[Federal Register Volume 90, Number 178 (Wednesday, September 17, 2025)]
[Rules and Regulations]
[Pages 44772-44782]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-17948]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 751

[EPA-HQ-OPPT-2020-0642; FRL-8317.2-01-OCSPP]
RIN 2070-AL32


Trichloroethylene; Regulation Under the Toxic Substances Control 
Act (TSCA); Compliance Date Extension

AGENCY: Environmental Protection Agency (EPA).

ACTION: Interim final rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA or Agency) is taking 
interim final action on the Regulation of Trichloroethylene (TCE) under 
the Toxic Substances Control Act (TSCA) to revise certain compliance 
deadlines finalized in 2024. Specifically, EPA is amending the 
prohibition compliance date for the use of TCE as a processing aid in 
the manufacture of nuclear fuel, with corresponding changes to the 
compliance dates for the manufacturing, processing and distribution in 
commerce of TCE to support such use, to a prohibition on September 15, 
2028. EPA is also amending the prohibition compliance date for the 
disposal of TCE to wastewater by processors of TCE and processors and 
industrial and commercial users of TCE as a processing aid, to begin on 
December 18, 2026. EPA is also amending the compliance deadline for 
downstream notification, and the text required to be present in Safety 
Data Sheets, to accurately reflect the new prohibition compliance 
deadline for TCE used as a processing aid in the manufacture of nuclear 
fuel. EPA is amending this compliance deadline to allow for 90 days 
after the publication of the final rule for manufacturers, processors, 
and distributors in commerce of TCE to make such a change. These 
revisions are necessary to address new information presented to EPA 
about inadvertent oversights in the original rulemaking and serious 
concerns that the facilities at issue will be unable to comply with the 
relevant requirements by the existing deadlines. EPA is requesting 
comments on all aspects of this interim final rule and will consider 
all comments received in determining whether amendments to this rule 
are appropriate after the conclusion of the comment period.

DATES: This interim final rule is effective on September 15, 2025. 
Comments must be received on or before October 17, 2025.

[[Page 44773]]


ADDRESSES: Submit your comments, identified by docket identification 
(ID) number EPA-HQ-OPPT-2020-0642 using the Federal eRulemaking Portal 
at https://www.regulations.gov. Follow the online instructions for 
submitting comments. Do not submit electronically any information you 
consider to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute. Additional 
instructions on commenting or visiting the docket, along with more 
information about dockets generally, is available at https://www.epa.gov/dockets/.

FOR FURTHER INFORMATION CONTACT: 
    For technical information contact: Gabriela Rossner, Existing 
Chemicals Risk Management Division, Office of Pollution Prevention and 
Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460-0001; telephone number: 202-564-2426; email 
address: [email protected].
    For general information contact: The TSCA Assistance Information 
Service Hotline, Goodwill of the Finger Lakes, 422 South Clinton Ave., 
Rochester, NY 14620; telephone number: (800) 471-7127 or (202) 554-
1404; email address: [email protected].

SUPPLEMENTARY INFORMATION:

I. Executive Summary

A. Does this action apply to me?

    This action may apply to you if you manufacture, process, 
distribute in commerce, or are an industrial and commercial user of TCE 
used as a processing aid in the manufacture of nuclear fuel. 
Additionally, you may be potentially affected by this rule if you 
process TCE as a reactant/intermediate, process TCE for use as a 
processing aid in certain industries, or use TCE as a processing aid in 
such industries. The following list of North American Industrial 
Classification System (NAICS) codes is not intended to be exhaustive 
but rather provides a guide to help readers determine whether this 
document applies to them. Potentially affected entities may include:

 211120--Crude Petroleum Extraction
 221118--Other Electric Power Generation
 325180--Other Basic Inorganic Chemical Manufacturing
 325193--Ethyl Alcohol Manufacturing
 325199--All Other Basic Organic Chemical Manufacturing
 325211--Plastics Material and Resin Manufacturing
 325998--All Other Miscellaneous Chemical Product and 
Preparation Manufacturing
 332313--Plate Work Manufacturing
 332410--Power Boiler and Heat Exchanger Manufacturing
 334513--Instruments and Related Products Manufacturing for 
Measuring, Displaying, and Controlling Industrial Process Variables
 335312--Motor and Generator Manufacturing
 424690--Other Chemical and Allied Products Merchant 
Wholesalers
 424720--Petroleum and Petroleum Products Merchant Wholesalers 
(except Bulk Stations and Terminals)
 541330--Engineering Services

    This list details the types of entities that EPA is aware could 
potentially be impacted by this action. Other types of entities not 
listed could also be impacted. To determine whether your entity is 
impacted by this action, you should carefully examine the applicability 
criteria found in 40 CFR 751.305 and 705.313. If you have questions 
regarding the applicability of this action to a particular entity, 
consult the person listed in the FOR FURTHER INFORMATION CONTACT 
section.

B. What is the Agency's authority for taking this action?

    Under TSCA section 6(a) (15 U.S.C. 2605(a)), if EPA determines 
through a TSCA section 6(b) risk evaluation that a chemical substance 
presents an unreasonable risk of injury to health or the environment 
under its conditions of use, EPA must by rule apply one or more 
requirements listed in TSCA section 6(a) to the extent necessary so 
that the use or uses of the chemical substance or mixture no longer 
presents such risk.
    Unless provided otherwise by law, an agency may change existing 
positions (e.g., reconsider, revise, or rescind prior actions) so long 
as it acknowledges the change in position, provides a reasoned 
explanation for the change, and takes any serious reliance interests 
into account. See, e.g., FDA v. Wages & White Lion Invs., L.L.C., 145 
S. Ct. 898, 917 (2025); Encino Motorcars v. Navarro, 579 U.S. 211, 221 
(2016); FCC v. Fox Television Stations, Inc., 556 U.S. 502, 515 (2009). 
Here, and as explained further in Unit II.C, based on new information 
submitted by regulated entities, the Agency is amending compliance 
dates to address recently-received information that the original 
compliance dates for (1) a subset of industrial and commercial use of 
TCE previously categorized as miscellaneous and now specified as the 
manufacture of nuclear fuel and (2) the disposal of TCE to wastewater 
by processors of TCE and processors and industrial and commercial users 
of TCE as a processing aid are not practicable and do not provide 
adequate transition time. EPA does not believe that the Agency took a 
contrary position in the original rule with respect to these issues 
because the information and concerns discussed here were not before the 
Agency at the time and the Agency did not intend to create the 
compliance concerns addressed in this action. Further, EPA does not 
believe there are significant reliance interests in the current 
deadline with respect to the narrow issues addressed in this action. 
Nevertheless, EPA seeks comments on any potential reliance interests 
and how those reliance interests should be taken into account when 
assessing whether to revise this action after the close of the comment 
period.
    In addition, under the Administrative Procedure Act (APA) at 5 
U.S.C. 553(b)(B), an agency may issue a final rule without providing 
notice and an opportunity for public comment if it for good cause finds 
that notice and public procedures are ``impracticable, unnecessary, or 
contrary to the public interest.'' Further, under the APA at 5 U.S.C. 
553(d)(1), an agency may make a rule effective immediately if it 
``grants or recognizes an exemption or relieves a restriction,'' which 
includes this action as it relieves restrictions by extending several 
of the 2024 rule's compliance deadlines.
    As explained further in Unit III, EPA finds good cause to make the 
rule immediately effective without prior notice and comment because new 
information has revealed that EPA inadvertently established 
impracticable compliance deadlines for an application of TCE in the 
nuclear sector not specifically considered in the rulemaking and, 
separately, unintentionally established a reasonable transition period 
under TSCA section 6(d) for certain processing conditions of use 
without establishing a similar reasonable transition period for 
wastewater activities necessitated by such processing.

