[Federal Register Volume 91, Number 158 (Tuesday, August 18, 2026)]
[Notices]
[Pages 53427-53434]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-16798]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2026-3994]


Biweekly Notice; Applications and Amendments to Facility 
Operating Licenses and Combined Licenses Involving No Significant 
Hazards Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Biweekly notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, 
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is 
publishing this regular biweekly notice. The Act requires the 
Commission to publish notice of any amendments issued, or proposed to 
be issued, and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration (NSHC), 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person.

DATES: Comments must be filed by September 17, 2026. A request for a 
hearing or petitions for leave to intervene must be filed by October 
19, 2026. This biweekly notice includes all amendments issued, or 
proposed to be issued, from July 21, 2026, to August 3, 2026. The last 
biweekly notice was published on August 4, 2026.

ADDRESSES: You may submit comments by any of the following; however, 
the NRC encourages electronic comment submission through the Federal 
rulemaking website.
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3994. Address 
questions about Docket IDs in Regulations.gov to Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual(s) listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
     Mail comments to: Office of Nuclear Material Safety and 
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, ATTN: Guidance and Publications Branch.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Karen Zeleznock, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1118; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-3994, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3994.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to [email protected]. The ADAMS accession number for each document 
referenced (if it is available in ADAMS) is provided the first time 
that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2026-3994, facility name, unit number(s), docket

[[Page 53428]]

number(s), application date, and subject, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses and Proposed No Significant 
Hazards Consideration Determination

    For the facility-specific amendment requests shown in this notice, 
the Commission finds that the licensees' analyses provided, consistent 
with section 50.91 of title 10 of the Code of Federal Regulations (10 
CFR) ``Notice for public comment; State consultation,'' are sufficient 
to support the proposed determinations that these amendment requests 
involve NSHC. Under the Commission's regulations in 10 CFR 50.92, 
operation of the facilities in accordance with the proposed amendments 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of the 30-day comment period 
if circumstances change during the 30-day comment period such that 
failure to act in a timely way would result, for example in derating or 
shutdown of the facility. If the Commission takes action on any of 
these amendments prior to the expiration of either the comment period 
or the notice period, it will publish in the Federal Register a notice 
of issuance. If the Commission makes a final NSHC determination for any 
of these amendments, any hearing will take place after issuance. The 
Commission expects that the need to take action on any amendment before 
60 days have elapsed will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult 10 
CFR 2.309. If a petition is filed, the Commission or a presiding 
officer will rule on the petition and, if appropriate, a notice of a 
hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the license 
amendment request involves no significant hazards consideration, the 
Commission may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
license amendment request involves a significant hazards consideration, 
then any hearing held would take place before the issuance of the 
amendment unless the Commission finds an imminent danger to the health 
or safety of the public, in which case it will issue an appropriate 
order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or designated agency thereof, may participate as a non-
party under 10 CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and the NRC's public website 
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(https://www.nrc.gov/site-help/e-submittals.html).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate, which allows the participant (or their counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other

[[Page 53429]]

adjudicatory document (even in instances in which the participant, or 
their counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the proceeding if the Secretary has not 
already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (https://www.nrc.gov/site-help/e-submittals.html), by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available on the 
NRC's public website (https://ehd.nrc.gov), unless otherwise excluded 
pursuant to an order of the presiding officer. If you do not have an 
NRC-issued digital ID certificate as previously described, click 
``cancel'' when the link requests certificates and you will be 
automatically directed to the NRC's electronic hearing docket where you 
will be able to access any publicly available documents in a particular 
hearing docket. Participants are requested not to include personal 
privacy information such as social security numbers, home addresses, or 
personal phone numbers in their filings, unless an NRC regulation or 
other law requires submission of such information. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants should not include copyrighted materials in 
their submission.
    The following table provides the plant name, docket number, date of 
application, ADAMS accession number, and location in the application of 
the licensees' proposed NSHC determinations. For further details with 
respect to these license amendment applications, see the applications 
for amendment, which are available for public inspection in ADAMS. For 
additional direction on accessing information related to this document, 
see the ``Obtaining Information and Submitting Comments'' section of 
this document.

