[Federal Register Volume 91, Number 163 (Tuesday, August 25, 2026)]
[Notices]
[Pages 54909-54912]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-17290]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

[Docket No. FAA-2026-9736]


Siting New Spaceports and Use of Priority Airspace for Critical 
Space Launch Corridors

ACTION: Notice; Request for information (RFI).

-----------------------------------------------------------------------

SUMMARY: Under the leadership of President Trump and at the direction 
of Secretary Duffy and Administrator Bedford, the U.S. Department of 
Transportation (DOT) and the Federal Aviation Administration (FAA) are 
pursuing opportunities to ensure the United States global dominance in 
the commercial space transportation industry. The FAA is issuing this 
RFI to solicit public and industry input on two key transportation-
related elements of President Trump's recently published 2026 National 
Space Transportation Policy (NSTP): siting a new spaceport and the 
development and use of priority airspace for critical space launch 
corridors.

DATES: Written comments, including all supporting information and 
documents, are requested on or before October 26, 2026.

ADDRESSES: Interested persons are encouraged to submit responses to the 
questions posed in this RFI, along with supporting information, 
regarding the 2026 NSTP, to docket number FAA-2026-9736 using any of 
the following methods:
     Federal eRulemaking Portal: Go to http://www.regulations.gov and follow the online instructions for sending your 
comments electronically.
     Mail: Send comments to Docket Operations, M-30; U.S. 
Department of Transportation, 1200 New Jersey Avenue SE, Room W12-140, 
West Building Ground Floor, Washington, DC 20590-0001.
    Privacy: DOT posts any comments received without edit, including 
any personal information the commenter provides, to http://www.regulations.gov, as described in the system of records notice (DOT/
ALL-14 FDMS), which can be reviewed at http://www.dot.gov/privacy.
    Docket: Background documents or comments received may be read at 
http://www.regulations.gov at any time. Follow the online instructions 
for accessing the docket or go to the Docket Operations in Room W12-140 
of the West Building Ground Floor at 1200 New Jersey Avenue SE, 
Washington, DC 20590-0001, between 9 a.m. and 5 p.m., Monday through 
Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: James Hatt, Federal Aviation 
Administration, U.S. Department of Transportation, 1200 New Jersey Ave. 
SE, Washington, DC 20590. Telephone: (202) 267-4156. Email: 
[email protected].

SUPPLEMENTARY INFORMATION:

1. Purpose

    The purpose of this RFI is to solicit information to support the 
Department's analysis in expanding opportunities for commercial space 
transportation and support the 2026 NSTP objectives.
    In 2025, the United States was responsible for 217 of the 329 
launches worldwide. This rapid increase cemented the United States as 
the premier launch country. Looking forward, this ever-increasing 
launch rate is expected to reach 10,000 FAA-licensed launches and 
reentries a year by 2035, driving the cadence from a few launches a 
week to several launches and reentries a day. As of today, over half of 
U.S. launches originated from Cape Canaveral Space Force Station and 
Kennedy Space Center in Florida. Including Vandenberg Space Force Base 
in California, these three Federal sites account for 83 percent of U.S. 
launches.
    On December 18, 2025, President Trump signed Executive Order (E.O.) 
14369, Ensuring American Space Superiority, to emphasize the reach of 
human discovery, secure the Nation's

[[Page 54910]]

vital economic and security interests, unleash commercial development, 
and lay the foundation for a new space age.\1\ New and upgraded 
facilities, improved efficiency, and policy reforms will facilitate the 
security and defense of vital U.S. national and economic commercial 
space equities. In addition, President Trump's new 2026 NSTP directs 
the Secretary of Transportation to identify ``potential locations for 
additional launch facilities and targeted development or improvement of 
launch infrastructure.'' Consistent with the Administration's E.O. and 
the NSTP, the Department of Transportation (Department) is requesting 
input regarding potential locations for new spaceports. Such spaceports 
would ideally be viable locations to complement or augment many of the 
operations from Cape Canaveral Space Force Station, Kennedy Space 
Center, Vandenberg Space Force Base, and the National Aeronautics and 
Space Administration's (NASA) Wallops Flight Facility.
---------------------------------------------------------------------------

