NUCLEAR REGULATORY COMMISSION

[NRC-2026-0069]


Monthly Notice; Applications and Amendments to Facility Operating 
Licenses and Combined Licenses Involving No Significant Hazards 
Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Monthly notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, 
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is 
publishing this regular monthly notice. The Act requires the Commission 
to publish notice of any amendments issued, or proposed to be issued, 
and grants the Commission the authority to issue and make immediately 
effective any amendment to an operating license or combined license, as 
applicable, upon a determination by the Commission that such amendment 
involves no significant hazards consideration (NSHC), notwithstanding 
the pendency before the Commission of a request for a hearing from any 
person.

DATES: Comments must be filed by February 19, 2026. A request for a 
hearing or petitions for leave to intervene must be filed by March 23, 
2026. This monthly notice includes all amendments issued, or proposed 
to be issued, from December 5, 2025, to December 31, 2025. The last 
monthly notice was published on December 23, 2025.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
     Federal rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-0069. Address 
questions about Docket IDs in Regulations.gov to Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual(s) listed in the For Further 
Information Contact section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Susan Lent, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-1365; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-0069, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-0069.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to [email protected]. For the convenience of the reader, 
instructions about obtaining materials referenced in this document are 
provided in the ``Availability of Documents'' section.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2026-0069, facility

[[Page 2376]]

name, unit number(s), docket number(s), application date, and subject, 
in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses and Proposed No Significant 
Hazards Consideration Determination

    For the facility-specific amendment requests shown in this notice, 
the Commission finds that the licensees' analyses provided, consistent 
with section 50.91 of title 10 of the Code of Federal Regulations (10 
CFR) ``Notice for public comment; State consultation,'' are sufficient 
to support the proposed determinations that these amendment requests 
involve NSHC. Under the Commission's regulations in 10 CFR 50.92, 
operation of the facilities in accordance with the proposed amendments 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of the 30-day comment period 
if circumstances change during the 30-day comment period such that 
failure to act in a timely way would result, for example in derating or 
shutdown of the facility. If the Commission takes action on any of 
these amendments prior to the expiration of either the comment period 
or the notice period, it will publish in the Federal Register a notice 
of issuance. If the Commission makes a final NSHC determination for any 
of these amendments, any hearing will take place after issuance. The 
Commission expects that the need to take action on any amendment before 
60 days have elapsed will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. If a petition is filed, the Commission or 
a presiding officer will rule on the petition and, if appropriate, a 
notice of a hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the amendment 
request involves no significant hazards consideration, the Commission 
may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
amendment request involves a significant hazards consideration, then 
any hearing held would take place before the issuance of the amendment 
unless the Commission finds an imminent danger to the health or safety 
of the public, in which case it will issue an appropriate order or rule 
under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or agency thereof may participate as a non-party under 10 
CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and on the NRC's public website 
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(https://www.nrc.gov/site-help/e-submittals.html).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant

[[Page 2377]]

will be submitting a petition or other adjudicatory document (even in 
instances in which the participant, or its counsel or representative, 
already holds an NRC-issued digital ID certificate). Based upon this 
information, the Secretary will establish an electronic docket for the 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (https://www.nrc.gov/site-help/e-submittals.html), by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless otherwise excluded pursuant to an order of 
the presiding officer. If you do not have an NRC-issued digital ID 
certificate as previously described, click ``cancel'' when the link 
requests certificates and you will be automatically directed to the 
NRC's electronic hearing docket where you will be able to access any 
publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information 
such as social security numbers, home addresses, or personal phone 
numbers in their filings unless an NRC regulation or other law requires 
submission of such information. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants 
should not include copyrighted materials in their submission.
    The following table provides the nuclear power plant names, docket 
numbers, dates of application, ADAMS accession numbers, and locations 
in the application of the licensees' proposed NSHC determination. For 
further details with respect to these license amendment applications, 
see the applications for amendment, publicly available portions of 
which are available for public inspection in ADAMS. For additional 
direction on accessing information related to this document, see the 
``Obtaining Information and Submitting Comments'' section of this 
document.
    The following table provides the plant name, docket number, date of 
application, ADAMS accession number, and location in the application of 
the licensees' proposed NSHC determinations. For further details with 
respect to these license amendment applications, see the applications 
for amendment, which are available for public inspection in ADAMS. For 
additional direction on accessing information related to this document, 
see the ``Obtaining Information and Submitting Comments'' section of 
this document.

