BNUMBER: B-273010
DATE: November 12, 1996
TITLE: AABLE Tank Services, Inc.
**********************************************************************
Matter of:AABLE Tank Services, Inc.
File: B-273010
Date:November 12, 1996
Emmett Bonfield for the protester.
Daryl L. Streed for Environmental Contractors of Illinois, Inc., an
intervenor.
Joshua A. Kranzberg, Esq., and Melinda N. Finucane, Esq., Department
of the Army, for the agency.
Jerold D. Cohen, Esq., Office of the General Counsel, GAO,
participated in the preparation of the decision.
DIGEST
Solicitation provided that bids were due at Savanna, Illinois by 2
p.m. local time, but low bidder sent its bid to Letterkenny Army Depot
in Pennsylvania--which had issued the solicitation--at the direction
of the Letterkenny contract specialist (identified in the solicitation
as the person to contact for further information), where the bid was
opened at 2 p.m. Letterkenny time (1 hour ahead of Savanna time).
Acceptance of the bid was proper, since government misdirection of the
bid to Letterkenny was the sole cause of the bid's nonreceipt at
Savanna, and acceptance would not compromise the integrity of the
competitive system.
DECISION
AABLE Tank Services, Inc. protests the proposed award of a contract to
Environmental Contractors of Illinois, Inc. (ECI) under invitation for
bids (IFB)
No. DAAC67-96-B-0027 issued by the Department of the Army�s
Letterkenny Army Depot (LEAD) in Chambersburg, Pennsylvania, for the
removal and installation of underground fuel storage tanks at the
Savanna Army Depot Activity in Savanna, Illinois. AABLE argues that
ECI�s bid should be rejected because it was not delivered to the
address specified in the solicitation.
We deny the protest.
The IFB�s cover page (Standard Form 1442) indicated that the
solicitation was �issued by� LEAD (item 7); that a vendor should
�address offer to� Savanna (item 8); and that bids were due, for
public opening, "at the place specified in item 8" by
2 p.m. �local time� on Thursday June 20, 1996 (item 13). According to
the Army, the cover page was mistaken in that LEAD normally both
issues solicitations and holds bid openings for Savanna procurements
expected to exceed $25,000 (Savanna is
a depot activity under LEAD); vendors thus should have been advised to
send bids to LEAD by 2 p.m. The contract specialist, located at LEAD
and unaware of the IFB error, advised a number of prospective bidders
who called for information to send their bids to LEAD, in keeping with
normal procedures.
Savanna received six bids on June 20 shortly before noon Central
Daylight Time (CDT), which is local Savanna time. The bids had been
delivered by commercial carriers, and were forwarded unopened by a
Savanna employee to the contracting officer�s representative (COR) at
Savanna who was to be responsible for the project after award.
Meanwhile, the LEAD contract specialist, assuming that bid opening was
2 p.m. Eastern Daylight Time (EDT)--the local LEAD time--accepted and
opened two bids in the presence of another LEAD contract specialist.
ECI�s bid, which had arrived at LEAD via UPS 4 hours early, was the
lower of the two opened, at $104,100.
The Savanna COR, upon noting the six bids at his desk, called the LEAD
contract specialist at 1:15 p.m. CDT, or 2:15 p.m. LEAD time--15
minutes after the two LEAD bids had been opened--at which time the
IFB error finally was noted. Because Savanna bids normally are opened
at LEAD, the COR sent the six unopened bids to LEAD the next morning
(Friday June 21) via certified priority mail, and they arrived and
were opened on June 24. AABLE submitted the lowest of the Savanna
bids, $127,530, which was second low overall.
AABLE protests that as the low bidder based on the bids sent to the
proper address as designated in the solicitation--Savanna--AABLE is
entitled to the contract award. ECI, in commenting on AABLE's protest,
states that after receiving the solicitation and noting the different
addresses in items 7 and 8 of the cover sheet it called the LEAD
contract specialist, whom the IFB identified as the source for further
information, in order to verify where the bid was to be mailed. ECI
asserts that it was told to send the bid to LEAD, and argues that
award to ECI thus is proper as ECI submitted the lowest of all bids
received. The Army responds to AABLE's protest as follows:
�. . . all eight bids submitted in response to the solicitation
were received prior to [2:00 p.m.] EDT at LEAD and [1:00 p.m.]
CDT at Savanna, so none can be considered late no matter at which
location they were received. Once the bids were received, they
remained under Government control, and the bidders did not have
an opportunity to change their bids. Although the bid opening at
LEAD on July [sic] 20 was public, only the contract specialist
and another government employee were present at that time.
Immediately after the bids were opened, the COR from Savanna
called, so the results of the LEAD bid opening were not revealed
at that time. It was not until June 24, 1996, after the bids
were received from Savanna, that the remaining bids were opened,
and that information about all of the bids was released.�
The Army concludes that acceptance of ECI's bid therefore is proper.
As a general rule, the place and time for bid submission is determined
by the relevant provision in the IFB itself. In this case, according
to the IFB bids clearly were to be submitted to Savanna by 2 p.m. CDT
("local time") on June 20, so that, in our view, any bids submitted
elsewhere were sent to the wrong place. The fact that the Army may
have considered Savanna to be the wrong place, based on LEAD/Savanna
standard operating procedures, does not change the submission
groundrules the agency advertised to potential competitors. The
issue, then, is whether award to ECI, which timely sent its bid to
LEAD in response to the contract specialist's misdirection, instead of
award to AABLE, which correctly sent its bid on time to Savanna, is
proper.
