[Federal Register Volume 91, Number 153 (Tuesday, August 11, 2026)]
[Notices]
[Pages 51751-51755]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-16309]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2026-3400]


Application for Amendments to Facility Operating Licenses 
Involving Proposed No Significant Hazards Consideration Determination 
and Containing Sensitive Unclassified Non-Safeguards Information and 
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment request; notice of opportunity to comment, 
request a hearing, and petition for leave to intervene; order imposing 
procedures.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC, the Commission) 
received, and is considering approval of, one request to amend two 
licenses. The license amendment request is for St. Lucie Plant, Unit 
Nos. 1 and 2. For the license amendment request, the NRC proposes to 
determine that it involves no significant hazards consideration (NSHC). 
Because the amendment request contains sensitive unclassified non-
safeguards information (SUNSI), the NRC is issuing an order imposing 
procedures to obtain access to SUNSI for contention preparation by 
persons who file a hearing request or petition for leave to intervene.

DATES: Comments must be filed by September 10, 2026. A request for a 
hearing or petitions for leave to intervene must be filed by October 
13, 2026. Any potential party as defined in section 2.4 of title 10 of 
the Code of Federal Regulations (10 CFR) who believes access to SUNSI 
is necessary to respond to this notice must request document access by 
August 21, 2026.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3400. Address 
questions about Docket IDs in Regulations.gov to Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: Office of Nuclear Material Safety and 
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, ATTN: Program Management, Announcements and 
Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Paula Blechman, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2242; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-3400, facility name, unit 
number(s),

[[Page 51752]]

docket number(s), application date, and subject when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3400.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to [email protected]. The ADAMS accession number for each document 
referenced (if it is available in ADAMS) is provided the first time 
that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2026-3400, facility name, unit number(s), docket 
number(s), application date, and subject, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Background

    Pursuant to section 189a.(1)-(2) of the Atomic Energy Act of 1954, 
as amended (the Act), the NRC is publishing this notice. The Act 
requires the Commission to publish notice of any amendments issued or 
proposed to be issued and grants the Commission the authority to issue 
and make immediately effective any amendment to an operating license or 
combined license, as applicable, upon a determination by the Commission 
that such amendment involves NSHC, notwithstanding the pendency before 
the Commission of a request for a hearing from any person.
    This notice includes a notice of amendments containing SUNSI.

III. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses, Proposed No Significant Hazards Consideration 
Determination, and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment request involves NSHC. Under the Commission's regulations in 
10 CFR 50.92, this means that operation of the facility in accordance 
with the proposed amendments would not (1) involve a significant 
increase in the probability or consequences of an accident previously 
evaluated, or (2) create the possibility of a new or different kind of 
accident from any accident previously evaluated, or (3) involve a 
significant reduction in a margin of safety. The basis for this 
proposed determination for the amendment request is shown as follows.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendments involve NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of the 30-day comment period 
if circumstances change during the 30-day comment period such that 
failure to act in a timely way would result, for example, in derating 
or shutdown of the facility. If the Commission takes action on any of 
these amendments prior to the expiration of either the comment period 
or the notice period, it will publish a notice of issuance in the 
Federal Register. If the Commission makes a final NSHC determination 
for any of these amendments, any hearing on those amendments will take 
place after issuance. The Commission expects that the need to take this 
action will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult 10 
CFR 2.309. If a petition is filed, the Commission or a presiding 
officer will rule on the petition and, if appropriate, a notice of a 
hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of NSHC, which 
will serve to establish when the hearing is held. If the final 
determination is that the license amendment request involves NSHC, the 
Commission may issue the amendments and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendments. If the final determination is that 
the license amendment request involves a significant hazards 
consideration, then any hearing held would take place before the 
issuance of the amendments unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or

[[Page 51753]]