                       License Amendment Requests
------------------------------------------------------------------------
 
------------------------------------------------------------------------
   Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power
                    Plant, Unit 2; Calvert County, MD
------------------------------------------------------------------------
Docket No....................  50-318.
Application date.............  October 30, 2025.
ADAMS Accession No...........  ML25303A324.
Location in Application of     Pages 13-15 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendment is a one-time
 Amendment.                     extension to the Technical Specification
                                3.8.3, ``Diesel Fuel Oil, Condition C
                                Completion Time for Fuel Oil Storage
                                Tank 21,'' to allow the Fuel Oil Storage
                                Tank 21 to be out of service for a
                                required Maryland state inspection
                                during the 2027 Unit 2 Refueling Outage
                                for up to 14 days.
Proposed Determination.......  NSHC.
Name of Attorney for           Jason Zorn, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                101 Constitution Ave. NW, Suite 400
                                East, Washington, DC 20001.
NRC Project Manager,           Sam Bina, 301-415-3425.
 Telephone Number.
------------------------------------------------------------------------
   Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power
                Plant, Units 1 and 2; Calvert County, MD
------------------------------------------------------------------------
Docket Nos...................  50-317, 50-318.
Application date.............  December 18, 2025.
ADAMS Accession No...........  ML25352A315.
Location in Application of     Pages 9-10 of Attachment 1.
 NSHC.

[[Page 2378]]

 
Brief Description of           The proposed license amendments would
 Amendments.                    relocate the reactor protective system
                                loss of load function from the technical
                                specifications to the technical
                                requirements manual.
Proposed Determination.......  NSHC.
Name of Attorney for           Jason Zorn, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                101 Constitution Ave. NW, Suite 400
                                East, Washington, DC 20001.
NRC Project Manager,           Sam Bina, 301-415-3425.
 Telephone Number.
------------------------------------------------------------------------
 Constellation Energy Generation, LLC; Limerick Generating Station, Unit
                        1; Montgomery County, PA
------------------------------------------------------------------------
Docket No....................  50-352.
Application date.............  October 9, 2025.
ADAMS Accession No...........  ML25282A072.
Location in Application of     Pages 20-22 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendment would revise the
 Amendment.                     technical specifications to allow a one-
                                time exception to local leakage rate
                                testing for certain containment
                                isolation valves and an administrative
                                formatting change.
Proposed Determination.......  NSHC.
Name of Attorney for           Jason Zorn, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                101 Constitution Ave. NW, Suite 400
                                East, Washington, DC 20001.
NRC Project Manager,           Audrey Klett, 301-415-0489.
 Telephone Number.
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
                      No. 2; New London County, CT