                       License Amendment Requests
------------------------------------------------------------------------
 
------------------------------------------------------------------------
Constellation Energy Generation, LLC; Clinton Power Station, Unit No. 1;
DeWitt County, IL; Constellation Energy Generation, LLC; Dresden Nuclear
  Power Station, Units 2 and 3; Grundy County, IL; Constellation Energy
 Generation, LLC; LaSalle County Station, Units 1 and 2; LaSalle County,
   IL; Constellation Energy Generation, LLC; Peach Bottom Atomic Power
      Station, Units 2 and 3; York County, PA; Constellation Energy
 Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock
   Island County, IL; Constellation FitzPatrick, LLC and Constellation
Energy Generation, LLC; James A. FitzPatrick Nuclear Power Plant; Oswego
                               County, NY
------------------------------------------------------------------------
Docket Nos.............................  50-461, 50-237, 50-249, 50-333,
                                          50-373, 50-374, 50-277, 50-
                                          278, 50-254, 50-265.
Application date.......................  July 22, 2026.
ADAMS Accession No.....................  ML26203A078.
Location in Application of NSHC........  Pages 4-6 of Attachment 1.
Brief Description of Amendments........  The proposed license amendments
                                          would adopt Technical
                                          Specification Task Force
                                          (TSTF) Traveler 584 (TSTF-
                                          584), Revision 0, ``Eliminate
                                          Automatic RWCU [Reactor Water
                                          Cleanup] System Isolation on
                                          SLC [Standby Liquid Control]
                                          Initiation.'' TSTF-584 would
                                          revise Limiting Condition for
                                          Operation 3.3.6.1 to remove
                                          the requirement that the RWCU
                                          System automatically isolates
                                          on manual initiation of the
                                          SLC System.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jason Zorn, Associate General
 Address.                                 Counsel, Constellation Energy
                                          Generation, LLC, 101
                                          Constitution Ave NW, Suite 400
                                          East, Washington, DC 20001.
NRC Project Manager, Telephone Number..  Robert Kuntz, 301-415-3733.
------------------------------------------------------------------------

[[Page 53430]]

