TITLE: States Roofing Corporation, B-286052, November 8, 2000
BNUMBER: B-286052
DATE: November 8, 2000
**********************************************************************
States Roofing Corporation, B-286052, November 8, 2000
Decision
Matter of: States Roofing Corporation
File: B-286052
Date: November 8, 2000
Neil S. Lowenstein, Esq., Vandeventer Black, for the protester.
Clarence D. Long, III, Esq., Capt. Sky W. Smith, and Capt. Jennifer C.
Whitko, Department of the Air Force, for the agency.
Paul E. Jordan, Esq., and John M. Melody, Esq., Office of the General
Counsel, GAO, participated in the preparation of the decision.
DIGEST
Agency properly rejected protester's proposal as late where preponderance of
evidence shows that the proposal was not under government control prior to
the time set for receipt of proposals because the protester did not arrive
at the place designated for receipt of proposals until after the closing
time had passed.
DECISION
States Roofing Corporation (SRC) protests the rejection of its late proposal
under request for proposals (RFP) No. F-44600-00-R-0028, issued by the
Department of the Air Force for roofing repair services. SRC contends that
its proposal was received by the government prior to the closing time for
receipt of proposals.
We deny the protest.
BACKGROUND
The RFP provided that sealed offers were due at "1CONS/LGCC, 74 Nealy Ave.,
Suite 100," by 4 p.m. local time on July 31, 2000, and that "ALL HAND
CARRIED OFFERS MUST BE PLACED IN THE BID DEPOSITORY AT 74 NEALY AVE.,
LANGLEY AFB, VA." RFP at 1.
The facts, according to the agency, are as follows. On July 31,
approximately
10 minutes before the 4 p.m. closing time, the Infrastructure Flight Chief
at Langley (hereinafter "chief") and the contracting officer for this
procurement retrieved proposals from the bid box, which is located beside
the entrance door and in front of Suite 100. Affidavits of Contracting
Officer, Aug. 11, 2000, and Chief, Sept. 1, 2000. SRC's proposal was not in
the box at this time. The contracting officer and the chief then went out on
the front porch of the building to await delivery of a proposal from another
offeror.
While the chief and the contracting officer were on the front porch, they
received another proposal, but did not see SRC's representative enter the
building or arrive in the parking lot in front of the building. Affidavits
of Chief and Contracting Officer. At 4 p.m., according to the chief's watch,
they came back inside, accounted for the proposals received up to that
point, and then stamped a sheet of paper in the time-stamp machine located
in Suite 100 to verify that the closing time had passed. [1] Id. The time
stamp read: "00 JUL 31 PM 4:01." Agency Report (AR), Tab 6a. Shortly after
this, they walked upstairs to begin opening the proposals. Affidavit of
Chief. At this time, the receptionist, whose desk is in Suite 100, was
standing in the doorway of the office next door, from where she could see
the front door (the only entrance to the building), the bid box, and the
porch. Affidavit of Receptionist, Aug. 15, 2000. Before entering the office
next door, she saw the chief open the bid box before going upstairs. She did
not see SRC's representative enter the building during this time. Id.
Throughout this time, the 14-year old daughter of the receptionist
(hereinafter "daughter") was seated alone in Suite 100 and observed the
chief and the contracting officer come downstairs, exit to the porch,
receive proposals, return to Suite 100, and time-stamp a sheet of paper.
Affidavit of Daughter, Aug. 15, 2000. According to the daughter's affidavit,
a few minutes after the chief and the contracting officer returned upstairs,
a man (the representative of the protester) entered the office and
instructed her to "stamp 2 packages hastily," one of which was SRC's
proposal. [2] Although she attempted to tell him that she did not work in
the contracting office, he cut her off and "rush[ed]" her to time-stamp the
packages. She attempted to do so, but could not fit them into the time-stamp
machine because they were too thick. The protester then instructed her to
write "3:59" on the packages and to sign her name. She complied and then,
accompanied by the protester, went next door to the office where the
receptionist (her mother) was. Upon hearing what happened, the receptionist
informed SRC's representative that his proposal was late and
immediately returned to Suite 100 and time-stamped a sheet of paper.
