Acquisition Reform: Role of Test and Evaluation in System Acquisition
Should Not Be Weakened (Testimony, 03/22/94, GAO/T-NSIAD-94-124).
GAO generally supports the acquisition reform proposals now before
Congress. Most of the proposed changes to the current test and
evaluation legislation should not be enacted, however, because they
address perceived rather than documented problems and because they would
undermine a key management control over the system acquisition process.
Given the problems that GAO continues to find in the acquisition of
defense systems, the priority given to test and evaluation should
increase, not decrease, as would occur if the proposed legislation were
enacted. GAO's reviews of test and evaluation issues, the defense system
acquisition process, and many individual weapon programs have
consistently shown that independent operational test and evaluation is
the most realistic way, short of war, to determine whether the Pentagon
is getting what it paid for. GAO also believes that, if a program is
"sold" on meeting certain requirements, the Defense Department's
commitment to that program should be strictly limited until those
requirements have been adequately demonstrated. Hence, GAO believes that
any change to the current test and evaluation legislation should at
least preserve, if not strengthen, this "fly-before-buy" principle.
--------------------------- Indexing Terms -----------------------------
REPORTNUM: T-NSIAD-94-124
TITLE: Acquisition Reform: Role of Test and Evaluation in System
Acquisition Should Not Be Weakened
DATE: 03/22/94
SUBJECT: Defense procurement
Testing
Proposed legislation
Federal procurement policies
Military systems analysis
Weapons systems
Internal controls
Procurement evaluation
Defense cost control
Procurement procedures
IDENTIFIER: PHOENIX Missile
Army Heavy Equipment Transporter System
Family of Medium Tactical Vehicles
Army Palletized Load System
Advanced Medium Range Air-to-Air Missile
B-1B Aircraft
C-17 Aircraft
Short Range Unmanned Aerial Vehicle
B-2 Aircraft
T-45 Aircraft
F/A-18E/F Aircraft
F-22 Aircraft
FMTV
AMRAAM
------------------------------------------------------------------------
We regret that electronic text of GAO Testimony is not available at
this time.
See the GAO FAQ - Section 2.0 for printed copy ordering information.
The FAQ is automatically retrieved with all WAIS search results or
can be obtained by sending e-mail to: [email protected]