 
  Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant,
                Units 1 and 2; San Luis Obispo County, CA
------------------------------------------------------------------------
Docket Nos.............................  50-275, 50-323.
Application date.......................  April 29, 2026, as supplemented
                                          by letter dated June 15, 2026.
ADAMS Accession No.....................  ML26120A108, ML26166A264.
Location in Application of NSHC........  Pages 40-41 of Enclosure 1.
Brief Description of Amendments........  The proposed amendments would
                                          revise the Emergency Plan to
                                          reflect the updates contained
                                          in NUREG-0654/FEMA-REP-1,
                                          Revision 2, ``Criteria for
                                          Preparation and Evaluation of
                                          Radiological Emergency
                                          Response Plans and
                                          Preparedness in Support of
                                          Nuclear Power Plants,'' dated
                                          December 2019 (ML19347D139).
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jennifer Post, Esq., Pacific
 Address.                                 Gas and Electric Co., 300
                                          Lakeside Drive, Oakland, CA
                                          94612.
NRC Project Manager, Telephone Number..  Samson Lee, 301-415-3168.
------------------------------------------------------------------------
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos.............................  52-025, 52-026.
Application date.......................  July 10, 2026.
ADAMS Accession No.....................  ML26191A286.
Location in Application of NSHC........  Pages E-8 through E-10 of the
                                          Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          revise the technical
                                          specifications (TSs) to adopt
                                          changes to the applicability
                                          requirements for the TS 3.7.6,
                                          ``Main Control Room Emergency
                                          Habitability System (VES),''
                                          including the TS requirements
                                          for the supporting
                                          instrumentation and power for
                                          the VES.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Millicent Ronnlund, Vice
 Address.                                 President and General Counsel,
                                          Southern Nuclear Operating
                                          Co., Inc., P.O. Box 1295,
                                          Birmingham, AL 35201-1295.
NRC Project Manager, Telephone Number..  John Lamb, 301-415-3100.
------------------------------------------------------------------------
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos.............................  52-025, 52-026.
Application date.......................  June 25, 2026.
ADAMS Accession No.....................  ML26176A344.
Location in Application of NSHC........  Pages E-4 through E-5 of the
                                          Enclosure.
Brief Description of Amendment.........  The proposed amendments would
                                          update the Vogtle Electric
                                          Generating Plant, Units 3 and
                                          4, Combined License and
                                          Technical Specifications (TSs)
                                          by revising the Ventilation
                                          Filter Testing Program test
                                          flow rate for pressure drop
                                          across the combined high
                                          efficiency particulate air
                                          (HEPA) filter, charcoal
                                          adsorber, and post[dash]filter
                                          described in TS 5.5.13,
                                          ``Ventilation Filter Testing
                                          Program (VFTP).''
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Millicent Ronnlund, Vice
 Address.                                 President and General Counsel,
                                          Southern Nuclear Operating
                                          Co., Inc., P.O. Box 1295,
                                          Birmingham, AL 35201-1295.
NRC Project Manager, Telephone Number..  Zachary Turner, 415-6303.
------------------------------------------------------------------------
   Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
  Susquehanna Steam Electric Station, Units 1 and 2; Luzerne County, PA
------------------------------------------------------------------------
Docket Nos.............................  50-387, 50-388.
Application date.......................  July 28, 2026.
ADAMS Accession No.....................  ML26209A374.
Location in Application of NSHC........  Pages 2-5 of the Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          modify the Susquehanna Steam
                                          Electric Station, Units 1 and
                                          2, technical specifications
                                          (TSs) to adopt Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-585,
                                          ``Revise [Limiting Condition
                                          for Operation] LCO 3.0.3 to
                                          Require Managing Risk,'' and
                                          TSTF-597, ``Eliminate LCO
                                          3.0.3 Mode 2 Requirement.''
                                          The amendments would revise
                                          the requirements and actions
                                          associated with LCO 3.0.3 to
                                          require a risk assessment and
                                          risk management actions when
                                          LCO 3.0.3 is entered and
                                          eliminate the requirement to
                                          enter Mode 2 within a
                                          specified time. The amendments
                                          would also update certain
                                          required actions to direct a
                                          plant shutdown instead of
                                          entry into LCO 3.0.3 and make
                                          corresponding changes to
                                          related TSs.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jason Usher, 600 Hamilton
 Address.                                 Street, Suite 600, Allentown,
                                          PA 18101.
NRC Project Manager, Telephone Number..  Tony Sierra, 301-287-9531.
------------------------------------------------------------------------

[[Page 53431]]

 
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
                         3; Limestone County, AL
------------------------------------------------------------------------
Docket Nos.............................  50-259, 50-260, 50-296.
Application date.......................  July 1, 2026.
ADAMS Accession No.....................  ML26182A276.
Location in Application of NSHC........  Pages E2 through E4 of the
                                          Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          revise Surveillance
                                          Requirement (SR) 3.3.1.1.2 of
                                          Technical Specification (TS)
                                          3.3.1.1, ``Reactor Protection
                                          System (RPS)
                                          Instrumentation,'' to verify
                                          that calculated power is no
                                          more than two percent greater
                                          than the average power range
                                          monitor (APRM) channel output.
                                          The request is based on
                                          Technical Specifications Task
                                          Force (TSTF) Traveler TSTF-
                                          546, ``Revise APRM Channel
                                          Adjustment Surveillance
                                          Requirement.''
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Edward C. Meade, (Interim)
 Address.                                 Executive VP and General
                                          Counsel, Tennessee Valley
                                          Authority, 400 West Summit
                                          Hill Drive, WT 6A, Knoxville,
                                          TN 37902.
NRC Project Manager, Telephone Number..  Michael Mahoney, 301-415-3867.
------------------------------------------------------------------------

