NUCLEAR REGULATORY COMMISSION
[Docket Nos.; 50-263, 50-275, and 50-323; NRC-2025-1897]
Issuance of Multiple Exemptions
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a
single notice to announce the issuance of three exemptions in response
to requests as detailed in the available documents.
DATES: This notice contains three exemptions that the NRC granted
during the period from July 1, 2025, to September 30, 2025, in response
to requests submitted by two licensees.
ADDRESSES: Please refer to Docket ID NRC-2025-1897 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-1897. Address
questions about Docket IDs in Regulations.gov to Bridget Curran;
telephone: 301-415-1003; email: [email protected]. For technical
questions, contact the individual listed in the ``For Further
Information Contact'' section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.''
For problems with ADAMS, please contact
[[Page 57101]]
the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209,
at 301-415-4737, or by email at [email protected]. For the
convenience of the reader, instructions about obtaining materials
referenced in this document are provided in the ``Availability of
Documents'' section.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Robert Kuntz, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-3733; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Introduction
During the period from July 1, 2025, through September 30, 2025,
the NRC granted the included three exemptions in response to requests
submitted by the following licensees: Pacific Gas and Electric Company
and Northern States Power Company.
The details of the exemptions that have been issued are provided in
the available documents.
II. Availability of Documents
The tables in this notice provide transparency regarding the number
and type of exemptions the NRC has issued and provide the licensee
name, facility name, docket number, document description, document
date, and ADAMS accession number for each exemption issued. Additional
details on each exemption issued, including the exemption request
submitted by the respective licensee and the NRC's decision, are
provided in each exemption approval listed in the following tables. For
additional directions on accessing information in ADAMS, see the
ADDRESSES section of this document.
----------------------------------------------------------------------------------------------------------------
Document description ADAMS Accession No. Document date
----------------------------------------------------------------------------------------------------------------
Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Docket Nos. 50-275 and 50-
323
----------------------------------------------------------------------------------------------------------------
Diablo Canyon Nuclear Power Plant, ML25183A195................................... July 21, 2025.
Units 1 and 2--Exemption from
Requirements of 10 CFR
73.55(e)(9)(vi)(A) for Early
Warning System.
Diablo Canyon Nuclear Power Plant, ML25171A144 (ADAMS package)................... August 13, 2025.
Units 1 and 2--Exemption from 10
CFR 50.46 to Support Use of
Optimized Zirlo\TM\ for Improved
Fuel Rod Cladding Performance.
----------------------------------------------------------------------------------------------------------------
Northern States Power Company; Monticello Nuclear Generating Plant, Unit 1; Docket No. 50-253
----------------------------------------------------------------------------------------------------------------
Monticello Nuclear Generating ML25231A222................................... September 4, 2025.
Plant, Unit 1--Exemption from
Specific Requirements of 10 CFR
50.55a In Support of Adoption of
Code Case N-921.
----------------------------------------------------------------------------------------------------------------
Dated: December 5, 2025.
For the Nuclear Regulatory Commission.
Robert Kuntz,
Senior Project Manager, Plant Licensing Branch III, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2025-22318 Filed 12-8-25; 8:45 am]