C. What action is the Agency taking?

    EPA is amending the 2024 Regulation of Trichloroethylene (TCE) 
under TSCA codified in subpart D of 40 CFR 751, referred to hereafter 
as the 2024 final rule (Ref. 1), in the following ways. First, EPA is 
amending the prohibition compliance date for the use of TCE as a 
processing aid in the manufacture of nuclear fuel, with corresponding 
changes to supporting compliance dates, to begin on September 15, 2028. 
Second, EPA is amending the prohibition compliance date for the 
disposal of TCE

[[Page 44774]]

to wastewater by processors of TCE as a reactant/intermediate and 
processors for and industrial and commercial users of TCE as a 
processing aid for: process solvent used in battery manufacture; 
process solvent used in polymer fiber spinning, fluoroelastomer 
manufacture and Alcantara manufacture; extraction solvent used in 
caprolactam manufacture; precipitant used in beta-cyclodextrin 
manufacture (hereinafter referred to as ``chemical processors''), to 
begin on December 18, 2026. Third, EPA is amending the compliance date 
and required safety data sheet text for downstream notification, for an 
updated compliance date on December 16, 2025.
1. TCE as a Processing Aid in the Manufacture of Nuclear Fuel
    EPA is amending the prohibition compliance date for the industrial 
and commercial use of TCE in other miscellaneous industrial and 
commercial uses, specifically for the use of TCE as a processing aid in 
the manufacture of nuclear fuel. EPA is extending the prohibition 
compliance date by three years, to September 15, 2028, for the 
industrial and commercial use of TCE as a processing aid in the 
manufacture of nuclear fuel, and the manufacturing, processing, and 
distribution of commerce of TCE to support such use (as opposed to the 
2024 final rule's compliance date of September 15, 2025). These changes 
respond to new information received after promulgation of the 2024 
final rule about a condition of use with critical national security and 
energy implications that EPA did not consider during the rulemaking 
and, as a result, was not reflected in EPA's analysis of the 
appropriate prohibition compliance date (currently September 15, 2025).
2. Disposal of TCE to Wastewater by Chemical Processors
    EPA is also amending the compliance deadline from September 15, 
2025, to December 18, 2026, for the prohibition on disposal of TCE to 
wastewater for processors of TCE as a reactant/intermediate and 
processors for and industrial and commercial users of TCE as a 
processing aid for certain industrial sectors. This action aligns the 
disposal prohibition with the December 18, 2026, prohibition on such 
uses in the 2024 final rule. This change responds to serious concerns 
raised to EPA that processing conditions of use subject to a time-
limited exemption from the prohibition compliance date (currently 
September 15, 2025) also involve disposal of TCE to wastewater that 
inadvertently was not similarly subject to a time-limited exemption.
3. Downstream Notification
    As a result of the new prohibition compliance date for the 
industrial and commercial use of TCE as a processing aid in the 
manufacture of nuclear fuel, EPA is amending the downstream 
notification requirements to allow for 90 days from the publication of 
this rule in the Federal Register for manufacturers and processors of 
TCE to amend their Safety Data Sheets to reflect this new use's 
prohibition compliance deadline.

D. Why is the Agency taking this action?

    EPA received petitions on May 29 and June 19, 2025, that provided 
new information about regulated entities with uses that would be 
prohibited by the 2024 final rule after September 15, 2025, 
jeopardizing activities of significant importance. As discussed further 
in Unit II.C, EPA has considered the information and is taking this 
action to provide urgent regulatory relief for these regulated 
entities.

E. What are the incremental economic impacts?

1. TCE as a Processing Aid in the Manufacture of Nuclear Fuel
    EPA identified five companies that have capabilities to produce 
Tri-structural Isotropic (TRISO) particle fuel, with only a single 
primary producing company capable of production at scale. That company 
uses TCE as a forming fluid. One company may also be using TCE to 
produce TRISO fuel, although they are not currently licensed by NRC and 
are not producing TRISO fuel at production scale but would need to 
transition to a TCE alternative to comply with the 2024 final rule. EPA 
presumes that the transition costs for this company would be smaller 
than the costs for the at scale producer because their production is 
smaller capacity.
    The primary producing company estimated that the costs of executing 
the testing of the manufacturing ability of alternatives and fuel 
quality analysis studies would be approximately $4 million (Ref. 4). 
The company notes that there would be additional costs that it was 
unable to quantify such as equipment testing, operator training, 
additional irradiation testing, and fuel certification (Ref. 4). The 
three-year delay in prohibition of TCE for this use would delay the 
occurrence of these transition costs. The social costs avoided under 
the interim final rule would be those associated with the critical 
infrastructure and national security impacts that would occur without 
it. EPA is unable to address the cost savings from avoiding the delays 
in the production of TRISO fuel that would occur without the interim 
final rule.
    EPA does not have exposure monitoring data specific to this use and 
therefore, EPA does not have information to quantify exposure 
reductions that may occur if facilities continue operations past 
September 15, 2025. Under the December 2024 rule, the use of TCE by 
these facilities would be prohibited after September 15, 2025, so 
exposures to workers would cease at that time. This interim final rule 
allows operations using TCE to continue additional 3 years allowing for 
workers' continued exposure to TCE and reducing potential health 
benefits to those workers. EPA does not have exposure monitoring data 
specific to this use and therefore, can not quantify that exposure and 
potential loss of benefits.
2. Disposal of TCE to Wastewater by Chemical Processors
    EPA identified 24 facilities that appear to be creating TCE as a 
byproduct or using byproduct TCE as reactant/intermediate (e.g., as a 
feedstock for the production of other chemicals) that could potentially 
have wastewater containing TCE. Without the compliance date extension, 
these facilities would not be able to dispose of their wastewater and 
would effectively be forced to cease their operations. EPA does not 
have an estimated social value for the closure of these facilities. 
However, the median employment and revenue at the affected facilities 
is 49 employees and $20 million, respectively. Total employment and 
revenue at affected facilities is estimated to be 3,465 employees and 
$1 billion, respectively.
    EPA does not have exposure monitoring data specific to this use and 
therefore, EPA is not able to quantify the foregone exposure reductions 
that may occur as a result of facilities continuing operations. Under 
the December 2024 rule, the use of TCE by these facilities would be 
prohibited after September 15, 2025, so exposures to workers would 
cease at that time. This interim final rule allows operations using TCE 
to continue until December 18, 2026, allowing for workers' continued 
exposure to TCE and reducing potential health benefits to those 
workers. EPA does not have exposure monitoring data specific to this 
use and therefore, can not quantify that exposure and loss of potential 
benefits.

[[Page 44775]]

II. Regulatory Revisions

A. Rule Background and Summary

1. The October 2023 Notice of Proposed Rulemaking
    In October 2023, EPA proposed a rule under TSCA section 6(a) to 
address unreasonable risk of injury to human health presented by TCE 
under 52 of its 54 total conditions of use (Ref. 21). In the TSCA 
section 6(b) 2020 Risk Evaluation for TCE, EPA identified non-cancer 
adverse effects from acute and chronic inhalation exposures to TCE, and 
for cancer from chronic inhalation exposures to TCE (Ref. 21). The 2023 
proposed rule sought to prohibit the manufacture, processing, and 
distribution in commerce of TCE for all consumer uses; and prohibit the 
manufacture, processing, distribution in commercefor all industrial and 
commercial uses, with certain processing and industrial and commercial 
uses that needed compliance timeframes longer than one year required to 
implement a workplace chemical protection program (WCPP) in the interim 
(Ref. 21). In 2023 EPA also proposed providing certain time-limited 
TSCA section 6(g) exemptions from the prohibition for uses of TCE that 
would otherwise significantly disrupt national security or critical 
infrastructure (Ref. 21).
2. The December 2024 Final Rule
    On December 17, 2024, EPA published the final regulation for TCE 
under TSCA section 6(a) (Ref. 1). Many of the provisions in the 2023 
proposed rule were finalized as proposed, namely the regulatory action 
being the eventual prohibition of all conditions of use (Ref. 1). EPA 
considered information received through public comments, making a 
number of revisions such as: provide a delayed prohibition for five 
conditions of use, include a regulatory threshold, revise specific 
provisions of the WCPP, and modify the times and provisions of the TSCA 
section 6(g) exemption (Ref. 1). The 2024 final rule addressed the 
unreasonable risk from TCE through the eventual prohibition of all 
conditions of use, with certain conditions of use having longer 
timeframes until prohibition or TSCA section 6(g) exemptions to the 
prohibition (Ref. 1). The prohibition of the majority of industrial and 
commercial uses has a compliance date of September 15, 2025 (Ref. 1).
    With respect to the use described in Unit I.C.1, while EPA 
responded to comments and revised provisions of the 2024 final rule in 
consideration of commenters' concerns on industrial and commercial use 
of TCE as a processing aid and other miscellaneous industrial and 
commercial uses of TCE, EPA did not have any information at the time of 
the 2024 final rule publication related to use of TCE in nuclear fuel 
manufacturing (Ref. 1).
    Similarly, EPA responded to public comments and revised several 
aspects of the prohibition and phaseout timeline regarding the disposal 
of TCE to wastewater in the 2024 final rule (Ref. 1). Specifically, 
based on public comments, EPA revised the prohibition date between the 
2023 proposed and 2024 final rules to allow for disposal of TCE to 
wastewater to continue for the length of time for certain uses of TCE 
as a processing aid in various aspects of battery separator 
manufacturing, until that use would be prohibited (after December 18, 
2029; December 18, 2039; or December 18, 2044), in recognition of 
information received on the essential nature of disposal of wastewater 
for the specific processes described in public comments (Ref. 1). 
During public comments, EPA did not receive any explicit information 
about wastewater disposal being essential for other processing uses 
(Ref. 1).
3. Other TSCA Section 6(a) Risk Management Rules
    In 2024, EPA also issued final risk management rules for several 
other chlorinated solvents, including methylene chloride, 
perchloroethylene (PCE), and carbon tetrachloride (CTC). Unlike TCE, 
the manufacturing of each of these chemicals was permitted to continue 
under a WCPP. EPA determined that ongoing manufacturing, processing, 
and use of these chemicals would provide several significant benefits, 
including complementing the Agency's efforts to address climate-
damaging hydrofluorocarbons (HFCs) under the American Innovation and 
Manufacturing Act of 2020 (AIM Act) (42 U.S.C. 7675). More 
specifically, PCE and CTC will continue to be used in tandem with 
strict workplace controls for the generation of HFC-125 and HFC-134a, 
two of the regulated substances that are subject to a 15-year phasedown 
under the AIM Act. HFCs-134a and -125 can be mixed with other 
substances to make lower global warming potential blends that are 
likely to be used to facilitate the transition away from HFC blends 
with higher global warming potentials in certain applications.