III. Notice of Issuance of Amendments to Facility Operating Licenses 
and Combined Licenses

    During the period since publication of the last biweekly notice, 
the Commission has issued the following amendments. The Commission has 
determined for each of these amendments that the application complies 
with the standards and requirements of the Atomic Energy Act of 1954, 
as amended (the Act), and the Commission's rules and regulations. The 
Commission has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed NSHC 
determination, and opportunity for a hearing in connection with these 
actions, were published in the Federal Register as indicated in the 
safety evaluation for each amendment.
    Unless otherwise indicated, the Commission has determined that 
these amendments satisfy the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for these amendments. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.22(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to each action, see the amendment 
and associated documents such as the Commission's letter and safety 
evaluation, which may be obtained using the ADAMS accession numbers 
indicated in the following table. The safety evaluation will provide 
the ADAMS accession numbers for the application for amendment and the 
Federal Register citation for any environmental assessment. All of 
these items can be accessed as described in the ``Obtaining Information 
and Submitting Comments'' section of this document.

                       License Amendment Issuances
------------------------------------------------------------------------
 
------------------------------------------------------------------------
 Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2;
  Will County, IL; Constellation Energy Generation, LLC; Byron Station,
  Unit Nos. 1 and 2; Will County, IL; Constellation Energy Generation,
 LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; and Independent
   Spent Fuel Storage Installation; Calvert County, MD; Constellation
    Energy Generation, LLC; Clinton Power Station, Unit No. 1; DeWitt
 County, IL; Constellation Energy Generation, LLC; Dresden Nuclear Power
     Station, Units 2 and 3; Grundy County, IL; Constellation Energy
 Generation, LLC; LaSalle County Station, Units 1 and 2; LaSalle County,
   IL; Constellation Energy Generation, LLC; Peach Bottom Atomic Power
      Station, Units 2 and 3; York County, PA; Constellation Energy
 Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock
  Island County, IL; Constellation Energy Generation, LLC; R. E. Ginna
 Nuclear Power Plant; Wayne County, New York; Constellation FitzPatrick,
   LLC and Constellation Energy Generation, LLC; James A. FitzPatrick
Nuclear Power Plant; Oswego County, NY; Nine Mile Point Nuclear Station,
  LLC and Constellation Energy Generation, LLC; Nine Mile Point Nuclear
                   Station, Unit 2; Oswego County, NY
------------------------------------------------------------------------
Docket Nos.............................  50-456, 50-457, 50-454, 50-455,
                                          50-317, 50-318, 50-461, 50-
                                          237, 50-249, 50-333, 50-373,
                                          50-374, 50-410, 50-277, 50-
                                          278, 50-254, 50-265, 50-244.
Amendment Date.........................  July 20, 2026.
ADAMS Accession No.....................  ML26182A050.
Amendment Nos..........................  Braidwood--250 (Unit 1) and 249
                                          (Unit 2); Byron--246 (Unit1)
                                          and 246 (Unit 2); Calvert
                                          Cliffs--355 (Unit 1) and 334
                                          (Unit 2); Clinton--260 (Unit
                                          1); Dresden--290 (Unit 2) and
                                          283 (Unit 3); FitzPatrick--364
                                          (Unit 1); LaSalle--270 (Unit
                                          1) and 254 (Unit 2); Nine Mile
                                          Point--204 (Unit 2); Peach
                                          Bottom--348 (Unit 2) and 351
                                          (Unit 3); Quad Cities--306
                                          (Unit 1) and 302 Unit 2); R.
                                          E. Ginna--162 (Unit 1).
Brief Description of Amendments........  The amendments adopted
                                          Technical Specification Task
                                          Force (TSTF) Traveler TSTF-
                                          585, ``Revise LCO [Limiting
                                          Condition for Operation] 3.0.3
                                          to Require Managing Risk.''
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------

[[Page 53432]]