Affidavits of Receptionist and Daughter. The time stamp on this sheet read:
"00 JUL 31 PM 4:05." AR tab 6b. The receptionist then turned the matter over
to the chief and the contracting officer, who also informed the protester
that the proposal was late and showed him the paper time-stamped "4:01."
Affidavits of Chief and Contracting Officer.
The protester has presented a different account of the facts. Its original
version of the events, set forth in its letter of protest, was as follows:
[The protester], President of States Roofing Corporation ("SRC"), hand
delivered SRC's offer before [4 p.m.], and provided [it] to your employee at
the front desk. At or about [3:58 p.m.,] that employee attempted to time
stamp the offer using your time clock, but the offer package was too thick
to fit into the time stamp. She did, however, confirm by hand note and
signature on the offer envelope that she received it as of [3:59 p.m.].
Protest attach. 3, Letter from SRC (Aug. 2, 2000).
In a subsequent affidavit, prepared after the agency submitted its report,
the protester provided the following additional details. The protester's
representative was dropped off in front of the building prior to 4 p.m., and
he went immediately to Suite 100. Affidavit of Protester, Aug. 25, 2000.
There, he found the daughter sitting at the receptionist's desk and, based
on prior experience, concluded that she must be the person who would receive
proposals. [3] At that time, the wall clock showed an unspecified time
before 4 p.m. The daughter "never indicated . . . that the government did
not employ her or that she was not authorized to accept proposals" and, when
asked, said that she was accepting proposals. When she was unsuccessful in
her attempt to time-stamp the proposal, "[a]t [his] request, she thereafter
noted the time by hand written notation, and signed the same." All of this
occurred prior to 4 p.m. according to the wall clock; the time-stamp clock
had no exterior display. The daughter placed SRC's proposal on the counter
and the protester left the office to look for the "proposal opening." As he
"walked through the building," he encountered the receptionist, advised her
of what had happened, and they returned to Suite 100, where SRC's proposal
remained on the counter. Affidavit of Protester. He then discussed the
matter with the chief and the contracting officer, who showed him the "4:01"
time-stamp and informed him that the proposal was late.
By letter of August 2, SRC requested the agency to reconsider its
determination that its proposal was late. The agency declined, and SRC filed
this protest with our Office on August 9.
ANALYSIS
It is an offeror's responsibility to deliver its proposal to the proper
place at the proper time, and late delivery generally requires rejection of
a proposal. Federal Acquisition Regulation (FAR) sect. 15.208(b); The Staubach
Co., B-276486, May 19, 1997, 97-1 CPD para. 190 at 3. In determining whether a
proposal was submitted late, we consider all relevant evidence in the
record, including statements by parties on behalf of the protester and the
agency, to ascertain whether a preponderance of the evidence shows that the
proposal was at the government installation designated for receipt of
proposals, and under the government's control, prior to the time set for
receipt of proposals. FAR sect. 15.208(b)(1)(ii); see Caddell Constr. Co., Inc.,
B-280405, Aug. 24, 1998, 98-2 CPD para. 50 at 6; International Steel Erectors,
B-233238, Feb. 13, 1989, 89-1 CPD para. 146 at 3. Considering all of the
evidence here, we conclude that the agency properly determined that SRC's
proposal was submitted late.
The timeliness of SRC's proposal turns solely on the sequence of two
events--the contracting officer's time-stamping of the sheet of paper at
4:01, and the protester's arrival in Suite 100. If SRC arrived prior to the
time-stamping, its proposal was timely submitted, since the contracting
officer used the time-stamping to signify that the closing time had passed;
[4] if the protester's delivery of its proposal occurred after the sheet of
paper was time-stamped, it was late. The most probative evidence of the
sequence of these events is the statement of the daughter, who undisputedly
was actually in Suite 100 during the entire time in question, and was the
only person who saw both the contracting officer time-stamp the piece of
paper at 4:01, and SRC deliver its proposal. As noted, the daughter states
that she observed the contracting officer and chief return from the porch
and time-stamp the sheet of paper, and that it was not until after this
happened, and the agency officials left Suite 100, that she observed SRC's
representative enter with the firm's proposal. SRC does not challenge the
daughter's account of the sequence of the two events and, indeed, is not in
a position to do so since its representative did not witness the 4:01 time
stamp.
