[Federal Register Volume 91, Number 128 (Tuesday, July 7, 2026)]
[Notices]
[Pages 41665-41670]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-13659]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2026-3202]


Biweekly Notice; Applications and Amendments to Facility 
Operating Licenses and Combined Licenses Involving No Significant 
Hazards Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Biweekly notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, 
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is 
publishing this regular biweekly notice. The Act requires the 
Commission to publish notice of any amendments issued, or proposed to 
be issued, and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration (NSHC), 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person.

DATES: Comments must be filed by August 6, 2026. A request for a 
hearing or petitions for leave to intervene must be filed by September 
8, 2026. This biweekly notice includes all amendments issued, or 
proposed to be issued, from June 9, 2026, to June 22, 2026. The last 
biweekly notice was published on June 23, 2026.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3202. Address 
questions about Docket IDs in Regulations.gov to Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual listed in the ``For Further 
Information Contact'' section of this document.
     Mail comments to: Office of Nuclear Material Safety and 
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, ATTN: Program Management, Announcements and 
Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Angela M. Baxter, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-8209; email: [email protected].

SUPPLEMENTARY INFORMATION:

[[Page 41666]]

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-3202, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-3202.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to [email protected]. The ADAMS accession number for each document 
referenced (if it is available in ADAMS) is provided the first time 
that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2026-3202, facility name, unit number(s), docket 
number(s), application date, and subject, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses and Proposed No Significant 
Hazards Consideration Determination

    For the facility-specific amendment requests shown in this notice, 
the Commission finds that the licensees' analyses provided, consistent 
with section 50.91 of title 10 of the Code of Federal Regulations (10 
CFR) ``Notice for public comment; State consultation,'' are sufficient 
to support the proposed determinations that these amendment requests 
involve NSHC. Under the Commission's regulations in 10 CFR 50.92, 
operation of the facilities in accordance with the proposed amendments 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of the 30-day comment period 
if circumstances change during the 30-day comment period such that 
failure to act in a timely way would result, for example in derating or 
shutdown of the facility. If the Commission takes action on any of 
these amendments prior to the expiration of either the comment period 
or the notice period, it will publish in the Federal Register a notice 
of issuance. If the Commission makes a final NSHC determination for any 
of these amendments, any hearing will take place after issuance. The 
Commission expects that the need to take action on any amendment before 
60 days have elapsed will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult 10 
CFR 2.309. If a petition is filed, the Commission or a presiding 
officer will rule on the petition and, if appropriate, a notice of a 
hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the license 
amendment request involves no significant hazards consideration, the 
Commission may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
license amendment request involves a significant hazards consideration, 
then any hearing held would take place before the issuance of the 
amendment unless the Commission finds an imminent danger to the health 
or safety of the public, in which case it will issue an appropriate 
order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or designated

[[Page 41667]]

agency thereof, may participate as a non-party under 10 CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and the NRC's public website 
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(https://www.nrc.gov/site-help/e-submittals.html).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate which allows the participant (or their counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or their counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (https://www.nrc.gov/site-help/e-submittals.html), by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available on the 
NRC's public website (https://adams.nrc.gov/ehd), unless otherwise 
excluded pursuant to an order of the presiding officer. If you do not 
have an NRC-issued digital ID certificate as previously described, 
click ``cancel'' when the link requests certificates and you will be 
automatically directed to the NRC's electronic hearing docket where you 
will be able to access any publicly available documents in a particular 
hearing docket. Participants are requested not to include personal 
privacy information such as social security numbers, home addresses, or 
personal phone numbers in their filings unless an NRC regulation or 
other law requires submission of such information. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants should not include copyrighted materials in 
their submission.
    The following table provides the plant name, docket number, date of 
application, ADAMS accession number, and location in the application of 
the licensees' proposed NSHC determinations. For further details with 
respect to these license amendment applications, see the applications 
for amendment, which are available for public inspection in ADAMS. For 
additional direction on accessing information related to this document, 
see the ``Obtaining Information and Submitting Comments'' section of 
this document.