    \1\ 90 FR 60537.
---------------------------------------------------------------------------

    The 2026 NSTP also tasks the Department to ``designate priority 
airspace for critical space launch corridors.'' The Department seeks 
input from the space and aviation industries and other interested 
stakeholders. Specifically, the Department is interested in 
considerations for developing priority airspace for critical space 
launch corridors, the ideal requisites for priority airspace, and 
concepts for differentiating standard airspace used for commercial 
space activities from priority airspace.
    This RFI is an invitation to submit information in response to 
questions on the topics posed below in Section 4. Responses should be 
as detailed as possible to facilitate a comprehensive review.

2. Background

    The United States is the unquestioned leader in space launch and 
reentry. Robust and varied commercial, civil, and national security 
space launch activities form the backbone of U.S. space-based power. 
Cape Canaveral Space Force Station, Kennedy Space Center, and 
Vandenberg Space Force Base provide unprecedented access to space. 
Federal ranges are strained to support both governmental and commercial 
space launches, however. Even with enhanced efficiency at Federal 
launch and reentry sites, the United States may find availability of 
launch and reentry sites becoming a bottleneck to achieving the goals 
of E.O. 14369 and the 2026 NSTP. While enhanced efficiency at Federal 
launch sites will support the short-term increase in launch cadence and 
demand, with surges in military, commercial, and civil space 
activities, the United States must prepare for the rapid expansion of 
launch cadence by supporting increased spaceport capacity, additional 
launch sites, and support infrastructure to ensure continuous dominance 
in commercial space.
    The fundamental requirements that drove site selection for the 
Eastern and Western Test Ranges in the 1950s remain unchanged. 
Geography allowing launch and reentry over open water, available 
infrastructure to support launch logistics (e.g., roads and utilities), 
and accessibility to space with minimal overflight of foreign countries 
were, and remain, key metrics to spaceport success. In addition to the 
Federal launch and reentry ranges, NASA's Wallops Flight Facility adds 
capacity to U.S. space launch. However, although Wallops shares many of 
the attributes of the major Federal ranges, certain characteristics, 
including tight physical constraints and only four launch pads with no 
option for heavy spacelift, limit Wallops' ability to support future 
space technology or to accommodate the expected increase in orbital 
launch cadence.
    The Department oversees FAA-licensed commercial spaceports and 
private single-use launch sites. A viable spaceport involves several 
tradeoffs. The Office of Commercial Space Transportation developed a 
brief Spaceport Licensing Primer: An Introduction to the Spaceport 
Licensing Process \2\ to provide information for individuals not 
familiar with the development of commercial spaceports. The 2026 NSTP 
recognizes, as a national space transportation goal, that ``by 2030, 
our space transportation ranges must grow to support more than 1,000 
launches and reentries every year.'' To ensure the United States 
reaches this goal, it must add and modernize launch and reentry 
infrastructure.
---------------------------------------------------------------------------

    \2\ https://www.faa.gov/space/office_spaceports/Spaceport-Licensing-Primer.pdf.
---------------------------------------------------------------------------

