NUCLEAR REGULATORY COMMISSION
[NRC-2026-3433]
Biweekly Notice; Applications and Amendments to Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Biweekly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 189a.(2) of the Atomic Energy Act of 1954,
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is
publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments
[[Page 45834]]
issued, or proposed to be issued, and grants the Commission the
authority to issue and make immediately effective any amendment to an
operating license or combined license, as applicable, upon a
determination by the Commission that such amendment involves no
significant hazards consideration (NSHC), notwithstanding the pendency
before the Commission of a request for a hearing from any person.
DATES: Comments must be filed by August 20, 2026. A request for a
hearing or petitions for leave to intervene must be filed by September
21, 2026. This biweekly notice includes all amendments issued, or
proposed to be issued, from June 23, 2026, to July 6, 2026. The last
biweekly notice was published on July 7, 2026.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject); however, the NRC encourages electronic
comment submission through the Federal rulemaking website.
Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3433. Address
questions about Docket IDs in Regulations.gov to Bridget Curran;
telephone: 301-415-1003; email: [email protected]. For technical
questions, contact the individual(s) listed in the For Further
Information Contact section of this document.
Mail comments to: Office of Nuclear Material Safety and
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, ATTN: Program Management, Announcements and
Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Susan Lent, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-1365; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2026-3433, facility name, unit
number(s), docket number(s), application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly available information related to this
action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3433.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.''
For problems with ADAMS, please contact the NRC's Public Document Room
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email
to [email protected]. For the convenience of the reader,
instructions about obtaining materials referenced in this document are
provided in the ``Availability of Documents'' section.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2026-3433, facility name, unit number(s), docket
number(s), application date, and subject, in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
For the facility-specific amendment requests shown in this notice,
the Commission finds that the licensees' analyses provided, consistent
with section 50.91 of title 10 of the Code of Federal Regulations (10
CFR) ``Notice for public comment; State consultation,'' are sufficient
to support the proposed determinations that these amendment requests
involve NSHC. Under the Commission's regulations in 10 CFR 50.92,
operation of the facilities in accordance with the proposed amendments
would not (1) involve a significant increase in the probability or
consequences of an accident previously evaluated; or (2) create the
possibility of a new or different kind of accident from any accident
previously evaluated; or (3) involve a significant reduction in a
margin of safety.
The Commission is seeking public comments on these proposed
determinations. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determinations.
Normally, the Commission will not issue the amendments until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue any of these license amendments before expiration
of the 60-day period provided that its final determination is that the
amendment involves NSHC. In addition, the Commission may issue any of
these amendments prior to the expiration of the 30-day comment period
if circumstances change during the 30-day comment period such that
failure to act in a timely way would result, for example in derating or
shutdown of the facility. If the Commission takes action on any of
these amendments prior to the expiration of either the comment period
or the notice period, it will publish in the Federal Register a notice
of issuance. If the Commission makes a final NSHC determination for any
of these amendments, any hearing will take place after issuance. The
Commission expects that the need to take action on any amendment before
60 days have elapsed will occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
person (petitioner) whose interest may be
[[Page 45835]]
affected by any of these actions may file a request for a hearing and
petition for leave to intervene (petition) with respect to that action.
Petitions shall be filed in accordance with the Commission's ``Agency
Rules of Practice and Procedure'' in 10 CFR part 2. Interested persons
should consult 10 CFR 2.309. If a petition is filed, the Commission or
a presiding officer will rule on the petition and, if appropriate, a
notice of a hearing will be issued.
Petitions must be filed no later than 60 days from the date of
publication of this notice in accordance with the filing instructions
in the ``Electronic Submissions (E-Filing)'' section of this document.
Petitions and motions for leave to file new or amended contentions that
are filed after the deadline will not be entertained absent a
determination by the presiding officer that the filing demonstrates
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i)
through (iii).