B. Petitions

    In June 2025, BWXT, a manufacturer of TRISO nuclear fuel, contacted 
EPA with concerns regarding the impact of the prohibition of TCE on 
their nuclear fuel production which has national security and critical 
use applications, and furnishes several existing Department of Defense 
(DOD) and Department of Energy (DOE) contracts and requested EPA 
provide an exemption from the prohibition (Ref. 2). EPA treated this 
request as a petition under the APA, 5 U.S.C. 553(e). EPA conducted 
outreach to the nuclear fuel manufacturer, as well as with DOD, DOE, 
and the Nuclear Regulatory Commission (NRC) to gather information 
related to this newly identified use of TCE (Refs. 2, 3, 4, 5, 6, and 
7).
    In May 2025 EPA received a TSCA Section 21 Petition from the 
American Chemistry Council (ACC) with concerns regarding the impact of 
the September 15, 2025, prohibition on disposal of TCE to wastewater on 
other processors of TCE and industrial and commercial users of TCE as a 
processing aid (Ref. 16). EPA conducted outreach with ACC and several 
of its member companies to gather information about processing and 
disposal to wastewater (Ref. 17).

C. Compliance Challenges

1. TCE as a Processing Aid in the Manufacture of Nuclear Fuel
    EPA is issuing this interim final rule to address an unanticipated 
emergency that the Agency inadvertently created for nuclear fuel 
manufacturers and Federal Agencies with advanced nuclear reactor 
projects by imposing a general prohibition compliance date of September 
15, 2025, for a miscellaneous condition of use not specifically 
analyzed or discussed in the 2024 final rule. Until receipt of the June 
19, 2025, petition from BWXT, EPA was not aware of this particular 
condition of use of TCE (Ref. 1). EPA now understands that TCE is used 
as a processing aid in the manufacture of nuclear fuel, specifically 
Tri-structural Isotropic (TRISO) nuclear fuel pellets (Refs. 2, 3, 4, 
5, 6, and 7). These TRISO pellets are the nuclear fuel for advanced 
nuclear reactors (Refs. 2, 3, 4, 5, 6, and 7).
    TRISO nuclear fuel pellets are a type of nuclear fuel in which each 
pellet is made of a uranium, carbon, and oxygen fuel kernel 
encapsulated in carbon- and ceramic-based materials (Refs. 2, 3 and 4). 
An important characteristic of TRISO pellets is that they cannot melt 
in a commercial high-temperature reactor, and are able to be heated to 
high temperatures that are beyond the threshold of current nuclear 
fuels (Refs. 2, 3, 4, 5, 6, and 7). TRISO pellets also represent a 
significant safety advancement in that they encapsulate

[[Page 44776]]

small amounts of uranium, whereas traditional nuclear fuel rods contain 
significantly larger amounts of uranium (Refs. 2, 3, 4, 5, 6, and 7). 
This encapsulation of radioactive material means that nuclear reactors 
that use TRISO may not have to build a traditional nuclear containment 
dome, which eliminates the traditional need for a significant physical 
footprint with high engineering demands (Ref. 7). As such, TRISO fuel 
is key for advanced nuclear reactors, and in particular advanced 
nuclear reactors that do not need containment domes such as those 
needed for DOD installations (Refs. 2, 6, and 7).
    TCE is used as processing aid for a forming fluid during the first 
steps of TRISO pellet manufacture, as part of the internal gelation 
sol-gel production pathway (Refs. 2, 3, 4, and 5). In this process, a 
chilled uranium solution is pumped to a forming nozzle with very small 
holes, which then drops the uranium organic solution into a TCE forming 
fluid bath (Refs. 2, 3, 4, and 5). TCE has specific qualities that 
allow it to serve two purposes in the forming process. The TCE is used 
as a method for heat transfer, which warms the chilled uranium that is 
dropped into a TCE bath and triggers the chemical reaction that is the 
gelation part of the process, transforming the liquid droplet into a 
semi solid sphere. TCE also has a specific surface tension and density 
relative to the uranium mixture that ensures that as the uranium passes 
through the TCE bath it retains a spherical shape (Refs. 3 and 4). The 
use of TCE as a processing aid is one of the first steps in the 
manufacture of TRISO fuel. This step is a critical part of the process 
which ensures that the uranium is safely encapsulated through gelation 
and that the TRISO pellets are as spherical as possible--both of which 
are criteria in the highly specific safety standards TRISO fuel must 
meet (Refs. 3, 4, and 5).
    EPA received information in June 2025 regarding the importance of 
TCE as processing aid currently used in the manufacture of nuclear 
fuel, specifically TRISO nuclear fuel pellets, and an extension is 
necessary to avoid disruption to national security and critical 
infrastructure. EPA received the initial request from the nuclear fuel 
manufacturer less than 90 days before the use would be prohibited by 
the September 15, 2025, compliance timeframe in the 2024 final rule. 
The time between being notified about this use and the prohibition was 
insufficient for EPA to prepare and propose a rule, seek public 
comment, and finalize a rule. Given this short timeframe, EPA is 
promulgating this interim final rule in order to avoid the critical 
impacts on national security of a TCE ban on manufacturing nuclear 
fuel. TRISO fuel has many critical infrastructure and national security 
applications, and the timing of TRISO manufacturers transitioning out 
of TCE is linked to the need to fulfill critical military and 
government contracts (Refs. 2, 3, 4, 5, 6, and 7). DOD has indicated 
that TRISO fuel is an essential part of Project Pele, a program in 
which an advanced nuclear reactor fueled by TRISO would help power an 
installation for DOD (Refs. 3, 7, 8, 9, and 10). Project Pele is a DOD 
effort to meet the goals set out in Executive Order (E.O.) 14299, 
``Deploying Advanced Nuclear Reactor Technologies for National 
Security'' (Refs. 3, 7, 8, 9, 10, and 11). At DOE, TRISO fuel is used 
in the Idaho National Lab's advanced nuclear reactor and microreactor 
program. Furthermore, TRISO fuel is planned to be used for testing at 
the National Reactor Innovation Center's Demonstration of Microreactor 
Experiments (Ref. 4).
    Currently, only one company is licensed at a Category I level by 
the Nuclear Regulatory Commission (NRC) to manufacture TRISO fuel--BWX 
Technologies (BWXT), which uses TCE in their nuclear fuel manufacturing 
process (Refs. 2, 3, 4, 5, 6, and 7). There are several other companies 
that manufacture TRISO fuel, but at a much smaller production volume 
and not at an industrial scale (Refs. 4, 5, 6, 7, 22, and 23). BWXT, as 
the only TRISO nuclear fuel manufacturer at a large production scale, 
is the primary supplier of TRISO fuel used in DOD and DOE advanced 
nuclear reactors (Refs. 2, 3, 4, 5, 6, and 7). In its petition, BWXT 
credibly represented that the company cannot discontinue using TCE by 
September 15, 2025, because there is no readibly available alternative 
at the scale needed by DOD and DOE (Refs. 2, 3, 4, 5, 6, and 7). 
Additionally, BWXT cannot immediately begin a transition away from TCE 
because critical infrastructure and national security needs for TRISO 
nuclear fuel are only growing (Refs. 2, 3, 4, 5, 6, and 7). BWXT is 
under several existing contracts with the Federal government to provide 
TRISO fuel for critical projects (Refs. 2, 3, 4, 5, 6, and 7). For 
example, all of Project Pele's fuel is provided by BWXT, and it is 
critical that DOD be able to rely on consistent production of TRISO 
fuel through the Project Pele and E.O. 14299 timeframe of 2028 (Refs. 
3, 7, and 11). This is an active contract, with BWXT expected to start 
production on more TRISO fuel to fulfill DOD requirements as soon as 
uranium is released to furnish the contract (Refs. 3 and 5). 
Additionally, BWXT is set to provide TRISO fuel for the National 
Reactor Innovation Center's Demonstration of Microreactor Experiments 
in the coming years (Ref. 4).
    In order to continue to meet the existing demands from critical 
national security programs for TRISO fuel, and in consideration of the 
time it would take for regulatory licensing and testing of alternative 
technologies, a reasonable transition timeline away from TCE must 
extend beyond the September 15, 2025, prohibition deadline. As 
discussed earlier in this unit, this is because there are limited 
manufacturers able to produce TRISO fuel at scale for military and 
government applications (Refs. 2, 5, 6, and 7). BWXT is the only major 
supplier of TRISO fuel at a Category 1 facility in the US, which is 
able to make TRISO at a production scale and does so using TCE (Refs. 
3, 4, 5, 6, and 7). There are several other manufacturers of TRISO that 
manufacture the nuclear fuel at a smaller scale, in quantities more 
appropriate for lab use and testing (Refs. 5, 6, and 7). Some of these 
other smaller scale manufacturers use TCE in their production process, 
while others use alternative processing aids, such as a silicon based 
forming fluid (Refs. 5, 6, and 7). Because TCE used as a processing aid 
is one of the first steps of making TRISO fuel, transitioning away from 
TCE temporarily halts all the manufacturing of nuclear fuel in a 
production line (Refs. 3, 4, 5, and 6). However, in order to meet 
current existing needs for TRISO for critical Federal applications, the 
TRISO primary supplier would need to continue producing a supply of 
TRISO for at least 2.5 years before shutting down their production line 
to implement an alternative forming fluid to replace TCE (Refs. 3, 4, 
5, 6, aand 7). Regarding military and national security applications, 
the primary TRISO supplier cannot take down their production line until 
Project Pele's test of an advanced nuclear reactor to power a military 
installation which is projected to occur at the end of 2028 (Refs. 3, 
7, 8, and 9). There is additionally the need for the primary supplier 
to be continuously producing TRISO fuel for the next 2.5 years to 
supply the reactors planned for testing at the National Reactor 
Innovation Center's Demonstration of Microreactor Experiments (Ref. 4). 
Only after the time that current contracts for critical military and 
government applications are satisfied would the primary TRISO