------------------------------------------------------------------------
Docket No....................  50-336.
Application date.............  December 18, 2025.
ADAMS Accession No...........  ML25353A569.
Location in Application of     Pages 2-4 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendment would adopt
 Amendment.                     Technical Specifications Task Force
                                (TSTF) Traveler 601, ``Extend Shield
                                Building Completion Time After
                                Refueling,'' into the MPS2 technical
                                specifications (TS). TSTF-601 revises
                                the shield building TS to add a new
                                Action that is applicable prior to
                                criticality following a refueling
                                outage. The licensee requests that the
                                amendment be reviewed under the
                                Consolidated Line Item Improvement
                                Process.
Proposed Determination.......  NSHC.
Name of Attorney for           W.S. Blair, Senior Counsel, Dominion
 Licensee, Mailing Address.     Energy Services, Inc., 120 Tredegar St.,
                                RS-2, Richmond, VA 23219.
NRC Project Manager,           Theo Edwards, 301-415-1721.
 Telephone Number.
------------------------------------------------------------------------
 Dominion Energy South Carolina, Inc.; Virgil C. Summer Nuclear Station,
                      Unit 1, Fairfield County, SC
------------------------------------------------------------------------
Docket No....................  50-395.
Application date.............  November 9, 2025.
ADAMS Accession No...........  ML25317A687.
Location in Application of     Pages 8-9 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendment would replace the
 Amendment.                     10 percent Wide Range requirement with a
                                25 percent Narrow Range requirement, as
                                described in the application.
Proposed Determination.......  NSHC.
Name of Attorney for           W.S. Blair, Senior Counsel, Dominion
 Licensee, Mailing Address.     Energy Services, Inc., 120 Tredegar St.,
                                RS-2, Richmond, VA 23219.
NRC Project Manager,           G. Ed Miller, 301-415-2481.
 Telephone Number.
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
                               County, SC
------------------------------------------------------------------------
Docket Nos...................  50-413, 50-414.
Application date.............  September 30, 2025.
ADAMS Accession No...........  ML25273A166.
Location in Application of     Pages 26-28 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would modify the
 Amendments.                    licensing basis, by the addition of a
                                License Condition, to allow for the
                                implementation of the provisions of 10
                                CFR 50.69, ``Risk-informed
                                Categorization and Treatment of
                                Structures, Systems and Components for
                                Nuclear Power Reactors.''
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 525 S
                                Tryon Street, Charlotte, NC 28202.
NRC Project Manager,           Shawn Williams, 301-415-1009.
 Telephone Number.
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
                               County, SC
------------------------------------------------------------------------
Docket Nos...................  50-413, 50-414.
Application date.............  September 30, 2025.
ADAMS Accession No...........  ML25273A162.
Location in Application of     Pages 7-8 of the Enclosure.
 NSHC.