designated agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h) no later than 60 days from 
the date of publication of this notice. Alternatively, a State, local 
governmental body, Federally recognized Indian Tribe, or designated 
agency thereof, may participate as a non-party under 10 CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and the NRC's public website 
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(https://www.nrc.gov/site-help/e-submittals.html).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate which allows the participant (or their counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (https://www.nrc.gov/site-help/e-submittals.html), by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available on the 
NRC's public website (https://ehd.nrc.gov), unless otherwise excluded 
pursuant to an order of the presiding officer. If you do not have an 
NRC-issued digital ID certificate as previously described, click 
``cancel'' when the link requests certificates and you will be 
automatically directed to the NRC's electronic hearing docket where you 
will be able to access any publicly available documents in a particular 
hearing docket. Participants are requested not to include personal 
privacy information such as social security numbers, home addresses, or 
personal phone numbers in their filings unless an NRC regulation or 
other law requires submission of such information. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants should not include copyrighted materials in 
their submission.
    The following table provides the plant name, docket numbers, date 
of application, ADAMS accession number, and location in the application 
of the licensee's proposed NSHC determination. For further details with 
respect to this license amendment application, see the application for 
amendment, publicly available portions of which are available for 
public inspection in ADAMS. For additional direction on accessing 
information related to this document, see the ``Obtaining Information 
and Submitting Comments'' section of this document.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
 Florida Power & Light Company, et al.; St. Lucie Plant, Unit Nos. 1 and
                         2; St. Lucie County, FL
------------------------------------------------------------------------
Docket Nos........................  50-335, 50-389.
------------------------------------------------------------------------
Application Date..................  April 13, 2026.
ADAMS Accession No................  ML26104A090.
Location in Application of NSHC...  Pages 8-9 of Enclosure 1.

[[Page 51754]]

 
Brief Description of Amendment(s).  The proposed license amendments
                                     would modify the design and
                                     licensing bases for St. Lucie
                                     Plant, Unit Nos. 1 and 2, to
                                     exclude the dynamic effects
                                     associated with postulated pipe
                                     ruptures in Class 1 auxiliary
                                     systems connected to reactor
                                     coolant system piping.
                                     Specifically, the proposed license
                                     amendments would expand the
                                     applicability of the leak-before-
                                     break methodology to the
                                     pressurizer surge, shutdown
                                     cooling, and safety injection tank
                                     system piping.
-----------------------------------
Proposed Determination............  NSHC.
Name of Attorney for Licensee,      Steven Hamrick, Managing Attorney--
 Mailing Address.                    Nuclear, Florida Power and Light
                                     Company, 801 Pennsylvania Avenue
                                     NW, Suite 220, Washington, DC
                                     20004.
NRC Project Manager, Telephone      Blake Purnell, 301-415-1380.
 Number.
------------------------------------------------------------------------

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards

Information for Contention Preparation

Florida Power & Light Company, et al.; St. Lucie Plant, Unit Nos. 1 and 
2; St. Lucie County, FL

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing or 
opportunity for hearing, any potential party who believes access to 
SUNSI is necessary to respond to this notice may request access to 
SUNSI. A ``potential party'' is any person who intends to participate 
as a party by demonstrating standing and filing an admissible 
contention under 10 CFR 2.309. Requests for access to SUNSI submitted 
later than 10 days after publication of this notice will not be 
considered absent a showing of good cause for the late filing, 
addressing why the request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Deputy General Counsel 
for Licensing, Hearings, and Enforcement, Office of the General 
Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. 
The expedited delivery or courier mail address for both offices is: 
U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, 
Maryland 20852. The email addresses for the Office of the Secretary and 
the Office of the General Counsel are [email protected] and 
[email protected], respectively.\1\ The request must 
include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C, the NRC staff will determine within 10 days of receipt of 
the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2), the NRC staff will notify the requestor in writing 
that access to SUNSI has been granted. The written notification will 
contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or proposed Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
receipt of (or access to) that information. However, if more than 25 
days remain between the petitioner's receipt of (or access to) the 
information and the deadline for filing all other contentions (as 
established in the notice of hearing or opportunity for hearing), the 
petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and requisite need, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within five days of receipt of that 
determination with: (a) the presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if this individual is unavailable, another 
administrative judge, or an Administrative Law Judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    (3) Further appeals of decisions under this paragraph must be made 
pursuant to 10 CFR 2.311.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed within 5 days of the notification by the 
NRC staff of its grant of access and must be filed with: (a) the 
presiding officer designated in this proceeding; (b) if no presiding 
officer has been appointed, the Chief Administrative Judge, or if this 
individual is unavailable, another administrative judge, or an 
Administrative Law Judge with jurisdiction pursuant to 10 CFR

[[Page 51755]]

2.318(a); or (c) if another officer has been designated to rule on 
information access issues, with that officer.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562; August 3, 2012, 78 FR 34247, June 7, 2013) apply to 
appeals of NRC staff determinations (because they must be served on 
a presiding officer or the Commission, as applicable), but not to 
the initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. The 
attachment to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

(Authority: 42 U.S.C. 2011 et seq.)