                       License Amendment Requests
------------------------------------------------------------------------
 
------------------------------------------------------------------------
         DTE Electric Company; Fermi, Unit 2; Monroe County, MI
------------------------------------------------------------------------
Docket No..............................  50-341.
Application date.......................  March 20, 2026.
ADAMS Accession No.....................  ML26079A190.
Location in Application of NSHC........  Pages 29-31 of the Enclosure.

[[Page 41668]]

 
Brief Description of Amendment.........  The proposed amendment would
                                          modify the Fermi, Unit 2
                                          technical specifications by
                                          incorporating a license
                                          condition to allow
                                          implementation of the
                                          requirements of 10 CFR 50.69,
                                          ``Risk-Informed Categorization
                                          and Treatment of Structures,
                                          Systems, and Components [SSCs]
                                          for Nuclear Power Reactors.''
                                          The amendment would permit the
                                          use of a risk-informed process
                                          to categorize SSCs according
                                          to their safety significance,
                                          enabling alternative treatment
                                          requirements for SSCs of low
                                          safety significance while
                                          maintaining or enhancing
                                          requirements for those of high
                                          safety significance.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jon P. Christinidis, DTE
 Address.                                 Electric Company, Expert
                                          Attorney--Regulatory, 1635
                                          WCB, One Energy Plaza,
                                          Detroit, MI 48226.
NRC Project Manager, Telephone Number..  Luis Cruz Rosado, 301-415-4106.
------------------------------------------------------------------------
    Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No..............................  50-397.
Application date.......................  May 27, 2026.
ADAMS Accession No.....................  ML26147A259.
Location in Application of NSHC........  Pages 1-3 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          adopt Technical Specifications
                                          Task Force (TSTF) Traveler
                                          TSTF-554, ``Revise Reactor
                                          Coolant Leakage
                                          Requirements,'' which is an
                                          approved change to the
                                          Standard Technical
                                          Specifications, into the
                                          Columbia Generating Station
                                          technical specifications
                                          (TSs). The proposed changes
                                          would revise the TS definition
                                          of ``Leakage,'' would clarify
                                          the requirements when pressure
                                          boundary leakage is detected,
                                          and would add a Required
                                          Action when pressure boundary
                                          leakage is identified. The
                                          proposed amendment is
                                          requested as part of the
                                          Consolidated Line Item
                                          Improvement Process.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Ryan Lukson, Assistant General
 Address.                                 Counsel, Energy Northwest, MD
                                          1020, P.O. Box 968, Richland,
                                          WA 99352.
NRC Project Manager, Telephone Number..  Mahesh Chawla, 301-415-8371.
------------------------------------------------------------------------
 Nebraska Public Power District; Cooper Nuclear Station; Nemaha County,
                                   NE
------------------------------------------------------------------------
Docket No..............................  50-298.
Application date.......................  June 17, 2026.
ADAMS Accession No.....................  ML26168A419.
Location in Application of NSHC........  Pages 3-5 of Attachment 1.
Brief Description of Amendment.........  The proposed amendment would
                                          adopt Technical Specification
                                          (TS) Task Force (TSTF)
                                          Traveler TSTF-585 (TSTF-585),
                                          ``Revise LCO 3.0.3 to Require
                                          Managing Risk.'' TSTF-585
                                          would revise Limiting
                                          Condition for Operation (LCO)
                                          3.0.3 to require assessing and
                                          managing plant risk whenever
                                          LCO 3.0.3 is entered. If the
                                          risk assessment determines
                                          that continuing plant
                                          operation is acceptable and
                                          other conditions are
                                          satisfied, 24-hours from entry
                                          into LCO 3.0.3 is permitted to
                                          initiate a shutdown.
                                          Otherwise, initiation of the
                                          shutdown is required
                                          immediately. The proposed
                                          amendment also would revise or
                                          add some TS Required Actions
                                          to direct other actions
                                          instead of entry into LCO
                                          3.0.3.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   John C. McClure, Executive Vice
 Address.                                 President External Affairs and
                                          General Counsel, Nebraska
                                          Public Power District, P.O.
                                          Box 499, Columbus, NE 68601.
NRC Project Manager, Telephone Number..  Tony Sierra, 301-287-9531.
------------------------------------------------------------------------
  Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant,
                Units 1 and 2; San Luis Obispo County, CA
------------------------------------------------------------------------
Docket Nos.............................  50-275, 50-323.
Application date.......................  June 8, 2026.
ADAMS Accession No.....................  ML26159A390.
Location in Application of NSHC........  Pages 2-3 of the Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          revise the implementation
                                          wording for Amendment Nos. 252
                                          and 254, for Diablo Canyon
                                          Nuclear Power Plant, Units 1
                                          and 2, respectively, to
                                          provide for a more flexible
                                          implementation schedule.
                                          Amendment Nos. 252 and 254
                                          modified the technical
                                          specifications to allow the
                                          use of Optimized ZIRLOTM as an
                                          approved fuel rod cladding
                                          material.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jennifer Post, Esq., Pacific
 Address.                                 Gas and Electric Co., 300
                                          Lakeside Drive, Oakland, CA
                                          94612.