[[Page 2379]]

 
Brief Description of           The proposed amendments would modify
 Amendments.                    Technical Specification requirements to
                                permit the use of Risk-Informed
                                Completion Times in accordance with
                                Technical Specifications Task Force
                                (TSTF) Traveler TSTF-505, Revision 2,
                                ``Provide Risk-Informed Extended
                                Completion Times--RITSTF Initiative
                                4b.'' The proposed amendments also
                                incorporates NRC-approved traveler TSTF-
                                591, Revision 0, ``Revise the Risk
                                Informed Completion Time (RICT)
                                Program.''
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 525 S
                                Tryon Street, Charlotte, NC 28202.
NRC Project Manager,           Shawn Williams, 301-415-1009.
 Telephone Number.
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1
   and 2; Mecklenburg County, NC; Duke Energy Progress, LLC; Brunswick
 Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy
     Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No. 2;
                          Darlington County, SC
------------------------------------------------------------------------
Docket Nos...................  50-325, 50-324, 50-413, 50-414, 50-369,
                                50-370, 50-261.
Application date.............  October 9, 2025.
ADAMS Accession No...........  ML25282A076.
Location in Application of     Pages E-23-E-24 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would revise
 Amendments.                    Technical Specification (TS) 1.1, ``Use
                                and Application Definitions,'' for
                                Brunswick Steam Electric Plant Units 1
                                and 2 (BSEP); Catawba Nuclear Station
                                Units 1 and 2 (CNS); McGuire Nuclear
                                Station Units 1 and 2 (MNS); and H. B.
                                Robinson Steam Electric Plant Unit No. 2
                                (HBRSEP). The amendments would add new
                                TS 5.5.16 for BSEP, TS 5.5.18 for CNS,
                                TS 5.5.19 for MNS, and TS 5.5.19 for
                                HBRSEP, titled ``Online Monitoring
                                Program.'' Duke Energy proposes to use
                                online monitoring (OLM) methodology as
                                the technical basis for moving from time-
                                based calibration surveillance
                                frequencies to condition-based
                                frequencies informed by OLM results.
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 525 S
                                Tryon Street, Charlotte, NC 28202.
NRC Project Manager,           Shawn Williams, 301-415-1009.
 Telephone Number.
------------------------------------------------------------------------
    Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No....................  50-397.
Application date.............  September 2, 2025.
ADAMS Accession No...........  ML25245A260.
Location in Application of     Pages 1-3 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendment would adopt
 Amendment.                     Technical Specifications Task Force
                                (TSTF) Traveler TSTF-599, ``Eliminate
                                Periodic Surveillance Test of
                                Simultaneous Start of Redundant Diesel
                                Generators,'' which is an approved
                                change to the Standard Technical
                                Specifications, into Columbia's
                                Technical Specifications. The proposed
                                change would eliminate the periodic
                                surveillance requirement to verify that
                                all required diesel generators achieve
                                rated frequency and voltage within the
                                specified time period when started
                                simultaneously.
Proposed Determination.......  NSHC.
Name of Attorney for           Ryan Lukson, Assistant General Counsel,
 Licensee, Mailing Address.     Energy Northwest, MD 1020, P.O. Box 968,
                                Richland, WA 99352.
NRC Project Manager,           Mahesh Chawla, 301-415-8371.
 Telephone Number.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No....................  50-382.
Application date.............  August 26, 2025.
ADAMS Accession No...........  ML25238A051.
Location in Application of     Pages 6-7 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendment requests approval
 Amendment.                     to revise the Waterford Steam Electric
                                Station, Unit 3, Technical Specification
                                Section 5.0, ``Design Features,''
                                consistent with the Design Features
                                section of NUREG-1432, Revision 5,
                                ``Standard Technical Specification,
                                Combustion Engineering Plants.''
Proposed Determination.......  NSHC.
Name of Attorney for           Susan Raimo, Associate General Counsel--
 Licensee, Mailing Address.     Nuclear, 101 Constitution Avenue NW,
                                Washington, DC 20001.
NRC Project Manager,           Jason Drake, 301-415-8378.
 Telephone Number.
------------------------------------------------------------------------
    Florida Power & Light Company; St. Lucie Plant, Unit 1; St. Lucie
                               County, FL
------------------------------------------------------------------------
Docket No....................  50-335.
Application date.............  September 19, 2025.
ADAMS Accession No...........  ML25262A024.
Location in Application of     Pages 9-10 of Enclosure 1.
 NSHC.

[[Page 2380]]