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration, which will serve to establish when
the hearing is held. If the final determination is that the license
amendment request involves no significant hazards consideration, the
Commission may issue the amendment and make it immediately effective,
notwithstanding the request for a hearing. Any hearing would take place
after issuance of the amendment. If the final determination is that the
license amendment request involves a significant hazards consideration,
then any hearing held would take place before the issuance of the
amendment unless the Commission finds an imminent danger to the health
or safety of the public, in which case it will issue an appropriate
order or rule under 10 CFR part 2.
A State, local governmental body, Federally recognized Indian
Tribe, or designated agency thereof, may submit a petition to the
Commission to participate as a party under 10 CFR 2.309(h) no later
than 60 days from the date of publication of this notice.
Alternatively, a State, local governmental body, Federally recognized
Indian Tribe, or designated agency thereof, may participate as a non-
party under 10 CFR 2.315(c).
For information about filing a petition and about participation by
a person not a party under 10 CFR 2.315, see ADAMS Accession No.
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and the NRC's public website
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including
documents filed by an interested State, local governmental body,
Federally recognized Indian Tribe, or designated agency thereof that
requests to participate under 10 CFR 2.315(c), must be filed in
accordance with 10 CFR 2.302. The E-Filing process requires
participants to submit and serve all adjudicatory documents over the
internet, or in some cases, to mail copies on electronic storage media,
unless an exemption permitting an alternative filing method, as further
discussed, is granted. Detailed guidance on electronic submissions is
located in the ``Guidance for Electronic Submissions to the NRC''
(ADAMS Accession No. ML13031A056), and on the NRC's public website
(https://www.nrc.gov/site-help/e-submittals.html).
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to: (1) request a digital identification
(ID) certificate which allows the participant (or their counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or their counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public website (https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is
obtained and a docket is created, the participant must submit
adjudicatory documents in the Portable Document Format. Guidance on
submissions is available on the NRC's public website (https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is
considered complete at the time the document is submitted through the
NRC's E-Filing system. To be timely, an electronic filing must be
submitted to the E-Filing system no later than 11:59 p.m. ET on the due
date. Upon receipt of a transmission, the E-Filing system time-stamps
the document and sends the submitter an email confirming receipt of the
document. The E-Filing system also distributes an email that provides
access to the document to the NRC's Office of the General Counsel and
any others who have advised the Office of the Secretary that they wish
to participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed in order to obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website (https://www.nrc.gov/site-help/e-submittals.html), by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., ET, Monday through Friday, except Federal holidays.
Participants who believe that they have good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted in accordance with 10 CFR
2.302(b)-(d). Participants filing adjudicatory documents in this manner
are responsible for serving their documents on all other participants.
Participants granted an exemption under 10 CFR 2.302(g)(2) must still
meet the electronic formatting requirement in 10 CFR 2.302(g)(1),
unless the participant also seeks and is granted an exemption from 10
CFR 2.302(g)(1).
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket, which is publicly available on the
NRC's public website (https://adams.nrc.gov/ehd), unless otherwise
excluded pursuant to an order of the presiding officer. If you do not
have an NRC-issued digital ID certificate as previously described,
click ``cancel'' when the link requests certificates and you will be
automatically directed to the NRC's electronic hearing docket where you
will be able to access any publicly available documents in a particular
hearing docket. Participants are
[[Page 45836]]
requested not to include personal privacy information such as social
security numbers, home addresses, or personal phone numbers in their
filings unless an NRC regulation or other law requires submission of
such information. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a Fair Use application, participants should not include
copyrighted materials in their submission.
The following table provides the plant name, docket number, date of
application, ADAMS accession number, and location in the application of
the licensees' proposed NSHC determinations. For further details with
respect to these license amendment applications, see the applications
for amendment, which are available for public inspection in ADAMS. For
additional direction on accessing information related to this document,
see the ``Obtaining Information and Submitting Comments'' section of
this document.
License Amendment Request(s)
------------------------------------------------------------------------
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Oconee Nuclear Station, Units 1, 2, and 3;
Oconee County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear
Power Plant, Unit 1; Wake and Chatham Counties, NC
------------------------------------------------------------------------
Docket Nos................... 50-269, 50-270, 50-287, 50-400.
