Ohio Power and Light, LLC; Notice of Application Ready for 
Environmental Analysis and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions; Intent To Prepare an Environmental 
Assessment; and Anticipated Schedule

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.

    a. Type of Application: Original Major License.
    b. Project No.: 15094-002.
    c. Date filed: January 23, 2025.
    d. Applicant: Ohio Power and Light, LLC.
    e. Name of Project: Robert C. Byrd Locks and Dam Hydroelectric 
Project (RC Byrd Project or project).
    f. Location: On the Ohio River in Mason County, West Virginia, at 
the U.S. Army Corps of Engineers' (Corps) Robert C. Byrd Locks and Dam. 
The project would occupy 18.29 acres of federal land managed by the 
Corps.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Jeremy King, P.E., Chief Executive 
Officer, Current Hydro LLC (agent for the applicant, Ohio Power and 
Light, LLC), One Boston Place, Suite 2600, Boston, MA 02108, Telephone: 
(706) 835-8516, Email: [email protected]; and Ms. Hailee Kessell, 
Director of Regulatory Affairs, Current Hydro LLC, One Boston Place, 
Suite 2600, Boston, MA 02108, Telephone: (315) 558-9834, Email: 
[email protected].
    i. FERC Contact: Andy Bernick at (202) 502-8660, or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: on or before 5:00 p.m. Eastern Time on 
March 16, 2026; reply comments are due on or before 5:00 p.m. Eastern 
Time on April 29, 2026.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 10,000 
characters, without prior registration, using the eComment system at 
https://ferconline.ferc.gov/QuickComment.aspx. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. All filings must clearly identify the 
project name and docket number on the first page: Robert C. Byrd Locks 
and Dam Hydroelectric Project (P-15094-002).
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted and is ready for 
environmental analysis at this time and a single environmental 
assessment (EA) will be prepared.\1\
---------------------------------------------------------------------------

    \1\ The unique identification number for documents relating to 
this environmental review is EAXX-019-20-000-1767861985.
---------------------------------------------------------------------------

    l. The proposed RC Byrd Project would be constructed at the two 
parallel decommissioned lock chambers on the West Virginia side of RC 
Byrd Locks and Dam and would consist of the following new facilities: 
(1) two 110-foot-wide, 850-foot-long intake channels with trash racks 
(with a clear spacing of 5 inches); (2) two 110-foot-wide, 142.5-foot-
long, and 71-foot-high concrete powerhouses within the decommissioned 
lock chambers; (3) three horizontal pit Kaplan turbine-generator units 
in each powerhouse with a total installed capacity of 28.5 megawatts 
(MW) for both powerhouses; (4) two 110-foot-wide, 955-foot-long 
tailrace channels; (5) a 213-foot-long, 12.47-kilovolt (kV) underground 
generator lead from each powerhouse to a new 110-foot-long and 110-
foot-wide substation containing a 12.47-kV/69-kV step-up transformer; 
(6) a 2.3-mile-long, 69-kV overhead transmission line connecting the 
project to the point of interconnection at the existing Apple Grove 
substation; (7) a new 170-foot-long access road between

[[Page 2340]]

the existing Corps facility access road and a parking area; and (8) 
appurtenant facilities.
    The proposed RC Byrd Project would operate in a run-of-release 
mode, whereby outflow from the project would approximate inflow made 
available for generation by the Corps. The RC Byrd Project is projected 
to have an annual energy generation of about 165,169 megawatt-hours.
    m. A copy of the application is available for review via the 
internet through the Commission's Home Page (http://www.ferc.gov), 
using the ``eLibrary'' link. Enter the docket number, excluding the 
last three digits in the docket number field, to access the document. 
For assistance, contact FERC at [email protected] or call toll 
free, (886) 208-3676 or TTY (202) 502-8659.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.
    For public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, contact the Office 
of Public Participation at (202) 502-6595 or [email protected].
    You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. The applicant must file the following on or before 5:00 p.m. 
Eastern Time on March 16, 2026: (1) copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of a waiver of water quality certification.
    o. Final amendments to the application must be filed with the 
Commission on or before 5:00 p.m. Eastern Time on February 13, 2026.
    p. The project is covered under Title 41 of the Fixing America's 
Surface Transportation Act (FAST-41). Under FAST-41, agencies are to 
publish completion dates for all federal environmental reviews and 
authorizations. This notice identifies the Commission's anticipated 
schedule for issuance of the single Environmental Assessment.

Issue Single Environmental Assessment: September 29, 2026

    A future notice will identify the Commission's anticipated schedule 
for issuance of the final license order for the project, pending 
information received on the anticipated schedule for completion of 
consultation under section 7 of the Endangered Species Act and the 
expected date of the applicant's request for water quality 
certification under section 401 of the Clean Water Act.

(Authority: 18 CFR 2.1)

    Dated: January 14, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-00979 Filed 1-16-26; 8:45 am]