 
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1
    and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee
   Nuclear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy
     Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2;
Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear
           Power Plant, Unit 1; Wake and Chatham Counties, NC
------------------------------------------------------------------------
Docket Nos.............................  50-413, 50-414, 50-369, 50-370,
                                          50-269, 50-270, 50-287, 50-
                                          400, 50-261.
Amendment Date.........................  July 23, 2026.
ADAMS Accession No.....................  ML26189A347.
Amendment Nos..........................  Catawba--327 (Unit 1) and 323
                                          (Unit 2); Shearon Harris--204
                                          (Unit 1); McGuire--335 (Unit
                                          1) and 314 (Unit 2); Oconee--
                                          435 (Unit 1) and 437 (Unit 2)
                                          and 436 (Unit 3); Robinson--
                                          283 (Unit 2).
Brief Description of Amendments........  The amendments revised the
                                          Technical Specifications (TSs)
                                          for Catawba Nuclear Station,
                                          Units 1 and 2; McGuire Nuclear
                                          Station, Units 1 and 2; Oconee
                                          Nuclear Station, Units 1, 2,
                                          and 3; Shearon Harris Nuclear
                                          Power Plant, Unit 1; and H.B.
                                          Robinson Steam Electric Plant,
                                          Unit 2. The amendments revised
                                          Limiting Condition for
                                          Operation (LCO) 3.0.3 to
                                          require a risk assessment and
                                          implementation of appropriate
                                          risk management actions when
                                          LCO 3.0.3 is entered and
                                          revised or added certain
                                          required actions in plant-
                                          specific TSs to direct a plant
                                          shutdown instead of defaulting
                                          to LCO 3.0.3. Specifically,
                                          the amendments affected TSs
                                          related to main steam
                                          isolation valves, direct
                                          current sources, onsite power
                                          distribution, pressurizer code
                                          safety valves, and LCO
                                          Applicability requirements, as
                                          well as associated
                                          surveillance requirements and
                                          actions for inoperable
                                          components.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
 Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and
                         2; Brunswick County, NC
------------------------------------------------------------------------
Docket Nos.............................  50-325, 50-324.
Amendment Date.........................  July 20, 2026.
ADAMS Accession No.....................  ML26190A206.
Amendment Nos..........................  315 (Unit 1) and 343 (Unit 2).
Brief Description of Amendments........  The license amendments revised
                                          the technical specifications
                                          (TSs) for Brunswick Steam
                                          Electric Plant, Units 1 and 2.
                                          The amendments modified
                                          Limiting Condition for
                                          Operation (LCO) 3.0.3, ``LCO
                                          Applicability,'' to require a
                                          risk assessment and
                                          implementation of risk
                                          management actions when LCO
                                          3.0.3 is entered, consistent
                                          with the changes described in
                                          TS Task Force (TSTF) Traveler
                                          TSTF-585, Revision 5, and
                                          eliminated the requirement to
                                          enter Mode 2 within a
                                          specified time as described in
                                          TSTF-597, Revision 0. The
                                          amendments also revised or
                                          added Required Actions in TS
                                          3.8.7, ``Distribution Systems--
                                          Operating,'' and TS 3.8.4,
                                          ``DC Sources--Operating,'' to
                                          direct a plant shutdown
                                          instead of entry into LCO
                                          3.0.3 and included associated
                                          editorial and administrative
                                          changes throughout the
                                          affected specifications.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
    Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No..............................  50-397.
Amendment Date.........................  July 28, 2026.
ADAMS Accession No.....................  ML26154A182.
Amendment No...........................  282.
Brief Description of Amendment.........  The amendment adopted Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-585,
                                          ``Revise LCO [Limiting
                                          Condition for Operation] 3.0.3
                                          to Require Managing Risk'' and
                                          TSTF-597, ``Eliminate LCO
                                          3.0.3 Mode 2 Requirement.''
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
    Entergy Louisiana, LLC, and Entergy Operations, Inc.; River Bend
  Station, Unit 1; West Feliciana Parish, LA; Entergy Operations, Inc.,
    System Energy Resources, Inc., Cooperative Energy, A Mississippi
 Electric Cooperative, and Entergy Mississippi, LLC; Grand Gulf Nuclear
                  Station, Unit 1; Claiborne County, MS
------------------------------------------------------------------------
Docket Nos.............................  50-416, 50-458.
Amendment Date.........................  July 23, 2026.
ADAMS Accession No.....................  ML26152A154.
Amendment Nos..........................  Grand Gulf--242 (Unit 1); River
                                          Bend--222 (Unit 1).
Brief Description of Amendments........  The amendments adopted
                                          Technical Specifications Task
                                          Force (TSTF) Traveler TSTF-
                                          585, ``Revise LCO [Limiting
                                          Condition for Operation] 3.0.3
                                          to Require Managing Risk'' and
                                          TSTF-597, ``Eliminate LCO
                                          3.0.3 Mode 2 Requirement.''