Application date............. May 21, 2026.
ADAMS Accession No........... ML26141A391.
Location in Application of Page E-18-E19 of the Enclosure.
NSHC.
Brief Description of The proposed amendments would modify the
Amendments. Shearon Harris Nuclear Power Plant, Unit
1, and Oconee Nuclear Station, Units 1,
2, and 3 technical specifications (TSs)
to allow the use of online monitoring
(OLM) methodology for determining the
calibration frequency of pressure,
level, and flow transmitters. The
amendments would revise the TS
definitions related to channel
calibration and add a new administrative
program for OLM, thereby transitioning
from time-based to condition-based
calibration frequencies for affected
transmitters. These changes also clarify
the scope of transmitters subject to OLM
and the associated programmatic controls
for calibration activities and dynamic
response assessments using noise
analysis techniques.
Proposed Determination....... NSHC.
Name of Attorney for Tracey Mitchell LeRoy, Deputy General
Licensee, Mailing Address. Counsel, Duke Energy Corporation, 525 S
Tryon Street, Charlotte, NC 28202.
NRC Project Manager, Tony Sierra, 301-287-9531.
Telephone Number.
------------------------------------------------------------------------
Entergy Operations, Inc.; Arkansas Nuclear One, Unit 2; Pope County, AR;
Entergy Operations, Inc., System Energy Resources, Inc., Cooperative
Energy, A Mississippi Electric Cooperative, and Entergy Mississippi,
LLC; Grand Gulf Nuclear Station, Unit 1; Claiborne County, MS; Entergy
Louisiana, LLC, and Entergy Operations, Inc.; River Bend Station, Unit
1; West Feliciana Parish, LA; Entergy Operations, Inc.; Waterford Steam
Electric Station, Unit 3; St. Charles Parish, LA
------------------------------------------------------------------------
Docket Nos................... 50-368, 50-416, 50-458, 50-382.
Application date............. March 31, 2026.
ADAMS Accession No........... ML26090A114.
Location in Application of Pages 4-5 of the Enclosure.
NSHC.
Brief Description of The proposed amendments would adopt
Amendments. Technical Specifications Task Force
(TSTF) Traveler TSTF-599, ``Eliminate
Periodic Surveillance Test of
Simultaneous Start of Redundant Diesel
Generators,'' which is an approved
change to the Standard Technical
Specifications, into the Arkansas
Nuclear One, Unit 2; Grand Gulf Nuclear
Station, Unit 1; River Bend Station,
Unit 1; and Waterford Steam Electric
Station, Unit 3 technical
specifications.
Proposed Determination....... NSHC.
Name of Attorney for Susan Raimo, Associate General Counsel-
Licensee, Mailing Address. Nuclear, 101 Constitution Avenue NW,
Washington, DC 20001.
NRC Project Manager, Jason Drake, 301-415-8378.
Telephone Number.
------------------------------------------------------------------------
Northern States Power Company; Prairie Island Nuclear Generating Plant,
Units 1 and 2; Goodhue County, MN
------------------------------------------------------------------------
Docket Nos................... 50-282, 50-306.
Application date............. June 23, 2026.
ADAMS Accession No........... ML26174A386.
Location in Application of Pages 4-5 of the Enclosure.
NSHC.
Brief Description of The proposed amendments would adopt
Amendments. Technical Specification (TS) Task Force
(TSTF) Traveler 585 (TSTF-585), ``Revise
LCO [Limiting Condition for Operation]
3.0.3 to Require Managing Risk.'' TSTF-
585 revises LCO 3.0.3 to require
assessing and managing plant risk
whenever LCO 3.0.3 is entered. If the
risk assessment determines that
continuing plant operation is acceptable
and other conditions are satisfied, 24
hours from entry into LCO 3.0.3 is
permitted to initiate a shutdown.
Otherwise, initiation of the shutdown is
required immediately. The proposed
amendments would also revise or add some
TS Required Actions to direct a plant
shutdown instead of entry into LCO
3.0.3.
Proposed Determination....... NSHC.