 
Brief Description of           The proposed license amendment would
 Amendment.                     revise St. Lucie Plant, Unit No. 1,
                                Technical Specification 5.6.3, ``Core
                                Operating Limits Report,'' by updating
                                the listing of NRC-approved analytical
                                methods used to determine the core
                                operating limits. Specifically, changes
                                to the fuel thermal-mechanics, core
                                thermal-hydraulics, emergency core
                                cooling, nuclear design, and select
                                design basis event analyses are proposed
                                using NRC approved advanced codes and
                                methods in support of a St. Lucie Plant,
                                Unit No. 1, transition to 24-month fuel
                                cycles.
Proposed Determination.......  NSHC.
Name of Attorney for           James Petro, Managing Attorney--Nuclear,
 Licensee, Mailing Address.     Florida Power and Light Company 700
                                Universe Boulevard, MS LAW/JB, Juno
                                Beach, FL 33408-0420.
NRC Project Manager,           Maria Elena Herrera Torres, 301-415-8208.
 Telephone Number.
------------------------------------------------------------------------
 Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant,
                    Units 1 and 2; Appling County, GA
------------------------------------------------------------------------
Docket Nos...................  50-321, 50-366.
Application date.............  December 5, 2025.
ADAMS Accession No...........  ML25339A156.
Location in Application of     Pages E-2 and E-3 of the enclosure.
 NSHC.
Brief Description of           The proposed amendments request adoption
 Amendments.                    of Technical Specification Task Force
                                (TSTF)-576, Revision 3, ``Revise Safety/
                                Relief Valve Requirements.'' The
                                proposed change revises the Safety/
                                Relief Valve Technical Specification to
                                align the overpressure protection
                                requirements with the safety limits and
                                the regulations.
Proposed Determination.......  NSHC.
Name of Attorney for           Millicent Ronnlund, Vice President and
 Licensee, Mailing Address.     General Counsel, Southern Nuclear
                                Operating Co., Inc., P.O. Box 1295,
                                Birmingham, AL 35201-1295.
NRC Project Manager,           John Lamb, 301-415-3100.
 Telephone Number.
------------------------------------------------------------------------
 Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Unit
                   Nos. 1 and 2; Somervell County, TX
------------------------------------------------------------------------
Docket Nos...................  50-445, 50-446.
Application date.............  July 24, 2025.
ADAMS Accession No...........  ML25209A150.
Location in Application of     Pages 3-4 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would revise
 Amendments.                    technical specifications to adopt
                                Technical Specifications Task Force
                                (TSTF) Traveler TSTF-432, ``Change in
                                Technical Specifications End States
                                (WCAP-16294).''
Proposed Determination.......  NSHC.
Name of Attorney for           Carey Fleming, Senior Counsel, Pinnacle
 Licensee, Mailing Address.     West Capital Corporation, 500 N 5th
                                Street, MS 8695, Phoenix, AZ 85004.
NRC Project Manager,           William Orders, 301-415-3329.
 Telephone Number.
------------------------------------------------------------------------

III. Notice of Issuance of Amendments to Facility Operating Licenses 
and Combined Licenses

    During the period since publication of the last monthly notice, the 
Commission has issued the following amendments. The Commission has 
determined for each of these amendments that the application complies 
with the standards and requirements of the Atomic Energy Act of 1954, 
as amended (the Act), and the Commission's rules and regulations. The 
Commission has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed NSHC 
determination, and opportunity for a hearing in connection with these 
actions, were published in the Federal Register as indicated in the 
safety evaluation for each amendment.
    Unless otherwise indicated, the Commission has determined that 
these amendments satisfy the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for these amendments. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.22(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to each action, see the amendment 
and associated documents such as the Commission's letter and safety 
evaluation, which may be obtained using the ADAMS accession numbers 
indicated in the following table. The safety evaluation will provide 
the ADAMS accession numbers for the application for amendment and the 
Federal Register citation for any environmental assessment. All of 
these items can be accessed as described in the ``Obtaining Information 
and Submitting Comments'' section of this document.

                       License Amendment Issuances
------------------------------------------------------------------------
 
------------------------------------------------------------------------
  Constellation Energy Generation, LLC; Dresden Nuclear Power Station,
                        Unit 1, Grundy County, IL
------------------------------------------------------------------------
Docket No....................  50-010.
Amendment Date...............  December 17, 2025.
ADAMS Accession No...........  ML25343A122.
Amendment No.................  51.

[[Page 2381]]