[[Page 44777]]

supplier be able to cease operations for their manufacturing line of 
TRISO fuel (Refs. 3, 4, 5, 6, 7). News sources suggest that there are 
likely to be other producers of TRISO fuel that do not use TCE for 
manufacturing TRISO fuel at production scale in a few years (Refs. 24).
    Potential alternatives to TCE as a processing aid in the 
manufacture of nuclear fuel have been identified, but as previously 
noted, this transition is not immediate, and must be timed with 
consideration for production needs. First a company would have to 
research alternative forming fluids (Ref. 4). Once a suitable 
alternative was identified, a nuclear fuel manufacturer would have to 
update its safety analysis and submit a license amendment to NRC, which 
could take six months to one year to process (Ref. 6). In order to 
begin testing the actual manufacturing ability with alternative forming 
fluids, a TRISO nuclear manufacturer would need to shut down its entire 
production line and retrofit its currently existing space and process 
(Refs. 2, 3, and 4). This is due to restrictions placed on a Category 1 
nuclear fuel production facility, in which licensees are often not 
allowed to change the physical footprint of their building and as such 
the supplier could not create a new production area to test TCE 
alternatives while also continuing to run its TRISO production line 
simultaneously (Ref.15). This aspect of the transition would take six 
to 18 months (Refs. 2, 3, and 4). Once a new forming fluid is in place 
in the manufacturing process, the TRISO produced would need to undergo 
quality analysis studies and potential irradiation testing at a 
National Laboratory (Ref. 4). The TRISO fuel produced by a nuclear fuel 
manufacturer using a non-TCE alternative may also have to undergo post-
production irradiation testing, depending on specifications on the 
contract for DOE or DOD. This irradiaition testing could take from 18 
months to three years before the TRISO fuel pellets can be used (Refs. 
3, 4, 5, and 6). This compliance extension represents the minimum 
timeframe possible to transition out of TCE, with BWXT continuously 
producing TRISO fuel for the next 2.5 years and then indicating that 
they could retrofit their production process in the subsequent six 
months (Refs. 2, 3, 4, and 7).
    For similar reasons as noted above, EPA is not finalizing a WCPP 
for this continuing use. EPA expects that users of TCE in the 
manufacture of nuclear fuel reduce risks to the extent practicable due 
to the exposure controls typical of nuclear processing facilities until 
prohibition (Refs. 3 and 4). At BWXT, TCE is used only in a ventilated 
enclosure with an air flow of 125 linear feet per minute (Refs. 3 and 
4). During use of TCE as a processing aid, workers wear PPE that 
includes coveralls, gloves, and eye protection (Refs. 3 and 4). When 
repackaging the TCE, workers at BWXT wear the aforementioned PPE, as 
well as respirators (Refs. 3 and 4). As explained above, there are time 
sensitive emergency national security needs for TRISO fuel, and EPA 
placing additional workplace protection requirements beyond the highly 
specialized workplace practices already in place on this use could 
significantly disrupt national security or critical infrastructure. The 
implementation of the TSCA WCPP would itself take time, as well as 
potentially require the amendment of a license with NRC which would 
delay production for months.
    Additionally, Executive Order (E.O.) 14299, ``Deploying Advanced 
Nuclear Reactor Technologies for National Security,'' signed in May 
2025, highlights this Administration's priorities, which include using 
advanced nuclear technology for both installation and operational 
energy (Ref. 11). The E.O. directs DOD to commence the operation of a 
nuclear reactor, regulated by the United States Army, at a domestic 
military base or installation no later than Sept. 30, 2028 (Ref. 11). 
DOD is explicit that TRISO fuel is necessary to meet the timeline and 
goal of having a operational DOD advanced nuclear reactor--TRISO fuel 
has already been rigorously tested by DOE, and its unique design of 
encapsulating each nucelar particle meets specific DOD needs for 
nuclear safety and portability without requiring large containment 
physical infrastructure (Refs. 7, 8, 9, and 10). Furthermore, a slate 
of four recent Executive Orders regarding nuclear energy will also lead 
to commercial demand for TRISO fuel in order to power commercial 
advanced nuclear reactors (Refs. 5, 6, 11, 12, 13, and 14). These 
Executive Orders have underscored this Administration's commitment to 
nuclear power and specifically call on advanced nuclear reactors (which 
use TRISO fuel) to support our national security and critical 
infrastructure (Refs. 11, 12, 13, and 14).
    Due to the critical infrastructure and national security impacts of 
TRISO fuel that is currently manufactured with TCE, EPA finds it 
appropriate to amend the 2024 final rule to allow for three more years 
until the prohibition. This timeframe would immediately allow the 
primary TRISO manufacturer to finish fulfilling current government 
contracts before shutting down production in order to reformulate 
(Refs. 2, 3, 4, 5, 6, and 7).
2. Disposal of TCE to Wastewater by Chemical Processors
    EPA is issuing this interim final rule to address the significant 
compliance challenges that certain TCE users would face due to the 
September 15, 2025, prohibition on disposal of TCE to industrial pre-
treatment, industrial treatment, or publicly owned treatment works 
(Ref. 1). In particular, this restriction would have adverse effects on 
processors and users of TCE that were permitted to continue their 
activities beyond the prohibition date, yet the disposal prohibition 
would result in the unanticipated cessation of such activities and the 
manufacture of other essential chemistries, described in more detail in 
this unit (Refs. 16 and 17).
    More specifically EPA's 2024 final rule promulgated a prohibition, 
beginning December 18, 2026, on processing TCE as a reactant/
intermediate, and the industrial and commercial use of TCE as a 
processing aid (and processing for such use) in: process solvent used 
in battery manufacture; process solvent used in polymer fiber spinning, 
fluoroelastomer manufacture and Alcantara manufacture; extraction 
solvent used in caprolactam manufacture; precipitant used in beta-
cyclodextrin manufacture (hereinafter referred to as ``chemical 
processors''). In the preamble to the 2024 final rule, EPA explained 
that the processing as a reactant/intermediate condition of use 
includes reuse of byproduct or residual TCE as a reactant. The reuse of 
TCE that was manufactured as a byproduct frequently occurs in the 
production of other chlorinated solvents, namely methylene chloride, 
perchloroethylene (PCE), and carbon tetrachloride (CTC) (Refs. 1, 16, 
and 17).
    In May 2025, EPA was made aware of concerns regarding the impact of 
the prohibition of disposal of TCE to wastewater for those chemical 
processors (Ref. 16). Namely, chemical processors of TCE, who also 
process other chlorinated organics such as methylene chloride, PCE, and 
CTC), reuse TCE that is unintentionally present as a byproduct in their 
feedstock streams as a reactant/intermediate in further manufacturing 
of such chemicals. The manufacturers of these other chlorinated 
solvents provided new information explaining that wastewater from these 
processes contains TCE, and cannot be disposed of using an alternative 
disposal method (e.g.,