    A critical aspect of spaceport development will be funding. 
Secretary Duffy recently established the National Infrastructure 
Development Office (NIDO) in the Department to expand and encourage use 
of public-private partnerships in infrastructure development. Public-
private partnerships could be a valuable and innovative tool for 
structuring spaceport development in particular. This RFI solicits 
information on funding mechanisms and the potential utility of public-
private partnerships in spaceport development.
    In addition, the 2026 NSTP directs the Department to ``designate 
priority airspace for critical space launch corridors.'' Currently, 
U.S. launch operators work with the FAA Air Traffic Organization to 
establish Aircraft Hazard Areas (AHAs) for space launches to protect 
aircraft from space objects and falling debris. Because the same 
spaceports support the majority of U.S. space launches, the same or 
similar AHAs for safety are repeatedly used. FAA does not currently use 
the term `space launch corridor.' The questions below are intended to 
explore the relationship and assumptions related to the current AHAs 
and the new critical space launch corridor concept. The concept of 
airspace corridors, in general, is not new, and airspace corridors for 
aviation users may vary in definition and use from space launch 
corridors. For example, airspace corridors for aviation activities may 
look and operate differently from a potential space launch corridor, as 
the foundations for space launch safety account for collision and 
debris. In contrast, most aviation activities need only account for 
collision. From a space operator's perspective, request time and 
availability are important factors enabling rapid launch cadence. From 
an aviation perspective, advance notification of time, size, and 
duration of AHAs are integral to maintaining both aviation safety and 
airspace efficiency.

3. Nature of Information Request

    The Department may use information obtained through this request to 
assist in, inform, and research potential locations for viable 
spaceport sites. The Department will also accept ideas for increasing 
launch cadence at existing U.S. commercial spaceport sites.
    The Department requests that information be provided in a written 
statement. The Department may request additional information or 
presentations from responders depending upon the details of the 
responder's submission. Given the short timeframe for the Department's 
identification and characterization of potential sites, responders 
should assume that their written response is the best opportunity to 
provide input and not hold out for an in-person meeting with the 
Department.

[[Page 54911]]

4. Submittal Requests for RFI 3
---------------------------------------------------------------------------

    \3\ This is not a Screening Information Request or Request for 
Offers. The Department is not seeking or accepting unsolicited 
proposals related to this activity. The Department will not pay for 
any information received or costs incurred in preparing a response 
to this request. Any costs associated with a submittal are solely at 
the interested vendor's expense. The Department reserves the right 
to communicate with any, some, or none of the respondents. Any 
submissions will remain with the Department for its use and will not 
be returned to the respondents.
---------------------------------------------------------------------------