Name of Attorney for Andrew Van Duzer, Assistant General
Licensee, Mailing Address. Counsel; Xcel Energy; 701 Pennsylvania
Ave. NW; Suite 250; Washington, DC
20004.
NRC Project Manager, Robert Kuntz, 301-415-3733.
Telephone Number.
------------------------------------------------------------------------
[[Page 45837]]
PSEG Nuclear LLC; Hope Creek Generating Station; Salem County, NJ; PSEG
Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Salem
County, NJ
------------------------------------------------------------------------
Docket Nos................... 50-354, 50-272, 50-311.
Application date............. May 27, 2026.
ADAMS Accession No........... ML26148A253.
Location in Application of Pages 3-4 of the Enclosure.
NSHC.
Brief Description of The proposed amendments would revise
Amendments. technical specifications to adopt
Technical Specifications Task Force
(TSTF) Traveler TSTF-599, Revision 1,
``Eliminate Periodic Surveillance Test
of Simultaneous Start of Redundant
Diesel Generators,'' with site-specific
variations and editorial changes. The
proposed changes would eliminate the
periodic surveillance requirement to
verify that all required diesel
generators achieve rated frequency and
voltage within the specified time period
when started simultaneously.
Proposed Determination....... NSHC.
Name of Attorney for Francis Romano, PSEG-Services
Licensee, Mailing Address. Corporation, 80 Park Plaza, T-10,
Newark, NJ 07102.
NRC Project Manager, Audrey Klett, 301-415-0489.
Telephone Number.
------------------------------------------------------------------------
Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2;
Hamilton County, TN; Tennessee Valley Authority; Watts Bar Nuclear
Plant, Units 1 and 2; Rhea County, TN
------------------------------------------------------------------------
Docket Nos................... 50-327, 50-328, 50-390, 50-391.
Application date............. June 2, 2026.
ADAMS Accession No........... ML26153A303.
Location in Application of Pages E8-E9 of the Enclosure.
NSHC.
Brief Description of The proposed amendments would revise
Amendments. certain specifications in Sequoyah
Nuclear Plant, Units 1 and 2, and Watts
Bar Nuclear Plant, Units 1 and 2 to
remove the term ``CORE ALTERATIONS'' and
make other changes. The proposed changes
are requested in accordance with
Technical Specifications Task Force
(TSTF) Traveler TSTF-471, Revision 1,
``Eliminate use of term CORE ALTERATIONS
in ACTIONS and Notes.''
Proposed Determination....... NSHC.
Name of Attorney for Edward C. Meade; (Interim) Executive VP
Licensee, Mailing Address. and General Counsel; Tennessee Valley
Authority; 400 West Summit Hill Drive;
WT 6A; Knoxville, TN 37902.
NRC Project Manager, Kimberly Green, 301-415-1627.
Telephone Number.
------------------------------------------------------------------------
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1
and 2; Surry County, VA
------------------------------------------------------------------------
Docket Nos................... 50-280, 50-281.
Application date............. May 18, 2026.
ADAMS Accession No........... ML26138A237.
Location in Application of Pages 25-27 of Enclosure 1.
NSHC.
Brief Description of The proposed amendments would revise
Amendments. Technical Specification (TS) 2.3,
``Limiting Safety System Settings,
Protective Instrumentation,'' TS 3.7,
``Instrumentation Systems,'' and TS 4.1,
``Operational Safety Review,'' to adjust
the reactor trip on turbine trip
interlock function from P-7 (Low Power
Reactor Trip Block) to P-8 (Power Range
Neutron Flux).
Proposed Determination....... NSHC.
Name of Attorney for W.S. Blair, Senior Counsel, Dominion
Licensee, Mailing Address. Energy Services, Inc., 120 Tredegar St.,
RS-2, Richmond, VA 23219.
NRC Project Manager, John Klos, 301-415-5136.
Telephone Number.
------------------------------------------------------------------------
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1
and 2; Surry County, VA
------------------------------------------------------------------------
Docket Nos................... 50-280, 50-281.