 
Brief Description of           The amendment modified Dresden Nuclear
 Amendment.                     Power Station (Dresden), Unit 1
                                Technical Specification (TS) 5.1.A,
                                ``Site and Exclusion Area'' to align
                                with Dresden, Units 2 and 3, TS 4.1.1,
                                ``Site and Exclusion Area Boundaries,''
                                and removes the specific acreage value.
                                Removing the specific acreage value does
                                not change the site area boundary or
                                exclusion area.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Constellation Energy Generation, LLC; Zion Nuclear Power Station, Units
                        1 and 2; Lake County, IL
------------------------------------------------------------------------
Docket Nos...................  50-295, 50-304, 72-1037.
Amendment Date...............  December 2, 2025.
ADAMS Accession No...........  ML25254A166 (Package).
Amendment Nos................  193 (Unit 1), and 180 (Unit 2).
Brief Description of           The amendments deleted license conditions
 Amendments.                    relating to the License Termination Plan
                                and deleted license conditions relating
                                to the terms and conditions of
                                decommissioning trust agreements, and,
                                instead, conform to the 10 CFR 50.75(h)
                                regulations.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
                      No. 3; New London County, CT
------------------------------------------------------------------------
Docket No....................  50-423.
Amendment Date...............  December 16, 2025.
ADAMS Accession No...........  ML25339A001.
Amendment No.................  293.
Brief Description of           The amendment adopted Technical
 Amendment.                     Specifications (TS) Task Force (TSTF)
                                Traveler TSTF-577, Revision 1, ``Revised
                                Frequencies for Steam Generator Tube
                                Inspections.'' The amendment revised the
                                TSs related to steam generator tube
                                inspections and reporting requirements
                                in TS section 6.8.4.g, ``Steam Generator
                                (SG) Program,'' and TS section 6.9.1.7,
                                ``Steam Generator Tube Inspection
                                Report,'' respectively, based on
                                operating history.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Dominion Energy South Carolina, Inc.; Virgil C. Summer Nuclear Station,
                      Unit 1, Fairfield County, SC
------------------------------------------------------------------------
Docket No....................  50-395.
Amendment Date...............  December 30, 2025.
ADAMS Accession No...........  ML25342A206.
Amendment No.................  228.
Brief Description of           The amendment modified Technical
 Amendment.                     Specification 6.8.4.g, ``Containment
                                Leakage Rate Testing Program,'' to
                                replace the reference to Nuclear Energy
                                Institute (NEI) Technical Report 94-01,
                                Revision 2-A, with NEI Technical Report
                                94-01, Revision 3-A, and conditions and
                                limitations specified in NEI-94-01,
                                Revision 2-A, as described in the
                                request.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Duke Energy Florida, LLC; Crystal River Unit 3 Nuclear Generating Plant;
                            Citrus County, FL
------------------------------------------------------------------------
Docket No....................  50-302.
Amendment Date...............  December 18, 2025.
ADAMS Accession No...........  ML25241A165 (Package).
Amendment No.................  262.
Brief Description of           The amendment approved an application
 Amendment.                     submitted by Accelerated Decommissioning
                                Partners Crystal River Unit 3, LLC to
                                remove 618 acres of property, classified
                                as either radiologically non-impacted or
                                Multi-Agency Radiation Survey and Site
                                Investigation Manual Class 3. As part of
                                the request, the NRC also amended the
                                Crystal River Unit 3 Operating License
                                to reflect approval of a January 2,
                                2020, partial site release
                                (ML19339G509).
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
  Entergy Operations, Inc., System Energy Resources, Inc., Cooperative
  Energy, A Mississippi Electric Cooperative, and Entergy Mississippi,
      LLC; Grand Gulf Nuclear Station, Unit 1; Claiborne County, MS
------------------------------------------------------------------------
Docket No....................  50-416.
Amendment Date...............  December 17, 2025.
ADAMS Accession No...........  ML25324A332.
Amendment No.................  239.

[[Page 2382]]