The only evidence in the record that supports SRC's account of the sequence
of events is the "3:59" notation written on SRC's proposal package by the
daughter, and the protester's representative's statement. We are not
persuaded by this evidence, however, because it appears to reflect a
discrepancy between the time on the wall clock and the time on the
time-stamp clock. The time written on the package and the time of delivery
according to the protester's representative were based on the time shown on
the wall clock in Suite 100, while the passing of the closing time was
signified by the time-stamp clock. According to the agency, the wall clock
in Suite 100 runs slow relative to the time-stamp clock. [5] The protester
has no basis for disputing the difference in the clocks' respective times
since, as he acknowledges, the time-stamp clock did not have an exterior
display. This means that the events SRC maintains occurred just prior to
4:00 p.m. actually would have occurred shortly after that time according to
the time-stamp clock. That is, while SRC's representative asserts that he
delivered the proposal by 3:58 or 3:59 p.m. based on the wall clock, it
appears he may not have been in Suite 100 until after 4 p.m. according to
the time-stamp machine. We conclude that SRC's proposal was not submitted
prior to the closing time and that the agency properly rejected it as late.
[6]
The protest is denied. [7]
Anthony H. Gamboa
Acting General Counsel
Notes
1. According to the agency, the time-stamp clock is set to U.S. Naval
Observatory time and is used "to set bid opening." Government's Response to
Protestor's Rebuttal at 1.f. The time on the clock reportedly was verified
with Naval Observatory time on July 27 and again at 4:30 p.m. on July 31; in
both instances, the clock time was the same as that at the Naval
Observatory. Contracting Officer's Statement at 4.
2. The other was the unsealed proposal of another offeror that had asked SRC
to deliver its proposal. Affidavit of Protester, Aug. 25, 2000.
3. At the time, the daughter was dressed in "blue jeans and a t-shirt and
had pig tails in her hair." Government's Response to Protester's Rebuttal at
3.b.
4. In this regard, the agency reports that the time-stamp machine is used as
the official clock for determining proposal deadlines.
5. While the contracting officer initially stated that the clock was
approximately 5 minutes fast, the agency subsequently explained that the
contracting officer knew only that the clock had accuracy problems and could
not remember if it ran fast or slow. Government's Response to Protester's
Rebuttal at 1.f. Meanwhile, the receptionist, who works in Suite 100, states
unequivocally that the clock, which is battery-operated, runs slow.
Affidavit of Receptionist. Given the agency's explanation, and the fact that
the receptionist is in the best position to know how accurate the clock is,
it is reasonable to conclude that the wall clock ran slow.
6. SRC's driver states in his affidavit that he dropped off SRC's
representative, and saw him enter Suite 100, prior to 4:00 p.m. Affidavit of
Driver, Aug. 25, 2000. According to the driver, he was "sure of that time
because he had the vehicle's radio on, . . . and the news, which regularly
begins at the top of the hour, had not yet begun." Id. This uncorroborated
statement is not persuasive, however, since the driver does not state when,
if ever, he heard the news begin after dropping off the protester; based on
his account, it is possible to conclude that the news report had been
completed before he turned on the radio. Similarly, there is no way to
determine whether he was mistaken about the station or its news schedule, or
whether the source the radio station uses for scheduling its news reports is
synchronized with Naval Observatory time.
7. SRC requested that we conduct a hearing on its protest to resolve the
inconsistencies in the agency's and protester's versions of the events.
However, because we find that the record is sufficient to establish that
SRC's proposal was late, no useful purpose would be served by conducting a
hearing.