[[Page 44778]]

landfill) (Refs. 16 and 17). If these manufacturers are not permitted 
to dispose of TCE wastewater to industrial treatment or pre-treatment 
(as a necessary pre-cursor to surface water disposal as regulated by 
Clean Water Act permits), the manufacture of these other chlorinated 
solvents may cease or be significantly disrupted if they have no method 
for disposal (Refs 16 and 17). Such wastewater discharges are regulated 
under existing wastewater discharge permits and have limits for 
volatile organic compounds such as TCE. More specifically, EPA has been 
informed that chemical processors with feedstock and waste streams that 
contain TCE need to dispose of millions of gallons of wastewater per 
year, a volume that any other form of disposal other than wastewater 
discharge (such as incineration) does not have the capacity to handle 
(Refs. 16 and 17). If these chemical processors were not able to 
dispose of TCE to wastewater, the cost would be so great it could cause 
company closures (Ref. 17).
    Given this new information, EPA understands that chemical 
processors need to dispose of wastewater containing TCE in order to 
continue operations (Refs. 16 and 17). TCE is present as an 
unintentional byproduct of many important industrial solvents--
including methylene chloride, perchloroethylene, carbon tetrachloride, 
and 1,2-dichloroethane, simply due to the nature of how chlorinated 
organics gain and lose chlorine atoms (Refs. 16 and 17). Due to this, 
the ability to dispose of TCE to wastewater is critical not only for 
the processing of TCE, but for the processing of these various other 
solvents (Refs. 16 and 17). EPA has published other section 6 TSCA 
rules for other chlorinated solvents, namely methylene chloride, PCE, 
and CTC (Refs. 18, 19, and 20). In these rules, EPA has determined the 
necessity of allowing certain uses of those chemicals to continue to 
meet various critical needs (Refs. 18, 19, and 20). In order to fulfill 
the intent of those TSCA section 6(a) regulations, this interim final 
rule for TCE amends the 2024 final rule as to not inadvertently shut 
down the chemical manufacturing and processing for methylene chloride, 
PCE, and CTC.
    Moreover, in the 2024 final rule, EPA permitted several other users 
with extended compliance timeframes to continue to dispose of TCE to 
for the timeframe of the phase-out. At the time, EPA was not aware of 
the need for chemical processors to continue to dispose of TCE to to 
industrial treatment or pre-treatment. This rule merely aligns the 
disposal options for these ongoing uses with other proessing aid uses 
with extended phase-outs.
    EPA expects that owners and operators that will be permitted to 
continue to dispose of TCE-containing wastewater to industrial 
treatment or pre-treatment under this rule will already be complying 
with the workplace chemical protection program (WCPP) at 40 CFR 
751.315. Uses that were permitted to continue beyond one year, 
including chemical processors, were required to complete initial 
monitoring by June 16, 2025, and ensure that TCE inhalation exposures 
do not exceed the interim ECEL for all potentially exposed persons by 
September 15, 2025. Based on the new information received, chemical 
processors are not sending the TCE-containing wastewater to POTWs, and 
therefore, EPA believes that the industrial treatment or pre-treatment 
is occuring at the same workplace already complying with the WCPP. To 
avoid unnecessary and potentially duplicative workplace protections, 
EPA is not extending the workplace requirements for wastewater to 
chemical processors and clarifying that the workplace requirements for 
chemical processors are sufficient for the remaining, short duration of 
those uses (i.e., until December 2026) and therefore adding an 
exclusion to 40 CFR 751.315(a)(15) to make this point clear.
3. Downstream Notification
    As a result of the new compliance date for industrial and 
commercial use of TCE as a processing aid in the manufacture of nuclear 
fuel, EPA needs to amend the downstream notification requirements of 
the 2024 final rule to reflect accurately the restrictions on TCE. 
Accurate downstream notification is necessary to spread awareness 
throughout the supply chain of the restrictions on use of TCE under 
TSCA, as well as provide information to commercial end users about 
allowable uses of TCE until the prohibition compliance dates. EPA 
recognizes that the 2024 final rule compliance deadline for updating 
the SDS of June 16, 2025, has already passed and as such, 
manufacturers, processors, and distributors in commerce of TCE would 
need to update or amend their SDS shortly after doing so already. EPA 
finds that 90 days is a practicable time to update the SDS for 
manufacturers, processors, and distributors in commerce of TCE.

D. Specific Regulatory Revisions

1. TCE as a Processing Aid in the Manufacture of Nuclear Fuel
    EPA is amending the prohibition compliance date for the industrial 
and commercial use of TCE in other miscellaneous industrial and 
commercial uses, specifically for the use of TCE as a processing aid in 
the manufacture of nuclear fuel to September 15, 2028. EPA is extending 
the prohibition compliance date for the industrial and commercial use 
of TCE as a processing aid in the manufacture of nuclear fuel, and the 
manufacturing, processing, and distribution in commerce of TCE to 
support such use, with full compliance with the prohibition to be 
required on September 15, 2028, three years from the 2024 final rule's 
compliance date of September 15, 2025.
2. Disposal of TCE to Wastewater by Chemical Processors
    EPA is also amending the compliance deadline for the prohibition on 
disposal of TCE to wastewater from September 15, 2025, to December 18, 
2026, for processors of TCE as a reactant/intermediate and processors 
and industrial and commercial users of TCE as a processing aid (and 
processing for such use) in: process solvent used in battery 
manufacture; process solvent used in polymer fiber spinning, 
fluoroelastomer manufacture and Alcantara manufacture; extraction 
solvent used in caprolactam manufacture; precipitant used in beta-
cyclodextrin manufacture; except for certain uses. This compliance date 
aligns with the December 18, 2026, prohibition on processing TCE and 
with the prohibition on the processing and industrial and commercial 
use of TCE as a processing aid for those uses.
3. Downstream Notification
    EPA is amending the downstream notification requirements to allow 
for 90 days from the publication of this rule in the Federal Register 
for manufacturers, processors, and distributors in commerce of TCE 
amend their SDS to reflect this new use's prohibition compliance 
deadline for the industrial and commercial use of TCE in nuclear fuel 
manufacturing.

III. Rulemaking Procedures

    As noted in section I.B. of this preamble, EPA's authority for the 
rulemaking procedures followed in this action is provided by APA at 5 
U.S.C. 553(b)(B), which allows an agency to forgo notice-and-comment 
requirements ``when the agency for good cause finds

[[Page 44779]]

(and incorporates the finding and a brief statement of reasons therefor 
in the rules issued) that notice and public procedure thereon are 
impracticable, unnecessary, or contrary to the public interest.''
    EPA finds good cause to issue this notice without prior notice and 
comment because such procedures are impracticable. Specifically, there 
is insufficient time before the September 15, 2025, compliance dates to 
address the new information submitted by petitioners on compliance 
difficulties absent immediate action. It is urgent to address these 
compliance difficulties because of the expected negative consequences. 
Although the information available to EPA at the time of rulemaking 
indicated that the manufacture of nuclear fuel either did not involve 
TCE or did not require an extended compliance deadline to avoid 
disruption to national security and critical infrastructure, EPA 
subsequently received information indicating additional time was needed 
for compliance. Specifically, information provided in the June 19, 
2025, petition submitted by BWXT, as discussed in detail in section 
II.C.1. Similarly, information available to EPA at the time of 
rulemaking indicated ACC petitioners could meet certain deadlines 
regarding the disposal of wastewater in the 2024 final rule without 
disrupting critical infrastructure and the national economy. However, 
subsequent information provided in the May 27, 2025, petition submitted 
by ACC, as discussed in detail in section II.C.2, informed EPA of 
significant compliance issues that could result in the shutting down of 
chemical processors and manufacturers for multiple chlorinated organics 
to reach compliance. The information provided by the petitioners 
supports the need for extending the compliance dates.
    Because the September 15, 2025, compliance deadlines for both 
petitioners are imminent, EPA has determined that it would be 
impracticable to undertake prior notice and comment before the 
compliance deadlines to provide petitioners sufficient time to comply 
without adverse consequences to national security and the manufacture 
of multiple chlorinated organics. Under these circumstances, refraining 
from amending the compliance deadlines before they go into effect would 
mean meaningful compliance by petitioners would not be possible by the 
existing deadline. Further, this would needlessly jeopardize EPA's 
ability to work with petitioners to achieve the long-term protective 
outcomes in the 2024 final rule.
    EPA is making this rule effective immediately as a rule which 
``grants or recognizes an exemption or relieves a restriction'' under 
the APA at 5 U.S.C. 553(d)(1). This action relieves restrictions by 
extending several of the 2024 final rule's compliance deadlines.