We believe the issue should be resolved by reference to the rules
governing late bids. The reason is that ECI's bid was, in effect,
"late" in that it never reached Savanna--a bid can only be timely if
it is received at the office designated in the solicitation by the
exact time specified for receipt. See Federal Acquisition Regulation
(FAR) sec. 14.304. Reference to late bid rules supports award to ECI.
Bidders generally are responsible for delivering their bids to the
proper place at the proper time. Watson Agency, Inc., B-241072, Dec.
19, 1990, 90-2 CPD para. 506. At the same time, however, the government
has the duty to establish procedures for the timely receipt of bids.
Select, Inc., B-245820.2, Jan. 3, 1992, 92-1 CPD para. 22. Accordingly,
one of the fundamental principles underlying the rules for the
consideration of late bids is that a bidder who has done all it could
and should to fulfill its responsibility should not suffer if the bid
did not arrive as required because the government failed in its own
responsibility, if otherwise consistent with the integrity of the
competitive system. We therefore have held that a late hand-carried
bid may be considered for award if to do so would not compromise the
competitive system and either the government's "affirmative
misdirection" made timely delivery impossible, see Select, Inc.,
supra, or government mishandling after timely receipt by the agency
was the sole or paramount cause for the bid's late receipt at the
designated location. See, e.g., Kelton Contracting, Inc., B-262255,
Dec. 12, 1995, 95-2 CPD para. 254. For other late bids, FAR sec. 14.304
provides that they may be considered basically if the bidder sent the
bid enough in advance so that normal delivery should have resulted in
timely receipt at the bid opening location.[1]
Recognizing the late bid rules' underlying principle as set out above,
we long have held that a strict and literal application of the rule
that a bid must be at the right place on time in order to be
considered should not be used to reject a bid where to do so would
contravene the intent and spirit of the competitive system. See,
e.g., 42 Comp. Gen. 508 (1963); I&E Constr. Co., Inc., 55 Comp. Gen.
1340 (1976), 76-2 CPD para. 139; Saint Louis Truckpointing and Painting
Co., Inc., B-212351.2,
Nov. 18, 1983, 83-2 CPD para. 588. While the late bid regulations are
intended to ensure that a late bid will not be considered if there
exists any possibility that the late bidder would gain an unfair
competitive advantage over other bidders, I&E Constr. Co., Inc.,
supra, as we stated in Hydro Fitting Mfg. Corp., 54 Comp. Gen. 999,
1003 (1975), 75-1 CPD para. 331:
"The purpose of the rules governing consideration of late bids is
to insure for the Government the benefits of the maximum of
legitimate competition, not to give one bidder a wholly unmerited
advantage over another by over-technical application of the
rules."
In our view, the government was the paramount cause of the "late"
receipt of ECI's hand-carried bid. We have permitted late
hand-carried bids to be considered where the bidder's reasonable
reliance on improper delivery instructions by knowledgeable government
personnel made it impossible for the bid to be timely delivered to the
bid opening location. See, e.g., Scot, Inc., 57 Comp. Gen. 119
(1977), 77-2 CPD para. 425; Select, Inc., supra; LeChase Constr. Corp.,
B-183609, July 1, 1975, 75-2 CPD para. 5.[2] Here, ECI asserts that it
submitted its bid to LEAD based on direction from the contract
specialist, specified in the IFB as the person to provide bidding
information--although the Army has not provided direct support of an
ECI/contract specialist conversation, ECI's assertion in that regard
is consistent with the Army's statement about the contract
specialist's advice to prospective bidders.[3] We do not see how ECI,
having received such instruction, could have been expected to send the
bid to other than LEAD--in short, we find no fault on ECI's part with
respect to the submission of its bid.
We also see no jeopardy to the integrity of the competitive bidding
system by award to ECI. The government had custody of ECI's bid well
before 2 p.m. Savanna time--even before the protester submitted its
bid to Savanna--and in fact opened and exposed it (to two contract
specialists) at 1 p.m. Savanna time (after all the bids were in
government custody). ECI obviously never had the opportunity to alter
its bid after submission to acquire an advantage over other bidders,
see Scot, Inc., supra, nor, given the way Savanna and LEAD handled the
situation, did the firm have the chance to withdraw the bid before the
Savanna bids were opened at LEAD on June 24. We do not see how the
system can be considered to be compromised in any way--or AABLE
competitively prejudiced--by accepting the earlier-opened (albeit in
the wrong place) lower bid.
In sum, the government was the cause of ECI's submission of its bid to
LEAD rather than to Savanna, and award to ECI would have no adverse
effect on the competitive bidding system. Application of the late bid
rules to preclude award to ECI simply because it was not one of the
bids received at Savanna on time would, in these circumstances, be
illogical.
The protest is denied.
Comptroller General
of the United States
1. Specifically, a late bid may be considered if the bid (1) was sent
by registered or certified mail not later than the fifth calendar day
before bid opening; (2) was sent by mail (or by telegram or facsimile,
if authorized) and the late receipt was due solely to government
mishandling after receipt at the government installation;
(3) was sent by U.S. Postal Service Express Mail Next Day Service not
later than
2 working days before bid opening; or (4) was transmitted through an
electronic commerce method authorized by the solicitation and was
received no later than
1 working day before bid opening.
2. The Army advises that even if the contract specialist had
recognized the error upon receiving ECI's bid, there would not have
been enough time to get it to Savanna before 2 p.m. CDT.
3. ECI actually included both the Savanna and LEAD addresses on its
bid envelope, which identified the contents as a sealed bid for the
instant solicitation, and on the UPS delivery label, which specified
the contents as a sealed bid for Savanna with delivery to LEAD.