[[Page 41669]]

 
NRC Project Manager, Telephone Number..  Samson Lee, 301-415-3168.
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
  3; Limestone County, AL; Tennessee Valley Authority; Sequoyah Nuclear
 Plant, Units 1 and 2; Hamilton County, TN; Tennessee Valley Authority;
         Watts Bar Nuclear Plant, Units 1 and 2; Rhea County, TN
------------------------------------------------------------------------
Docket Nos.............................  50-259, 50-260, 50-296, 50-327,
                                          50-328, 50[dash]390, 50-391.
Application date.......................  May 26, 2026.
ADAMS Accession No.....................  ML26146A133.
Location in Application of NSHC........  Pages E3-E4 of the Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          revise the Browns Ferry
                                          Nuclear Plant, Units 1, 2, and
                                          3, Sequoyah Nuclear Plant,
                                          Units 1 and 2, and Watts Bar
                                          Nuclear Plant, Units 1 and 2,
                                          technical specifications for
                                          the Risk Informed Completion
                                          Time (RICT) Program in
                                          accordance with Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-591,
                                          Revision 0, ``Revise Risk
                                          Informed Completion Time
                                          Program.'' The proposed
                                          amendments would revise the
                                          RICT program to reference
                                          Regulatory Guide 1.200,
                                          Revision 3, instead of
                                          Revision 2, as well as make
                                          other changes to the program
                                          consistent with the traveler.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Edward C. Meade, (Interim)
 Address.                                 Executive VP and General
                                          Counsel, Tennessee Valley
                                          Authority, 400 West Summit
                                          Hill Drive WT 6A, Knoxville,
                                          TN 37902.
NRC Project Manager, Telephone Number..  Kimberly Green, 301-415-1627.
------------------------------------------------------------------------

III. Notice of Issuance of Amendments to Facility Operating Licenses 
and Combined Licenses

    During the period since publication of the last biweekly notice, 
the Commission has issued the following amendments. The Commission has 
determined for each of these amendments that the application complies 
with the standards and requirements of the Atomic Energy Act of 1954, 
as amended (the Act), and the Commission's rules and regulations. The 
Commission has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed NSHC 
determination, and opportunity for a hearing in connection with these 
actions, were published in the Federal Register as indicated in the 
safety evaluation for each amendment.
    Unless otherwise indicated, the Commission has determined that 
these amendments satisfy the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for these amendments. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.22(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to each action, see the amendment 
and associated documents such as the Commission's letter and safety 
evaluation, which may be obtained using the ADAMS accession numbers 
indicated in the following table. The safety evaluation will provide 
the ADAMS accession numbers for the application for amendment and the 
Federal Register citation for any environmental assessment. All of 
these items can be accessed as described in the ``Obtaining Information 
and Submitting Comments'' section of this document.