 
Brief Description of           The amendment allowed crediting of NETCO-
 Amendment.                     SNAP-IN[supreg] neutron absorbing rack
                                inserts in the criticality safety
                                analysis (CSA) for the storage rack
                                cells in the station's spent fuel
                                storage facility. The amendment revised
                                the technical specifications (TS)
                                regarding criticality design features of
                                the spent fuel storage racks as
                                contained in TS 4.3, ``Fuel Storage,''
                                Subpart 4.3.1, ``Criticality,'' to
                                specifically identify the neutron
                                absorbing inserts, remove requirements
                                for Region II storage racks, and to
                                update the value of K-infinity used in
                                the CSA, consistent with Standard
                                Technical Specifications (STS). Lastly,
                                the amendment added a new program
                                requirement in TS 5.5, ``Programs and
                                Manuals,'' that implements a monitoring
                                program for the neutron absorbing rack
                                inserts, consistent with STS improvement
                                initiatives.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Florida Power & Light Company, et al.; St. Lucie Plant, Unit No. 2; St.
                            Lucie County, FL
------------------------------------------------------------------------
Docket No....................  50-389.
Amendment Date...............  December 12, 2025.
ADAMS Accession No...........  ML25258A158.
Amendment No.................  213.
Brief Description of           The amendment revised the St. Lucie
 Amendment.                     Plant, Unit No. 2, Technical
                                Specification 5.6.3, ``Core Operating
                                Limits Report,'' by updating the listing
                                of NRC-approved analytical methods used
                                to determine the core operating limits.
                                Specifically, changes to the fuel
                                thermal-mechanics, core thermal
                                hydraulics, emergency core cooling,
                                nuclear design, and select design-basis
                                event analyses were proposed using NRC-
                                approved advanced codes and methods in
                                support of a St. Lucie, Unit No. 2,
                                transition to 24-month fuel cycles.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant,
                  Unit Nos. 1 and 2; Appling County, GA
------------------------------------------------------------------------
Docket Nos...................  50-321, 50-366.
Amendment Date...............  December 30, 2025.
ADAMS Accession No...........  ML25350C117.
Amendment Nos................  330 and 275.
Brief Description of           The amendments revised Edwin I. Hatch
 Amendments.                    Nuclear Plant Technical Specification
                                (TS) Surveillance Requirement (SR)
                                diesel generator (DG) loading required
                                by SR 3.8.1.2 and SR 3.8.1.5.
                                Specifically, the change replaced the
                                current DG loading requirements with a
                                loading requirement of 90 to 100 percent
                                of the continuous rating for the DGs.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos...................  52-025, 52-026.
Amendment Date...............  December 30, 2025.
ADAMS Accession No...........  ML25351A015.
Amendment Nos................  210 and 208.
Brief Description of           The amendments revised the technical
 Amendments.                    specifications (TSs) to increase
                                flexibility in mode restraints. The
                                changes are similar to those described
                                in Technical Specification Task Force
                                (TSTF) 359, Revision 9, ``Increased
                                Flexibility in Mode Restraints,'' with
                                changes similar to those identified in
                                TSTF-529, Revision 4, ``Clarify Use and
                                Application Rules,'' for Limiting
                                Condition for Operation 3.0.4.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Docket Nos...................  52-025, 52-026.
Amendment Date...............  December 31, 2025.
ADAMS Accession No...........  ML25351A043.
Amendment Nos................  211 and 209.
Brief Description of           The amendments revised Technical
 Amendments.                    Specification (TS) 3.7.6, ``Main Control
                                Room Emergency Habitability System
                                (VES),'' and TS 3.3.13, ``Engineered
                                Safety Feature Actuation System (ESFAS)
                                Main Control Room Isolation, Air Supply
                                Initiation, and Electrical Load De-
                                energization.''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
                         3; Limestone County, AL
------------------------------------------------------------------------
Docket Nos...................  50-259, 50-260, 50-296.
Amendment Date...............  December 18, 2025.
ADAMS Accession No...........  ML25337A128.
Amendment Nos................  337 (Unit 1), 360 (Unit 2), and 320 (Unit
                                3).

[[Page 2383]]