IV. Requests for Comment

    As explained above, EPA finds good cause to take this interim final 
action without prior notice or opportunity for public comment. However, 
EPA is providing an opportunity for comment on the extension of the 
compliance dates and requests comment on the revisions described in 
this rule. EPA will review and respond to any comments received, 
including by making changes to this action, if appropriate. EPA is not 
reopening for comment any provisions of the 2024 final rule other than 
the specific provisions that are expressly amended in this interim 
final rule.

A. TCE as a Processing Aid in the Manufacture of Nuclear Fuel

    As a result of the information from stakeholders and Federal 
Agencies, EPA is amending the compliance dates applicable to industrial 
and commercial use of TCE as a processing aid in the manufacture of 
nuclear fuel. Under this interim final rule, the prohibition for users 
of TCE in industrial and commercial use for the manufacture of nuclear 
fuel, and the upstream manufacturing, processing, and distribution to 
support such use, would be extended by three years. Manufacturers of 
nuclear fuel would have until September 15, 2028, to comply with the 
prohibition on TCE use. In EPA's view, this newly finalized compliance 
date will prevent an emergency in national security and critical 
infrastructure, and represents a reasonable transition period under 
TSCA section 6(d).
    EPA requests comments and specific information addressing:
     The ability of TRISO nuclear fuel manufacturers to comply 
with the phaseout timeframe in this interim final rule.
     Alternative compliance timeframes for manufacturers of 
nuclear fuel to comply with a prohibition on TCE that are as soon as 
practicable and provide a reasonable transition period.
     Information related to use of TCE in the manufacture of 
nuclear fuel, that may not have been previously available to EPA during 
risk management and should now be considered.
     The number of potentially exposed persons who operate in 
various facilities that manufacture nuclear fuel and the worker 
protections in place at such facilities.
     Information related to use of TCE that may not have been 
previously available to EPA during risk management and should now be 
considered.

B. Disposal of TCE to Wastewater by Chemical Processors

    As a result of the information from stakeholders, EPA is delaying 
the compliance with the prohibition of disposal of TCE to wastewater 
for chemical processors until December 2026. EPA requests comments and 
specific information addressing:
     Information related to disposal of TCE that may not have 
been previously available to EPA during risk management and should now 
be considered.
     The ability of chemical processors to comply with the 
Workplace Chemical Protection Program for disposal of TCE to wastewater 
until prohibition.

V. References

    The following is a listing of the documents that are specifically 
referenced in this document. The docket includes these documents and 
other information considered by EPA, including documents that are 
referenced within the documents that are included in the docket, even 
if the referenced document is not physically located in the docket. For 
assistance in locating these other documents, please consult the 
technical person listed under FOR FURTHER INFORMATION CONTACT.

1. EPA. Trichloroethylene; Regulation under the Toxic Substances 
Control Act; Final Rule. RIN 2070-AK83. Federal Register (89 FR 
102568, December 17, 2024) (FRL-8317-02-OCSPP). https://www.govinfo.gov/content/pkg/FR-2024-12-17/pdf/2024-29274.pdf.
2. Howard B. Markle II. BWXT--Nuclear Operations Group Inc (BWXT). 
BWX Technologies, Inc.--Nuclear Operations Group (BWXT NOG) 
Exemption Request to 40 CFR 751 Subpart D. June 19, 2025.
3. EPA. BWX Technologies Inc Meeting Memo. July 15, 2025.
4. Howard B. Markle II. BWXT--Nuclear Operations Group Inc (BWXT). 
Additional Information supporting BWX Technologies, Inc.--Nuclear 
Operations Group (BWXT NOG) Exemption Request to 40 CFR 751 Subpart 
D. August 6, 2025.
5. EPA. Department of Energy Meeting Memo. July 16, 2025.
6. EPA. Nuclear Regulatory Commission Meeting Memo. July 29, 2025.
7. EPA. Department of Defense Meeting Memo. August 4, 2025.

[[Page 44780]]

8. Department of Defense, Office of the Under Secretary of Defense, 
Research and Engineering. Project Pele Mobile Nuclear Reactor. 
Accessed July 15, 2025. https://www.cto.mil/pele_eis/.
9. BWXT. Project Pele Begins Taking Shape with Start of Core 
Manufacturing. Accessed July 15, 2025. https://www.bwxt.com/project-pele-begins-taking-shape-with-start-of-core-manufacturing/.
10. Jeff Waksman. Project Pele Overview Mobile Nuclear Power For 
Future DoD Need, Slides Supporting Presentation Materials for May 
2022. Accessed July 15, 2025. https://www.nrc.gov/docs/ML2212/ML22126A059.pdf.
11. Executive Order 14299. Deploying Advanced Nuclear Reactor 
Technologies for National Security. Federal Register (90 FR 22581, 
May 29, 2025). https://www.govinfo.gov/content/pkg/FR-2025-05-29/pdf/2025-09796.pdf.
12. Executive Order 14300. Ordering the Reform of the Nuclear 
Regulatory Commission. Federal Register (90 FR 22587, May 29, 2025). 
https://www.govinfo.gov/content/pkg/FR-2025-05-29/pdf/2025-09798.pdf.
13. Executive Order 14301. Reforming Nuclear Reactor Testing at the 
Department of Energy. Federal Register (90 FR 22591, May 29, 2025). 
https://www.govinfo.gov/content/pkg/FR-2025-05-29/pdf/2025-09799.pdf.
14. Executive Order 14302. Reinvigorating the Nuclear Industrial 
Base. Federal Register (90 FR 22595, May 29, 2025). https://www.govinfo.gov/content/pkg/FR-2025-05-29/pdf/2025-09801.pdf.
15. Nuclear Regulatory Commission. BWXT Materials License SNM-0042, 
Renewed 2007. March 29, 2007. Accessed August 8, 2025. https://www.nrc.gov/docs/ML0813/ML081330687.pdf.
16. Robert Simon. American Chemistry Council's Petition for 
Rulemaking to Reconsider Provisions of the Trichloroethylene TSCA 
Risk Management Rule, 89 FR 102568 (Dec. 17, 2024). May 27, 2025. 
https://www.epa.gov/system/files/documents/2025-06/sec.-21-petition-acc-reconsider-tce-rm-rule-25-04529-ao-ex-1.pdf.
17. EPA. American Chemistry Council Meeting Memo. July 23, 2025.
18. EPA. Methylene Chloride; Regulation under the Toxic Substances 
Control Act; Final Rule. RIN 2070-AK70. Federal Register (89 FR 
39254, May 8, 2024) (FRL-8155-01-OCSPP). https://www.govinfo.gov/content/pkg/FR-2024-05-08/pdf/2024-09606.pdf.
19. EPA. Perchloroethylene: Regulation under the Toxic Substances 
Control Act; Final Rule. RIN 2070-AK84. Federal Register (88 FR 
39652. June 16, 2023) (FRL-8329-02-OCSPP). https://www.govinfo.gov/content/pkg/FR-2024-12-18/pdf/2024-30117.pdf.
20. EPA. Carbon Tetrachloride: Regulation under the Toxic Substances 
Control Act; Final Rule. RIN 2070-AK82. Federal Register (88 FR 
49180. July 28, 2023) (FRL-8206-01-OCSPP). https://www.govinfo.gov/content/pkg/FR-2024-12-18/pdf/2024-29517.pdf.
21. EPA. Trichloroethylene (TCE); Regulation Under the Toxic 
Substances Control Act (TSCA); Proposed Rule. RIN 2070-AK83. Federal 
Register (88 FR 74712, October 31, 2023) (FRL-8317-01-OCSPP). 
https://www.govinfo.gov/content/pkg/FR-2023-10-31/pdf/2023-23010.pdf.
22. United States Nuclear Regulatory Commission. TRISO-X. Accessed 
August 8, 2025. https://www.nrc.gov/info-finder/fc/triso-x.html.
23. United States Nuclear Regulatory Commission. FRAMATOME. Accessed 
August 8, 2025. https://www.nrc.gov/info-finder/fc/areva-np-lc.html.
24. EPA. Economic Analysis of the Regulation of Trichloroethylene 
Under TSCA Section 6(a) Amendment to the 2024 Final Rule--Interim 
Final Rule. September 10, 2025.