    Dated: August 7, 2026.
    For the Nuclear Regulatory Commission.
Jody Martin,
Secretary of the Commission.

ATTACHMENT 1--General Target Schedule for Processing and Resolving 
Requests for Access to Sensitive Unclassified Non-Safeguards 
Information in This Proceeding

------------------------------------------------------------------------
                Day                            Event/activity
------------------------------------------------------------------------
0.................................  Publication of Federal Register
                                     notice of hearing or opportunity
                                     for hearing, including order with
                                     instructions for access requests.
10................................  Deadline for submitting requests for
                                     access to Sensitive Unclassified
                                     Non-Safeguards Information (SUNSI)
                                     with information: (i) supporting
                                     the standing of a potential party
                                     identified by name and address; and
                                     (ii) describing the need for the
                                     information in order for the
                                     potential party to participate
                                     meaningfully in an adjudicatory
                                     proceeding.
60................................  Deadline for submitting petition for
                                     intervention containing: (i)
                                     demonstration of standing; and (ii)
                                     all contentions whose formulation
                                     does not require access to SUNSI
                                     (+25 Answers to petition for
                                     intervention; +7 petitioner/
                                     requestor reply).
20................................  U.S. Nuclear Regulatory Commission
                                     (NRC) staff informs the requestor
                                     of the staff's determination
                                     whether the request for access
                                     provides a reasonable basis to
                                     believe standing can be established
                                     and shows need for SUNSI. (NRC
                                     staff also informs any party to the
                                     proceeding whose interest
                                     independent of the proceeding would
                                     be harmed by the release of the
                                     information.) If NRC staff makes
                                     the finding of need for SUNSI and
                                     likelihood of standing, NRC staff
                                     begins document processing
                                     (preparation of redactions or
                                     review of redacted documents).
25................................  If NRC staff finds no ``need'' or no
                                     likelihood of standing, the
                                     deadline for petitioner/requestor
                                     to file a motion seeking a ruling
                                     to reverse the NRC staff's denial
                                     of access; NRC staff files copy of
                                     access determination with the
                                     presiding officer (or Chief
                                     Administrative Judge or other
                                     designated officer, as
                                     appropriate). If NRC staff finds
                                     ``need'' for SUNSI, the deadline
                                     for any party to the proceeding
                                     whose interest independent of the
                                     proceeding would be harmed by the
                                     release of the information to file
                                     a motion seeking a ruling to
                                     reverse the NRC staff's grant of
                                     access.
30................................  Deadline for NRC staff reply to
                                     motions to reverse NRC staff
                                     determination(s).
40................................  (Receipt +30) If NRC staff finds
                                     standing and need for SUNSI,
                                     deadline for NRC staff to complete
                                     information processing and file
                                     motion for Protective Order and
                                     proposed Non-Disclosure Agreement
                                     or Affidavit. Deadline for
                                     applicant/licensee to file proposed
                                     Non-Disclosure Agreement or
                                     Affidavit for SUNSI.
A.................................  If access is granted: issuance of
                                     presiding officer or other
                                     designated officer decision on
                                     motion for Protective Order for
                                     access to sensitive information
                                     (including schedule for providing
                                     access and submission of
                                     contentions) or decision reversing
                                     a final adverse determination by
                                     the NRC staff.
A + 3.............................  Deadline for filing executed Non-
                                     Disclosure Agreements or
                                     Affidavits. Access provided to
                                     SUNSI consistent with decision
                                     issuing the Protective Order.
A + 28............................  Deadline for submission of
                                     contentions whose development
                                     depends upon access to SUNSI.
                                     However, if more than 25 days
                                     remain between the petitioner's
                                     receipt of (or access to) the
                                     information and the deadline for
                                     filing all other contentions (as
                                     established in the notice of
                                     hearing or notice of opportunity
                                     for hearing), the petitioner may
                                     file its SUNSI contentions by that
                                     later deadline.
A + 53............................  (Contention receipt +25) Answers to
                                     contentions whose development
                                     depends upon access to SUNSI.
A + 60............................  (Answer receipt +7) Petitioner/
                                     Intervenor reply to answers.
>A + 60...........................  Decision on contention admission.
------------------------------------------------------------------------


[FR Doc. 2026-16309 Filed 8-10-26; 8:45 am]
BILLING CODE 7590-01-P