 
Brief Description of           The amendments revised the Browns Ferry
 Amendments.                    Nuclear Plant, Units 1, 2, and 3,
                                technical specifications by adopting
                                Technical Specification Task Force
                                (TSTF) Traveler TSTF-423-A, Revision 1,
                                ``Technical Specifications End States,
                                NEDC-32998-A,'' to modify the end state
                                for selected Required Actions to allow
                                the units to stay in Mode 3.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
                         3; Limestone County, AL
------------------------------------------------------------------------
Docket Nos...................  50-259, 50-260, 50-296.
Amendment Date...............  December 18, 2025.
ADAMS Accession No...........  ML25335A121.
Amendment Nos................  338 (Unit 1), 361 (Unit 2) and 321 (Unit
                                3).
Brief Description of           The amendments revised Browns Ferry
 Amendments.                    Nuclear Plant, Units 1, 2, and 3,
                                Technical Specification Limiting
                                Condition for Operation (LCO) 3.0.3 by
                                adopting Technical Specification Task
                                Force (TSTF) Traveler TSTF-597-A,
                                ``Eliminate LCO 3.0.3 Mode 2
                                Requirement.''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
   Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2;
   Hamilton County, TN; Tennessee Valley Authority; Watts Bar Nuclear
                  Plant, Units 1 and 2; Rhea County, TN
------------------------------------------------------------------------
Docket Nos...................  50-327, 50-328, 50-390, 50-391.
Amendment Date...............  December 18, 2025.
ADAMS Accession No...........  ML25134A248.
Amendment Nos................  Sequoyah--374 (Unit 1) and 369 (Unit 2);
                                Watts Bar--178 (Unit 1) and 83 (Unit 2).
Brief Description of           The amendments revised Sequoyah Nuclear
 Amendments.                    Plant, Units 1 and 2, and Watts Bar
                                Nuclear Plant, Units 1 and 2, Technical
                                Specification Limiting Condition for
                                Operation 3.5.2, ``ECCS [Emergency Core
                                Cooling System]--Operating,'' Note 1, to
                                include one residual heat removal pump
                                flow path to perform pressure isolation
                                valve testing.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
   Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2;
   Hamilton County, TN; Tennessee Valley Authority; Watts Bar Nuclear
                  Plant, Units 1 and 2; Rhea County, TN
------------------------------------------------------------------------
Docket Nos...................  50-327, 50-328, 50-390, 50-391.
Amendment Date...............  December 9, 2025.
ADAMS Accession No...........  ML25328A120.
Amendment Nos................  Sequoyah--373 (Unit 1) and 368 (Unit 2);
                                Watts Bar--177 (Unit 1) and 82 (Unit 2).
Brief Description of           The amendments revised Sequoyah Nuclear
 Amendments.                    Plant, Units 1 and 2, (Sequoyah) and
                                Watts Bar Nuclear Plant, Units 1 and 2,
                                (Watts Bar) Technical Specification (TS)
                                1.1, ``Use and Application
                                Definitions,'' and added new Sequoyah TS
                                5.5.19 and new Watts Bar TS 5.7.2.24,
                                ``Online Monitoring Program,'' to permit
                                the use of an online monitoring
                                methodology (OLM) as the technical basis
                                to switch from time-based surveillance
                                frequency for channel calibrations to a
                                condition-based calibration frequency
                                based on OLM results.
Public Comments Received as    Yes.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
  Vistra Operations Company LLC; Perry Nuclear Power Plant, Unit No. 1;
                             Lake County, OH
------------------------------------------------------------------------
Docket No....................  50-440.
Amendment Date...............  December 19, 2025.
ADAMS Accession No...........  ML25343A180.
Amendment No.................  205.
Brief Description of           The amendment revised the technical
 Amendment.                     specifications in accordance with
                                Technical Specifications Task Force
                                (TSTF) Traveler TSTF-597, Revision 0,
                                ``Eliminate LCO [Limiting Conditions for
                                Operations] 3.0.3 Mode 2 Requirement.''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station,
                        Unit 1; Coffey County, KS
------------------------------------------------------------------------
Docket No....................  50-482.
Amendment Date...............  December 10, 2025.
ADAMS Accession No...........  ML25317A783.
Amendment No.................  245.
Brief Description of           The amendment approved a deviation from
 Amendment.                     the fire protection program requirements
                                to allow the use of portable lighting.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------



[[Page 2384]]

    Dated: January 8, 2026.

    For the Nuclear Regulatory Commission.
Hip[oacute]lito Gonz[aacute]lez,
Acting Deputy Director, Division of Operating Reactor Licensing, Office 
of Nuclear Reactor Regulation.
[FR Doc. 2026-00923 Filed 1-16-26; 8:45 am]