[[Page 53433]]

 
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
   Entergy Operations, Inc.; Arkansas Nuclear One, Units 1 and 2; Pope
 County, AR; Entergy Operations, Inc.; Waterford Steam Electric Station,
                     Unit 3; St. Charles Parish, LA
------------------------------------------------------------------------
Docket Nos.............................  50-313, 50-368, 50-382.
Amendment Date.........................  July 28, 2026.
ADAMS Accession No.....................  ML26188A065.
Amendment Nos..........................  Arkansas Nuclear One--287 (Unit
                                          1) and 341 (Unit 2); Waterford
                                          Steam Electric Station--280
                                          (Unit 3).
Brief Description of Amendments........  The amendments adopted
                                          Technical Specifications Task
                                          Force (TSTF) Traveler TSTF-
                                          585, ``Revise LCO [Limiting
                                          Condition for Operation] 3.0.3
                                          to Require Managing Risk.''
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
     Holtec Decommissioning International, LLC; Oyster Creek Nuclear
                  Generating Station; Forked River, NJ
------------------------------------------------------------------------
Docket No..............................  50-219.
Amendment Date.........................  July 30, 2026.
ADAMS Accession No.....................  ML26176A056 (Package).
Amendment No...........................  302.
Brief Description of Amendment.........  The amendment approved the
                                          Oyster Creek Nuclear
                                          Generating Station (OCNGS)
                                          License Termination Plan (LTP)
                                          and adds License Condition
                                          2.C.(18) to include the LTP
                                          requirements and establish
                                          criteria for determining when
                                          changes to the LTP require
                                          prior NRC approval before
                                          implementation. The OCNGS LTP
                                          provides the details of the
                                          licensee's plan for
                                          characterizing, identifying,
                                          and remediating the remaining
                                          residual radioactivity at the
                                          OCNGS site to a level that
                                          will allow the site to be
                                          released for unrestricted use.
                                          The OCNGS LTP also describes
                                          how the licensee will confirm
                                          the extent and success of
                                          remediation through
                                          radiological surveys, provide
                                          financial assurance to
                                          complete decommissioning, and
                                          ensure that the environmental
                                          impacts of decommissioning
                                          activities are within the
                                          scope originally envisioned in
                                          documented environmental
                                          evaluations for the site.
Public Comments Received as to Proposed  Yes.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant,
                Units 1 and 2; San Luis Obispo County, CA
------------------------------------------------------------------------
Docket Nos.............................  50-275, 50-323.
Amendment Date.........................  July 23, 2026.
ADAMS Accession No.....................  ML26133A336.
Amendment Nos..........................  259 (Unit 1) and 261 (Unit 2).
Brief Description of Amendments........  The amendments revised the
                                          technical specifications (TSs)
                                          to adopt Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-529,
                                          Revision 4, ``Clarify Use and
                                          Application Rules,'' by
                                          modifying TS requirements in
                                          Section 1.3 and Section 3.0
                                          regarding limiting condition
                                          for operation and surveillance
                                          requirement usage. These
                                          changes are consistent with
                                          NRC-approved TSTF-529,
                                          Revision 4.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant,
                Units 1 and 2; San Luis Obispo County, CA
------------------------------------------------------------------------
Docket Nos.............................  50-275, 50-323.
Amendment Date.........................  July 28, 2026.
ADAMS Accession No.....................  ML26183A083.
Amendment Nos..........................  260 (Unit 1) and 262 (Unit 2).
Brief Description of Amendments........  The amendments revised
                                          technical specifications (TSs)
                                          to adopt Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-596,
                                          ``Expand the Applicability of
                                          the Surveillance Frequency
                                          Control Program (SFCP),''
                                          which is an approved change to
                                          the standard technical
                                          specifications. TSTF-596
                                          expands the applicability of
                                          the SFCP to include other
                                          periodic testing frequencies
                                          in TSs.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
   Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear
  Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating
  Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke
  County, GA; Southern Nuclear Operating Company, Inc.; Vogtle Electric
            Generating Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos.............................  50-348, 50-364, 50-424, 50-425,
                                          52-025, 52-026.
Amendment Date.........................  August 3, 2026.
ADAMS Accession No.....................  ML26197A100.
Amendment Nos..........................  Farley--260 (Unit 1) and 257
                                          (Unit 2); Vogtle--231 (Unit
                                          1), 213 (Unit 2), 217 (Unit
                                          3), and 214 (Unit 4).