Application date............. May 27, 2026.
ADAMS Accession No........... ML26147A328.
Location in Application of Pages 35-37 of Attachment 1.
NSHC.
Brief Description of The proposed amendments would add a
Amendments. footnote to Technical Specification (TS)
3.16, ``Emergency Power System,'' to
allow a one-time extension of the
Allowed Outage Time in TS 3.16 Action
B.1.a.3 from 7 days to 14 days for Surry
Power Station, Unit No. 2, supportive of
the replacement of feeder cables on the
Unit No. 1 Emergency Diesel Generator.
Proposed Determination....... NSHC.
Name of Attorney for W.S. Blair, Senior Counsel, Dominion
Licensee, Mailing Address. Energy Services, Inc., 120 Tredegar St.,
RS-2, Richmond, VA 23219.
NRC Project Manager, John Klos, 301-415-5136.
Telephone Number.
------------------------------------------------------------------------
III. Notice of Issuance of Amendments to Facility Operating Licenses
and Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as
[[Page 45838]]
applicable, proposed NSHC determination, and opportunity for a hearing
in connection with these actions, were published in the Federal
Register as indicated in the safety evaluation for each amendment.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated in the safety evaluation for the amendment.
For further details with respect to each action, see the amendment
and associated documents such as the Commission's letter and safety
evaluation, which may be obtained using the ADAMS accession numbers
indicated in the following table. The safety evaluation will provide
the ADAMS accession numbers for the application for amendment and the
Federal Register citation for any environmental assessment. All of
these items can be accessed as described in the ``Obtaining Information
and Submitting Comments'' section of this document.
License Amendment Issuance(s)
------------------------------------------------------------------------
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
No. 3; New London County, CT
------------------------------------------------------------------------
Docket No.................... 50-423.
Amendment Date............... July 1, 2026.
ADAMS Accession No........... ML26168A238.
Amendment No................. 296.
Brief Description of The amendment revised the Millstone Power
Amendment. Station, Unit No. 3, technical
specification to adopt Technical
Specification Task Force (TSTF) Traveler
TSTF-601, Revision 1, ``Extend Shield
Building Completion Time After
Refueling.'' The amendment permits
extension of the completion time when
the Unit No. 3 ``Secondary Containment''
is inoperable while in Hot Standby or
Hot Shutdown, and Startup (criticality)
has not been entered following
refueling.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Florida Power & Light Company, et al.; St. Lucie Plant, Unit Nos. 1 and
2; St. Lucie County, FL; Florida Power & Light Company; Turkey Point
Nuclear Generating Unit Nos. 3 and 4; Miami-Dade County, FL; NextEra
Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2;
Manitowoc County, WI; NextEra Energy Seabrook, LLC; Seabrook Station,
Unit No. 1; Rockingham County, NH
------------------------------------------------------------------------
Docket Nos................... 50-266, 50-301, 50-443, 50-335, 50-389,
50-250, 50-251.
Amendment Date............... July 2, 2026.
ADAMS Accession No........... ML26177A282.
Amendment Nos................ Point Beach (Unit 1-280, Unit 2-282);
Seabrook (Unit 1-181); St. Lucie (Unit 1-
258, Unit 2-215); Turkey Point (Unit 3-
306, Unit 4-299).
Brief Description of The amendments revised the technical
Amendments. specifications for each license to adopt
an online monitoring program to
transition from time-based frequency to
condition-based frequency for checking
the calibrations of some pressure, flow,
and level transmitters.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Florida Power & Light Company; St. Lucie Plant, Unit No. 1; St. Lucie
County, FL
------------------------------------------------------------------------
Docket No.................... 50-335.
Amendment Date............... June 18, 2026.
ADAMS Accession No........... ML26163A185.
Amendment No................. 257.
Brief Description of The amendment revised Technical
Amendment. Specification (TS) 3.7.15, ``Spent Fuel
Pool Storage,'' and TS 4.3, ``Fuel
Storage,'' to support updated spent fuel
pool and new fuel vault criticality
analyses.