VI. Statutory and Executive Order Reviews

    Additional information about these statutes and Executive Orders 
can be found at https://www.epa.gov/laws-regulations/laws-and-executive-orders.

A. Executive Order 12866: Regulatory Planning and Review and Executive 
Order 13563: Improving Regulation and Regulatory Review

    This action is a significant regulatory action that was submitted 
to the Office of Management and Budget (OMB) for review under Executive 
Orders 12866 and 13563 (76 FR 3821, January 21, 2011). Any changes made 
in response to OMB recommendations have been documented in the docket. 
In addition, EPA prepared an economic analysis of the potential costs 
and benefits associated with this action (Ref. 24). This analysis is 
also available in the docket.

B. Executive Order 14192: Unleashing Prosperity Through Deregulation

    This action is an Executive Order 14192 deregulatory action. This 
interim final rule provides burden reduction by providing relief 
against existing compliance deadlines.

C. Paperwork Reduction Act (PRA)

    The information collection activities in this interim final rule 
have been submitted for approval to OMB under the PRA, 44 U.S.C. 3501 
et seq. The underlying requirements are approved under OMB control 
number 2070-0232. However, EPA has submitted a request for additional 
approval to OMB under PRA because the interim final rule alters the 
language of a required language of a disclosure statement that is 
covered by the currently approved collection of information. The 
Information Collection Request (ICR) document that the EPA prepared has 
been assigned EPA ICR number 2775.03. You can find a copy of the ICR in 
the docket for this rule, and it is briefly summarized here. The 
information collection requirements are not enforceable until OMB 
approves them.
    The provision that may increase burden under the PRA is downstream 
notification, which is required to be carried out by updates to the 
relevant SDS and required for manufacturers, processors, and 
distributors in commerce of TCE for the industrial and commercial use 
of TCE in nuclear fuel manufacturing, who would provide notice to 
companies downstream upon shipment of TCE about the prohibitions. The 
information submitted to downstream companies through the SDS would 
provide knowledge and awareness of the restrictions to these companies.
    Respondents/affected entities: Persons that manufacture (including 
import), process, and distribute in commerce products containing TCE.
    Respondent's obligation to respond: Mandatory. 15 U.S.C. 2605(a) 
and 40 CFR part 751.
    Estimated number of respondents: 11.
    Frequency of response: Once.
    Total estimated burden: 7.3 hours (per year). Burden is defined at 
5 CFR 1320.3(b).
    Total estimated cost: $744, (per year), includes $0 annualized 
capital or operation & maintenance costs.
    An agency may not conduct or sponsor, and a person is not required 
to respond to, a collection of information unless it displays a 
currently valid OMB control number. The OMB control numbers for the 
EPA's regulations in 40 CFR are listed in 40 CFR part 9. When OMB 
approves this ICR, the Agency will announce that approval in the 
Federal Register and publish a technical amendment to 40 CFR part 9 to 
display the OMB control number for the approved information collection 
activities contained in this interim final rule.

D. Regulatory Flexibility Act (RFA)

    This action is not subject to the RFA, 5 U.S.C. 601 et seq. The RFA 
applies only to rules subject to notice and comment rulemaking 
requirements under the Administrative Procedure Act (APA), 5 U.S.C. 
553, or any other statute. This rule is not subject to notice and 
comment requirements because the Agency has invoked the APA ``good 
cause'' exemption under 5 U.S.C. 553(b). Regardless, EPA's analysis 
concludes that only 5 entities affected by this action meet the SBA 
definition of a small entity and none of these affected entities would 
have cost impacts exceeding 1% of their revenues.

[[Page 44781]]

Therefore this action will not have a significant economic impact on a 
substantial number of small entities.

E. Unfunded Mandates Reform Act (UMRA)

    This action does not contain an unfunded mandate of $100 million 
(in 1995 dollars and adjusted annually for inflation) or more as 
described in UMRA, 2 U.S.C. 1531-1538, and does not significantly or 
uniquely affect small governments. The costs involved in this action 
are estimated not to exceed $187 million in 2024$ ($100 million in 
1995$, adjusted for inflation using the GDP implicit price deflator) in 
any one year.

F. Executive Order 13132: Federalism

    This action does not have federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999) because it will 
not have substantial direct effects on the states, on the relationship 
between the national government and the states, or on the distribution 
of power and responsibilities among the various levels of government.

G. Executive Order 13175: Consultation and Coordination With Indian 
Tribal Governments

    This action does not have tribal implications as specified in 
Executive Order 13175 (65 FR 67249, November 9, 2000) because it does 
not have substantial direct effects on one or more Indian tribes, on 
the relationship between the Federal Government and Indian tribes, or 
on the distribution of power and responsibilities between the Federal 
Government and Indian tribes. Thus, Executive Order 13175 does not 
apply to this action.

H. Executive Order 13045: Protection of Children From Environmental 
Health Risks and Safety Risks

    This action is not a ``covered regulatory action'' under Executive 
Order 13045 (62 FR 19885, April 23, 1997) because it is not a 
significant regulatory action under section 3(f)(1) of Executive Order 
12866 and because the EPA does not believe the environmental health or 
safety risks addressed by this action present a disproportionate risk 
to children.

I. Executive Order 13211: Actions Concerning Regulations That 
Significantly Affect Energy Supply, Distribution, or Use

    This action is not a ``significant energy action'' as defined in 
Executive Order 13211 (66 FR 28355, May 22, 2001) because it is not 
likely to have a significant adverse effect on the supply, distribution 
or use of energy. Further, we have concluded that this action is not 
likely to have any adverse energy effects because it will avert 
substantial, negative near-term consequences for national security and 
critical infrastructure, including for the supply of energy, in 
particular by allowing for continuity of operations with respect to the 
manufacture of TRISO nuclear fuel.

J. National Technology Transfer and Advancement Act (NTTAA)

    This action does not involve technical standards under the NTTAA 
section 12(d), 15 U.S.C. 272.

K. Congressional Review Act (CRA)

    This action is subject to the CRA, 5 U.S.C. 801 et seq., and EPA 
will submit a rule report to each House of the Congress and to the 
Comptroller General of the United States. This action is not a ``major 
rule'' as defined by 5 U.S.C. 804(2).

List of Subjects in 40 CFR Part 751

    Environmental protection, Chemicals, Export notification, Hazardous 
substances, Import certification, Reporting and recordkeeping.

Lee Zeldin,
Administrator.

    For the reasons set forth in the preamble, 40 CFR part 751 is 
amended as follows:

PART 751--REGULATION OF CERTAIN CHEMICAL SUBSTANCES AND MIXTURES 
UNDER SECTION 6 OF THE TOXIC SUBSTANCES CONTROL ACT

0
1. The authority citation for part 751 continues to read as follows:

    Authority:  15 U.S.C. 2605, 15 U.S.C. 2625(l)(4).


0
2. Amend Sec.  751.305 by:
0
a. Revising paragraph (b)(9); and
0
b. Adding paragraph (b)(27).
    The revisions and additions read as follows:


Sec.  751.305  Prohibitions of manufacturing, processing, distribution 
in commerce, use and disposal.

