[Federal Register Volume 91, Number 164 (Wednesday, August 26, 2026)]
[Notices]
[Pages 55125-55127]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-17408]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-498; NRC-2026-4192]


STP Nuclear Operating Company; South Texas Project, Unit 1; 
License Amendment Application

AGENCY: Nuclear Regulatory Commission.

ACTION: Opportunity to comment, request a hearing, and petition for 
leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC, the Commission) 
is considering issuance of an amendment to Renewed Facility Operating 
License No. NPF-76, issued to STP Nuclear Operating Company (STPNOC); 
Constellation South Texas, LLC; City Public Service Board of San 
Antonio; and City of Austin, Texas, for operation of South Texas 
Project, Unit 1 (STP). The proposed license amendment would, if 
granted, make a one-time exigent change to the technical specifications 
(TS) to extend the allowed outage time (AOT) for TS 3.7.1.7, ``Main 
Feedwater System''. This proposed amendment is being requested to 
facilitate repairs to the Unit 1 train D main feedwater isolation valve 
(MFIV). This proposed amendment is being requested under exigent 
circumstances pursuant to NRC regulations.

DATES: Submit comments by September 9, 2026. Comments received after 
this date will be considered if it is practical to do so, but the 
Commission is able to ensure consideration only for comments received 
before this date. Requests for a hearing or petitions for leave to 
intervene must be filed by October 26, 2026.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-4192. Address 
questions about Docket IDs in Regulations.govto Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual(s) listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
     Mail comments to: Office of Nuclear Material Safety and 
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, ATTN: Guidance and Publications Branch.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Thomas Byrd, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-3719; email: [email protected]

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-4192 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-4192.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to [email protected]. The license amendment application Request 
Proposed One-Time Exigent Change to Technical Specification 3.7.1.7, 
``Main Feedwater System,'' is available in ADAMS under Accession No. 
ML26218A279.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2026-4192 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to Renewed Facility 
Operating License No. NPF-76, issued to STP Operating Company (STPNOC 
or the licensee); City Public Service Board of San Antonion; City of 
Austin, Texas; and Constellation South Texas, LLC, for operation of the 
South Texas Project,

[[Page 55126]]