Public Comments Received as Yes.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2;
Salem County, NJ
------------------------------------------------------------------------
Docket Nos................... 50-272, 50-311.
Amendment Date............... June 26, 2026.
ADAMS Accession No........... ML26149A187.
Amendment Nos................ 354 (Unit 1) and 336 (Unit 2).
Brief Description of The amendments revised the nuclear
Amendments. criticality safety analysis and the
technical specifications for fresh and
spent fuel storage. The amendments also
included minor editorial changes to the
technical specifications.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos................... 52-025, 52-026.
Amendment Date............... June 23, 2026.
ADAMS Accession No........... ML26163A214.
[[Page 45839]]
Amendment Nos................ 216 (Unit 3) and 213 (Unit 4).
Brief Description of The amendments modified Technical
Amendments. Specification 3.5.2, ``Core Makeup Tanks
(CMTs)--Operating,'' to revise the
minimum allowable CMT boron
concentration and the minimum average
CMT boron concentration.
Public Comments Received as Yes.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea
County, TN
------------------------------------------------------------------------
Docket Nos................... 50-390, 50-391.
Amendment Date............... June 25, 2026.
ADAMS Accession No........... ML26155A167.
Amendment Nos................ 181 (Unit 1) and 86 (Unit 2).
Brief Description of The amendments revised various technical
Amendments. specifications within Watts Bar Nuclear
Plant, Units 1 and 2, Technical
Specification Sections 1.4, 3.4, 3.7,
and 3.9, by adopting several Technical
Specifications Task Force travelers.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
------------------------------------------------------------------------
Docket No.................... 50-483.
Amendment Date............... June 24, 2026.
ADAMS Accession No........... ML26134A082.
Amendment No................. 242.
Brief Description of The amendment revised the Callaway Plant,
Amendment. Unit No. 1 Technical Specifications
(TSs) to adopt Technical Specifications
Task Force (TSTF)-599, Revision 1,
``Eliminate Periodic Surveillance Test
of Simultaneous Start of Redundant
Diesel Generators,'' which is an
approved change to the Standard
Technical Specifications, into the
Callaway TSs. The amendment eliminates
the periodic surveillance requirement to
verify that all required diesel
generators achieve rated frequency and
voltage within the specified time period
when started simultaneously.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Vistra Operations Company LLC; Davis-Besse Nuclear Power Station, Unit
1; Ottawa County, OH
------------------------------------------------------------------------
Docket No.................... 50-346.
Amendment Date............... June 17, 2026.
ADAMS Accession No........... ML26149A026.
Amendment No................. 313.
Brief Description of The amendment adopted Technical
Amendment. Specification Task Force Traveler 585,
``Revise LCO [Limiting Condition for
Operation] 3.0.3 to Require Managing
Risk``.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
License Amendment Request(s)--Repeat of Individual Federal Register
Notice
------------------------------------------------------------------------
------------------------------------------------------------------------
Vistra Operations Company LLC; Beaver Valley Power Station, Unit 1;
Beaver County, PA
------------------------------------------------------------------------
Docket No.............................. 50-334.
Application Date....................... June 26, 2026.
ADAMS Accession No..................... ML26146A267.
Brief Description of Amendment......... The proposed amendment would
revise the technical
specifications to allow an
alternative completion time
for restoring equipment to
accommodate repairs,
specifically to allow a one-
time extended Completion Time
from 72 hours to 12 days to
restore one train of Emergency
Core Cooling System to
Operable.
Date & Cite of Federal Register June 17, 2026 (91 FR 36883).
Individual Notice.
Expiration Dates for Public Comments & July 20, 2026 (Public
Hearing Requests. Comments); August 17, 2026
(Hearing Request).
------------------------------------------------------------------------
Authority: 42 U.S.C. 2011 et seq.
Dated: July 13, 2026.
For the Nuclear Regulatory Commission.
Mahmoud Jardaneh,
Acting Director, Division of Licensing Projects 1, Office of Nuclear
Reactor Regulation.
[FR Doc. 2026-14652 Filed 7-20-26; 8:45 am]