* * * * *
    (b) * * *
    (9) After December 18, 2026, except for those uses specified in 
paragraphs (b)(14), (23), (24), and (27) of this section, all persons 
are prohibited from:
    (i) Processing TCE as a reactant/intermediate, except for the use 
as specified in paragraph (b)(18) of this section;
    (ii) Processing for and industrial and commercial use of TCE as a 
processing aid in: process solvent used in battery manufacture; process 
solvent used in polymer fiber spinning, fluoroelastomer manufacture and 
Alcantara manufacture; extraction solvent used in caprolactam 
manufacture; precipitant used in beta-cyclodextrin manufacture; and
    (iii) The disposal of TCE from the uses specified in (b)(9)(i) and 
(ii) of this section to industrial pre-treatment, industrial treatment, 
or publicly owned treatment works.
* * * * *
    (27) After September 15, 2028, all persons are prohibited from the 
industrial and commercial use of TCE as a processing aid in the 
manufacture of nuclear fuel, and manufacturing (including importing), 
processing, and distribution in commerce of TCE for such use.

0
3. Amend Sec.  751.313 by:
0
a. Revising paragraph (e); and
0
b. Adding paragraph (h)
    The revisions and additions read as follows:


Sec.  751.313  Phase-out of disposal of TCE to industrial pre-
treatment, treatment, or publicly owned treatment works.

* * * * *
    (e) The owner or operator of the location where disposal of TCE to 
industrial pre-treatment, treatment, or to a publicly owned treatment 
works occurs must comply with the Workplace Chemical Protection Program 
provisions in Sec.  751.315, except for the disposal permitted in Sec.  
751.305(b)(9).
* * * * *
    (h) Except for those uses specified in paragraphs (b), (c), and (d) 
of this section, all persons engaged in the uses specified in 
paragraphs (h)(i) or (ii) of this section are prohibited from disposal 
of TCE to industrial pre-treatment, industrial treatment, or publicly 
owned treatment works after December 18, 2026:
    (i) Processing TCE as a reactant/intermediate;
    (ii) Processing TCE for industrial and commercial use of TCE as a 
processing aid, or are the industrial and commercial users of TCE as a 
processing aid, in: process solvent used in battery manufacture; 
process solvent used in polymer fiber spinning, fluoroelastomer 
manufacture and Alcantara manufacture; extraction solvent used in 
caprolactam manufacture; precipitant used in beta-cyclodextrin 
manufacture.

0
4. Amend Sec.  751.315 by revising paragraph (a)(15) to read as 
follows:


Sec.  751.315  Workplace chemical protection program.

* * * * *

[[Page 44782]]

    (a) * * *
    (15) Disposal of TCE to industrial pre-treatment, industrial 
treatment, or publicly owned treatment works, except for the disposal 
permitted in Sec.  751.305(b)(9) and to the extent that the activity is 
covered by the workplace protections in Sec.  751.319.
* * * * *

0
5. Revise and republish Sec.  751.321 to read as follows:


Sec.  751.321  Downstream notification.

    (a) After February 18, 2025, and before December 16, 2025, each 
person who manufactures (including imports) TCE for any use must, prior 
to or concurrent with the shipment, notify companies to whom TCE is 
shipped, in writing, of the restrictions described in this subpart in 
accordance with paragraph (c) of this section.
    (b) After June 16, 2025, and before December 16, 2025, each person 
who processes or distributes in commerce TCE or any TCE-containing 
products for any use must, prior to or concurrent with the shipment, 
notify companies to whom TCE is shipped, in writing, of the 
restrictions described in this subpart in accordance with paragraph (c) 
of this section.
    (c) The notification required under paragraphs (a) and (b) of this 
section must occur by inserting the following text in section 1(c) and 
15 of the Safety Data Sheet (SDS) provided with the TCE or with any 
TCE-containing product:
    ``After June 16, 2025, this chemical/product is and can only be 
domestically manufactured, imported, processed, or distributed in 
commerce for the following purposes until the following prohibitions 
take effect: (1) Processing as an intermediate (a) for the manufacture 
of HFC-134a until June 18, 2033, and (b) for all other processing as a 
reactant/intermediate until December 18, 2026; (2) Industrial and 
commercial use as a solvent for open-top batch vapor degreasing until 
December 18, 2025; (3) Industrial and commercial use as a solvent for 
closed-loop batch vapor degreasing until December 18, 2025, except for 
industrial and commercial use in batch vapor degreasing for land-based 
DOD defense systems by Federal agencies and their contractors until 
December 18, 2029, and except for industrial and commercial use as a 
solvent for closed-loop batch vapor degreasing necessary for rocket 
engine cleaning by Federal agencies and their contractors until 
December 18, 2031, and except for industrial and commercial use of TCE 
in closed-loop and open-top batch vapor degreasing for essential 
aerospace parts and components and narrow tubing used in medical 
devices until December 18, 2031, and except for industrial and 
commercial use as a solvent for closed-loop batch vapor degreasing for 
rayon fabric scouring for end use in rocket booster nozzle production 
by Federal agencies and their contractors until December 18, 2034; (4) 
Industrial and commercial use in processing aid (a) for lithium battery 
separator manufacturing until December 18, 2029, and (b) for lead-acid 
battery separator manufacturing until December 18, 2044, and (c) for 
specialty polymeric microporous sheet material manufacturing until 
December 18, 2039, and (d) in process solvent used in battery 
manufacture; in process solvent used in polymer fiber spinning, 
fluoroelastomer manufacture and Alcantara manufacture; in extraction 
solvent used in caprolactam manufacture; and in precipitant used in 
beta-cyclodextrin manufacture until December 18, 2026; (5) Industrial 
and commercial uses for vessels of the Armed Forces and their systems, 
and in the maintenance, fabrication, and sustainment for and of such 
vessels and systems until December 18, 2034; and (6) Industrial and 
commercial use for laboratory use (a) for essential laboratory 
activities until December 18, 2074 and (b) for asphalt testing and 
recovery using manual centrifuge processes until December 18, 2029 and 
for asphalt testing and recovery until December 18, 2034.''
    (d) Beginning on December 16, 2025, each person who manufactures 
(including imports), processes, or distributes in commerce TCE or any 
TCE-containing products must, prior to or concurrent with the shipment, 
notify companies to whom TCE is shipped, in writing, of the 
restrictions described in this subpart in accordance with paragraph (e) 
of this section.
    (e) The notification required under paragraph (d) of this section 
must occur by inserting the following text in section 1(c) and 15 of 
the Safety Data Sheet (SDS) provided with the TCE or with any TCE-
containing product:
    ``After June 16, 2025, this chemical/product is and can only be 
domestically manufactured, imported, processed, or distributed in 
commerce for the following purposes until the following prohibitions 
take effect: (1) Processing as an intermediate (a) for the manufacture 
of HFC-134a until June 18, 2033, and (b) for all other processing as a 
reactant/intermediate until December 18, 2026; (2) Industrial and 
commercial use as a solvent for open-top batch vapor degreasing until 
December 18, 2025; (3) Industrial and commercial use as a solvent for 
closed-loop batch vapor degreasing until December 18, 2025, except for 
industrial and commercial use in batch vapor degreasing for land-based 
DOD defense systems by Federal agencies and their contractors until 
December 18, 2029, and except for industrial and commercial use as a 
solvent for closed-loop batch vapor degreasing necessary for rocket 
engine cleaning by Federal agencies and their contractors until 
December 18, 2031, and except for industrial and commercial use of TCE 
in closed-loop and open-top batch vapor degreasing for essential 
aerospace parts and components and narrow tubing used in medical 
devices until December 18, 2031, and except for industrial and 
commercial use as a solvent for closed-loop batch vapor degreasing for 
rayon fabric scouring for end use in rocket booster nozzle production 
by Federal agencies and their contractors until December 18, 2034; (4) 
Industrial and commercial use in processing aid (a) for lithium battery 
separator manufacturing until December 18, 2029, and (b) for lead-acid 
battery separator manufacturing until December 18, 2044, and (c) for 
specialty polymeric microporous sheet material manufacturing until 
December 18, 2039, and (d) in process solvent used in battery 
manufacture; in process solvent used in polymer fiber spinning, 
fluoroelastomer manufacture and Alcantara manufacture; in extraction 
solvent used in caprolactam manufacture; and in precipitant used in 
beta-cyclodextrin manufacture until December 18, 2026; (5) Industrial 
and commercial uses for vessels of the Armed Forces and their systems, 
and in the maintenance, fabrication, and sustainment for and of such 
vessels and systems until December 18, 2034; (6) Industrial and 
commercial use for laboratory use (a) for essential laboratory 
activities until December 18, 2074 and (b) for asphalt testing and 
recovery using manual centrifuge processes until December 18, 2029 and 
for asphalt testing and recovery until December 18, 2034; and (7) 
Industrial and commercial use as a processing aid in the manufacture of 
nuclear fuel until September 15, 2028.''

[FR Doc. 2025-17948 Filed 9-15-25; 4:15 pm]
BILLING CODE 6560-50-P