                       License Amendment Issuances
------------------------------------------------------------------------
 
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
                      No. 3; New London County, CT
------------------------------------------------------------------------
Docket No..............................  50-423.
Amendment Date.........................  June 12, 2026.
ADAMS Accession No.....................  ML26154A163.
Amendment No...........................  295.
Brief Description of Amendment.........  The amendment revised Millstone
                                          Power Station, Unit No. 3,
                                          Technical Specification 3.5.2,
                                          ``ECCS [Emergency Core Cooling
                                          System] Subsystems--Tavg
                                          Greater Than or Equal To
                                          350[deg]F [Degrees
                                          Fahrenheit],'' to provide a
                                          one-time allowance to extend
                                          the allowed outage time from
                                          72 hours to 168 hours.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos.............................  52-025, 52-026.
Amendment Date.........................  June 7, 2026.
ADAMS Accession No.....................  ML26110A004.
Amendment Nos..........................  215 (Unit 3) and 212 (Unit 4).

[[Page 41670]]

 
Brief Description of Amendments........  The amendments revised
                                          Technical Specification 3.4.10
                                          to adopt changes similar to
                                          those that are described in
                                          Technical Specification Task
                                          Force (TSTF) Traveler 490,
                                          Revision 0, ``Deletion of E
                                          Bar Definition and Revision to
                                          RCS [reactor coolant system]
                                          Specific Activity Tech Spec''
                                          (ML052630462).
Public Comments Received as to Proposed  Yes.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Virginia Electric and Power Company, Dominion Nuclear Company; North
          Anna Power Station, Units 1 and 2; Louisa County, VA
------------------------------------------------------------------------
Docket Nos.............................  50-338, 50-339.
Amendment Date.........................  June 5, 2026.
ADAMS Accession No.....................  ML26127A342.
Amendment Nos..........................  299 (Unit 1) and 282 (Unit 2).
Brief Description of Amendments........  The amendments deleted the
                                          technical specification
                                          requirement for the Power
                                          Range Neutron Flux Rate--High
                                          Negative Rate Trip function,
                                          as described in the submittal.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
 Vistra Operations Company LLC; Beaver Valley Power Station, Units 1 and
                          2; Beaver County, PA
------------------------------------------------------------------------
Docket Nos.............................  50-334, 50-412.
Amendment Date.........................  June 10, 2026.
ADAMS Accession No.....................  ML26127A277.
Amendment Nos..........................  328 (Unit 1) and 218 (Unit 2).
Brief Description of Amendments........  The amendments revised the
                                          technical specifications (TS)
                                          based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-599,
                                          Revision 1, ``Eliminate
                                          Periodic Surveillance Test of
                                          Simultaneous Start of
                                          Redundant Diesel Generators,''
                                          and TSTF-599, ``Eliminate
                                          Periodic Surveillance Test of
                                          Simultaneous Start of
                                          Redundant Diesel Generators.''
                                          Specifically, TSTF-589 related
                                          changes eliminated the TS
                                          requirements for the automatic
                                          diesel generator (DG) start
                                          and loading capability to be
                                          operable during shutdown. In
                                          addition, the TSTF-589 changes
                                          modified which DG surveillance
                                          requirements (SRs) are
                                          required during shutdown. The
                                          TSTF-599 changes deleted an SR
                                          requiring verification that,
                                          when started simultaneously,
                                          DGs achieve a specific
                                          frequency and voltage within a
                                          specified time period.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------

    Authority: 42 U.S.C. 2011 et seq.

    Dated: June 25, 2026.

    For the Nuclear Regulatory Commission.
Hip[oacute]lito Gonz[aacute]lez, Acting Director,
Division of Licensing Projects I, Office of Nuclear Reactor Regulation.
[FR Doc. 2026-13659 Filed 7-6-26; 8:45 am]
BILLING CODE 7590-01-P