    Interested members of the public, including aerospace industry 
stakeholders, are requested to submit information on the following:
    Responder Information. Submit, as applicable:
     Name, address, and affiliation (company if appropriate);
     URL of company website (if applicable); and
     Point of contact, including telephone number and email 
address.
    RFI Questions. Any interested member of the public, including any 
aerospace industry stakeholder, is invited to provide information 
responsive to the questions below. Responses will enable the Department 
to evaluate the best locations for new U.S. spaceports and assist the 
Department in establishing priority airspace for critical space launch 
corridors.
    1. (Spaceport Location criteria) What strategic criteria should the 
Department use in evaluating new spaceport siting considerations?
     What geographic aspects matter most: proximity to the 
equator for prograde space launches, proximity to or separation from 
densely populated regions, or other factors?
     What logistical considerations should be evaluated, 
including ease of development and access, as well as impediments to be 
avoided?
     What unique considerations would there be with an island 
spaceport versus a site on the continental United States?
     What international equities should be considered with 
siting (e.g., early overflight of foreign territory)?
     What should the primary safety considerations be for 
siting of any new spaceport, given the current public safety criteria 
of 1 x 10-4 casualties per operation?
    2. (Existing Commercial Spaceports) Why are existing commercial 
spaceports underutilized?
     What Federal actions could be taken to increase orbital 
launches from existing commercial spaceports?
     Why haven't these underutilized spaceports developed into 
operational spaceports? Can the development of existing commercial 
spaceports be renewed?
    3. (Previously Proposed Spaceports) Noting that the Department has 
not been involved in selecting or developing new spaceports in the 
past, several spaceport options have been previously considered. The 
Department would like input on these potential locations.
     Spaceport Shiloh, Florida. Space Florida proposed the 
construction and operation of the Shiloh Launch Complex on 
approximately 150 acres of undeveloped Federal land.
     Camden Spaceport, Georgia. Initially, a site considered by 
NASA for the Apollo program, planning progressed on Camden Spaceport 
until local stakeholders pushed back in 2022, ending site development. 
The County's current site license runs through December 2026.
     Puerto Rico Spaceport. Initially conceptualized in the 
2012-2016 timeframe. Spaceport Puerto Rico was considered for light and 
medium launch vehicles.
     Space launch rigs. Space launch from converted oil rigs or 
custom-developed launch platforms.
    4. (New Spaceport Location) The Department would like input on 
potential new locations and other options not identified specifically 
in this RFI.
     Where might a new U.S. vertical spaceport site be 
developed? Considering the factors identified in the Spaceport 
Licensing Primer and FAA regulations on launch sites in Title 14 of the 
Code of Federal Regulations part 420, what changes might the Department 
make to encourage, facilitate, and promote development of a new 
spaceport site?
     Referring to the Spaceport Licensing Primer, what can the 
Department do to address the four challenging areas in spaceport 
development: (1) stakeholder engagement, (2) co-location with an 
airport, (3) environmental issues, and (4) airspace integration?
     Are there locations where the necessary infrastructure 
already exists for establishing a spaceport? For example, transport 
links such as wide-load highways or deep-water ports.
     What are the primary costs associated with developing a 
new spaceport?
     What strategies and technologies could be utilized to 
expedite construction?
     What are the supply chain constraints for construction, 
and how could they be addressed?
     What energy constraints exist, and how could they be 
addressed?
     What funding constraints exist, and how could they be 
addressed, to include alternative financing structures? How could 
public-private partnerships best be leveraged to finance spaceport 
development?
    5. (Critical Space Launch Corridors) As the Department develops 
critical space launch corridors, what expectations do the space and 
aviation industries have regarding prioritization?
     How can the implementation of space launch corridors limit 
adverse impacts to airspace efficiency and the continued growth of the 
air transportation industry?
     What benefits to either or both industries would be 
granted when utilizing critical space launch corridors?
     What adjustments to operational and coordination timelines 
might be made when utilizing critical space launch corridors?
     Assuming standard existing procedures apply for activities 
that do not use critical space launch corridors, what activities would 
qualify for activation of the critical space launch corridors?
     How would the payload characterization (commercial, civil, 
or national security) impact the development or use of critical space 
launch corridors?
     What spaceports would most benefit from critical space 
launch corridors: all spaceports, major use spaceports, or only Federal 
spaceports?
     What governance structures would enhance the use of 
critical launch corridors, to include fees, operational restrictions, 
or other oversight methodologies?
     What limitations or emergency measures would need to be 
established to ensure public safety during commercial space activities 
and continued aviation safety for the flying public?
     What environmental concerns should be considered in 
determining where to locate, and when to activate, critical space 
launch corridors?
     How would the identification of a corridor as a ``critical 
space launch corridor,'' which is not a current term in AHAs, increase 
awareness, streamline timing requirements, and enable greater launch 
cadence?
    6. What questions are we not asking that are relevant to this 
effort? Please identify those questions and provide responses.

5. Timeline and Delivery of Submittal

    See also the DATES section of this notice. Written comments, 
including all supporting information and documents, are requested on or 
before October 26, 2026.

[[Page 54912]]

    Submittals: Interested parties must respond in writing. Responses 
to the RFI questions should be concise and reasonable in length.
    The Department may request clarification of responses directly 
related to this RFI through direct contact with respondents. 
Respondents must identify and clearly mark any proprietary information 
contained in their submissions and must be prepared to provide 
justification for confidential treatment to the Department of such 
designations if requested. This proprietary information will be treated 
confidentially by the Department; however, nothing alters the 
Department's obligations under existing law, including any duties owed 
by the Department under the Freedom of Information Act. The Department 
may need the Respondent's justification of the proprietary designation 
to support withholding the documents or information from public 
disclosure upon request.

    Issued in Washington, DC.
Sean P. Duffy,
Secretary of Transportation.
[FR Doc. 2026-17290 Filed 8-24-26; 8:45 am]
BILLING CODE 4910-13-P