[[Page 53434]]

 
Brief Description of Amendments........  The amendments adopted
                                          Technical Specification Task
                                          Force (TSTF) Traveler TSTF-
                                          585, ``Revise LCO [Limiting
                                          Condition for Operation] 3.0.3
                                          to Require Managing Risk.''
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
   Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
  Susquehanna Steam Electric Station, Units 1 and 2; Luzerne County, PA
------------------------------------------------------------------------
Docket Nos.............................  50-387, 50-388.
Amendment Date.........................  July 30, 2026.
ADAMS Accession No.....................  ML26195A262.
Amendment Nos..........................  293 (Unit 1) and 277 (Unit 2).
Brief Description of Amendments........  The license amendments revised
                                          the Susquehanna Steam Electric
                                          Station, Units 1 and 2,
                                          Technical Specification (TS)
                                          3.1.7, ``Standby Liquid
                                          Control (SLC) System.''
                                          Specifically, the amendments
                                          modified TS Figure 3.1.7-1,
                                          ``Sodium Pentaborate Solution
                                          Volume Versus Concentration
                                          Requirements,'' by increasing
                                          the minimum required boron
                                          solution storage tank volumes
                                          at specified sodium
                                          pentaborate concentrations.
                                          The amendments also updated
                                          the TS Bases for 3.1.7 to
                                          reflect an increased minimum
                                          post-injection boron
                                          concentration of 850 parts per
                                          million (ppm) equivalent of
                                          natural boron in the reactor
                                          coolant and revised the
                                          associated minimum tank
                                          volumes accordingly.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
   Vistra Operations Company LLC; Beaver Valley Power Station, Unit 1;
                            Beaver County, PA
------------------------------------------------------------------------
Docket No..............................  50-334.
Amendment Date.........................  July 22, 2026.
ADAMS Accession No.....................  ML26175A273.
Amendment No...........................  330.
Brief Description of Amendment.........  The amendment revised the
                                          Technical Specifications
                                          3.5.2, ``ECCS Operating,''
                                          Action A.1 to allow a one-time
                                          temporary change to the
                                          Completion Time from 72 hours
                                          to not to exceed 12 days to
                                          conduct seal repairs on the 1A
                                          Low Head Safety Injection pump
                                          (1SI-P-1A).
Public Comments Received as to Proposed  Yes.
 NSHC (Yes/No).
------------------------------------------------------------------------

    Authority: 42 U.S.C. 2011 et seq.

    Dated: August 14, 2026.

    For the Nuclear Regulatory Commission.
David Wrona,
Chief, Operating Reactor Licensing and Data Branch 1, Division of 
Licensing Projects 1, Office of Nuclear Reactor Regulation.
[FR Doc. 2026-16798 Filed 8-17-26; 8:45 am]