECT: Air transportation operations
Mission budgeting
Transportation safety
Funds management
Future budget projections
Agency missions
Air traffic control systems
Appropriated funds
Facility security
Terrorism
IDENTIFIER: FAA Air Traffic Control Modernization Program
FAA Airport Improvement Program
Airport and Airway Trust Fund
Military Airport Program
FAA Advanced Automation System
FAA Airport Surface Detection Equipment Radar
FAA Mode S Surveillance System
FAA Air Route Surveillance Radar-3 Long-Range Radar System
FAA Air Route Surveillance Radar-4
FAA Automated Terminal Doppler Radar Warning System
FAA Passenger Facility Charge Program
FAA Voice Switching and Control System
Microwave Landing System
FAA Initial Sector Suite System
FAA En Route Air Traffic Control System
NAVSTAR Global Positioning System
GPS
------------------------------------------------------------------------
We regret that electronic text of GAO Testimony is not available at
this time.
See the GAO FAQ - Section 2.0 for printed copy ordering information.
The FAQ is automatically retrieved with all WAIS search results or
can be obtained by sending e-mail to: [email protected]