Unit 1 (STP-1) located in Matagorda County, Texas.
    The proposed amendment would extend, for one time, the allowed 
outage time (AOT) for TS 3.7.1.7, ``Main Feedwater System,'' from 4 
hours to 24 hours to allow sufficient time for the repair of the system 
while the plant maintains operations.
    Pursuant to the requirements of sections 50.91 and 50.92 of title 
10 of the Code of Federal Regulations (10 CFR), the licensee requested 
approval of the amendment under exigent circumstances. In its 
application, the licensee stated that the degraded condition of the 
main feedwater isolation valve (MFIV) and the further degradation of 
the current repair could not reasonably be foreseen or anticipated. 
Therefore, STPNOC requested approval of this license amendment request 
at the earliest possible date because the conditions of the leak could 
degrade to the point where a Unit 1 shutdown would be required.
    Before any issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    Pursuant to 10 CFR 50.91(a)(6), for amendments to be granted under 
exigent circumstances, the NRC has made a proposed determination that 
the license amendment request involves no significant hazards 
consideration (NSHC). Under the NRC's regulations in 10 CFR 50.92, this 
means that operation of the facility in accordance with the proposed 
amendment would not (1) involve a significant increase in the 
probability or consequences of an accident previously evaluated; (2) 
create the possibility of a new or different kind of accident from any 
accident previously evaluated; or (3) involve a significant reduction 
in a margin of safety. As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of NSHC, which is presented below:
    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No. The proposed change extends the action completion 
time for Unit 1 Train D MFIV from 4 hours to 24 hours. Extending the 
completion time is not an accident initiator and thus does not change 
the probability that an accident will occur. However, it could 
potentially affect the consequences of an accident if an accident 
occurred during the extended unavailability of the inoperable MFIV. The 
increase in time that the MFIV is unavailable is small and the 
probability of an event occurring during this time period, which would 
require isolation of the main feedwater flow paths, is low.?>
    2. Does the proposed amendment create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No. The proposed change does not involve any physical 
alteration of plant equipment and does not change the method by which 
any safety-related structure, system, or component performs its 
function or is tested. Closure of the MFIVs is required to mitigate the 
consequences of the Main Steam Line Break and Main Feedwater Line Break 
accidents. Therefore, the proposed change does not involve a 
significant increase in the probability or consequences of an accident 
previously evaluated.
    3. Does the proposed amendment involve a significant reduction in a 
margin of safety?
    Response: No. The proposed change does not adversely affect 
existing plant safety margins or the reliability of the equipment 
assumed to operate in the safety analysis. There are no changes being 
made to safety analysis assumptions, safety limits or safety system 
settings that would adversely affect plant safety as a result of the 
proposed change.
    Therefore, the proposed change does not involve a significant 
reduction in a margin of safety.
    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves NSHC.
    In accordance with 10 CFR 50.91(a)(6), where the Commission finds 
that exigent circumstances exist, in that a licensee and the Commission 
must act quickly and that time does not permit the Commission to 
publish a Federal Register notice allowing 30 days for prior public 
comment, and it also determines that the amendment involves NSHCs, it 
can issue a Federal Register notice providing notice of an opportunity 
for hearing and allowing at least two weeks from the date of the notice 
for prior public comment. Therefore, in accordance with 10 CFR 
50.91(a)(6)(i)(A), the NRC staff is providing a 14-day notice period 
for public comment.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves NHSC. Any comments received 
within 14 days after the date of publication of this notice will be 
considered in making any final determination.
    Normally, the Commission will not issue the license amendment until 
the expiration of the 14-day notice period. However, if circumstances 
change during the notice period, such that failure to act in a timely 
way would result, for example, in derating or shutdown of the facility, 
the Commission may issue the license amendment before the expiration of 
the notice period, provided that its final determination is that the 
amendment involves NSHC. The final determination will consider all 
public and State comments received. If the Commission takes this 
action, it will publish in the Federal Register a notice of issuance. 
The Commission expects that the need to take this action will occur 
very infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult 10 CFR 
2.309. If a petition is filed, the presiding officer will rule on the 
petition and, if appropriate, a notice of a hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of NSHC, the Commission will make a final 
determination on the issue of NSHC, which will serve to establish when 
the hearing is held. If the final determination is that the license 
amendment request involves NSHC, the Commission may issue the amendment 
and make it immediately effective, notwithstanding the request for a 
hearing. Any hearing would take place after issuance of the amendment. 
If the final determination is that the license amendment request 
involves a

[[Page 55127]]

significant hazards consideration, then any hearing held would take 
place before the issuance of the amendment unless the Commission finds 
an imminent danger to the health or safety of the public, in which case 
it will issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or designated agency thereof, may participate as a non-
party under 10 CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and the NRC's public website 
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(https://www.nrc.gov/site-help/e-submittals.html).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate, which allows the participant (or their counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or their counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (https://www.nrc.gov/site-help/e-submittals.html), by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available on the 
NRC's public website (https://ehd.nrc.gov), unless otherwise excluded 
pursuant to an order of the presiding officer. If you do not have an 
NRC-issued digital ID certificate as previously described, click 
``cancel'' when the link requests certificates and you will be 
automatically directed to the NRC's electronic hearing docket where you 
will be able to access any publicly available documents in a particular 
hearing docket. Participants are requested not to include personal 
privacy information such as social security numbers, home addresses, or 
personal phone numbers in their filings, unless an NRC regulation or 
other law requires submission of such information. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants should not include copyrighted materials in 
their submission.
    For further details with respect to this action, see the 
application for license amendment dated August 6, 2026 (ADAMS Accession 
No. ML26218A279).
    Attorney for licensee: Rachel L. Jackson-Owens, VP, Chief Legal 
Officer, STP Nuclear Operating Company, P.O. Box 289, Wadsworth, TX 
77483.
    NRC Branch Chief: Hip[oacute]lito Gonz[aacute]lez.
    Authority: 42 U.S.C. 2011 et seq.

    Dated: August 24, 2026.
    For the Nuclear Regulatory Commission.
Thomas Byrd,
Project Manager, Operating Reactor Licensing Branch 4, Division of 
Licensing Project I, Office of Nuclear Reactor Regulation.
[FR Doc. 2026-17408 Filed 8-25-26; 8:45 am]
BILLING CODE 7590-01-P