[Federal Register Volume 90, Number 170 (Friday, September 5, 2025)]
[Rules and Regulations]
[Pages 42805-42807]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-17066]



[[Page 42805]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2024-2423; Project Identifier AD-2024-00320-E; 
Amendment 39-23126; AD 2025-17-16]
RIN 2120-AA64


Airworthiness Directives; International Aero Engines AG Engines

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The FAA is adopting a new airworthiness directive (AD) for 
certain International Aero Engines AG (IAE AG) Model V2522-A5, V2524-
A5, V2525-D5, V2527-A5, V2527E-A5, V2527M-A5, V2528-D5, V2530-A5, 
V2531-E5, and V2533-A5 engines. This AD was prompted by further 
analysis of an event involving an IAE AG Model V2533-A5 engine that had 
an uncontained failure of a high-pressure turbine (HPT) 1st-stage hub 
that resulted in high-energy debris penetrating the engine cowling. 
This AD requires revising the airworthiness limitations section (ALS) 
of the existing maintenance manual or instructions for continued 
airworthiness and the existing approved maintenance or inspection 
program, as applicable, to include new inspections of certain critical 
rotating parts. The FAA is issuing this AD to address the unsafe 
condition on these products.

DATES: This AD is effective October 10, 2025.

ADDRESSES: AD Docket: You may examine the AD docket at regulations.gov 
under Docket No. FAA-2024-2423; or in person at Docket Operations 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains this final rule, any comments 
received, and other information. The address for Docket Operations is 
U.S. Department of Transportation, Docket Operations, M-30, West 
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE, 
Washington, DC 20590.

FOR FURTHER INFORMATION CONTACT: Carol Nguyen, Aviation Safety 
Engineer, FAA, 2200 South 216th Street, Des Moines, WA 98198 phone: 
(781) 238-7655; email: [email protected].

SUPPLEMENTARY INFORMATION: 

Background

    The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 
CFR part 39 by adding an AD that would apply to certain IAE AG Model 
V2522-A5, V2524-A5, V2525-D5, V2527-A5, V2527E-A5, V2527M-A5, V2528-D5, 
V2530-A5, V2531-E5, and V2533-A5 engines. The NPRM was published in the 
Federal Register on November 12, 2024 (89 FR 88908). The NPRM was 
prompted by further analysis of an event involving an IAE AG Model 
V2533-A5 engine that had an uncontained failure of an HPT 1st-stage hub 
that resulted in high-energy debris penetrating the engine cowling. In 
the NPRM, the FAA proposed to require revising the ALS of the existing 
maintenance manual or instructions for continued airworthiness and the 
existing approved maintenance or inspection program, as applicable, to 
include new inspections of the HPT 1st-stage hub and HPT 2nd-stage hub. 
The FAA is issuing this AD to address the unsafe condition on these 
products.

Discussion of Final Airworthiness Directive

Comments

    The FAA received comments from seven commenters. The commenters 
were the Air Line Pilots Association, International (ALPA); JetBlue 
Airways (JetBlue); Lufthansa Technik AG (Lufthansa); Ryanair; SIA 
Engineering Company (SIAEC); United Airlines (UAL); and an anonymous 
commenter. ALPA supported the proposed AD without change. The following 
presents the comments received on the NPRM and the FAA's response to 
each comment.

Request To Update Task Reference

    JetBlue, Lufthansa, Ryanair, SIAEC, UAL, and an anonymous commenter 
requested that the FAA change one of the tasks in the ``Inspection 
(Engine Manual Reference)'' column in table 1 to paragraph (g) of the 
proposed AD from ``Task 72-45-11-200-009'' to ``Task 72-45-31-200-
009.'' UAL, JetBlue, and Ryanair noted that Task 72-45-11-200-009 does 
not exist in the engine manual.
    The FAA agrees and has updated the language in table 1 to paragraph 
(g) of this AD as requested.

Request To Update Paragraph (g) of the Proposed AD

    An anonymous commenter requested that the FAA update paragraph (g) 
of the proposed AD to read as follows; ``Revise the Maintenance 
Scheduling Section (MSS) of the Time Limits Manuals (TLM): T-V2500-1IA 
Task 05-10-00-990-000-B00 (A5), T-V2500-3IA Task 05-10-00-990-000 (D5), 
and T-V2500-[???] Task 05-10-00-990-000(?) (E5), and for air carrier 
operations revise the approved continuous airworthiness maintenance 
program; by incorporating the information specified in table 1 to 
paragraph (g) of this AD, as applicable.'' The anonymous commenter 
noted that the use of the word ``your'' to describe the existing 
approved maintenance or inspection program is not clear and the 
statement should be changed to clarify that the action relates to each 
FAA certificated air carrier.
    The FAA partially agrees. The FAA does not agree with the wording 
proposed by the anonymous commenter because not all operators use the 
term ``continuous airworthiness maintenance program.'' The FAA agrees 
to meet the commenter's intent in paragraph (g)(1) and (2) of this AD 
by updating those paragraphs as set forth in the AD section of this 
rule.

Request To Clarify Responsibility for Required Actions

    Lufthansa requested that the FAA reword paragraph (g) of the 
proposed AD to ensure that parts are inspected during each qualifying 
shop visit directly after the effective date of the proposed AD and to 
clarify which requirements are to be done by the repair shops and which 
must be done on-wing by the air carriers.
    The FAA agrees and has updated the language in paragraph (g) of 
this AD to specify required actions for air carrier operations and to 
clarify that TASK 72-45-11-200-006 and TASK 72-45-31-200-009 are 
located in paragraph B.1 of the Maintenance Scheduling section of the 
applicable TLM, which is done at piece-part exposure.

Request To Clarify Inspection Task Requirement

    An anonymous commenter requested that the FAA clarify that the 
performance of each inspection task is not directly required by the 
proposed AD, and that the only required actions are the one time update 
to the (FAA Approved) Maintenance Scheduling sections for the V2500-A5, 
V2500-D5, and V2500-D5 TLM, and the one time update to each FAA 
Certificated Air Carrier's Continuous Airworthiness Maintenance 
Program.
    The FAA agrees to clarify. This AD requires an update to the 
operator's ICA, which includes the Engine Maintenance Manual (EMM). The 
operator's EMM will need to be updated to include TASK 72-45-11-200-006 
and TASK 72-45-31-200-009 in the TLM in order to comply with this AD. 
For some operators, this would be considered their Continuous 
Airworthiness Maintenance Program. The performance of these tasks is 
required by other FAA regulations that are then required upon 
compliance with this AD. The FAA did

[[Page 42806]]

not change this AD as a result of this comment.

Request To Clarify Responsibility for EMM Revision

    SIAEC requested that the FAA update paragraph (g) of this AD to 
clarify who is responsible for revising the EMM. SIAEC notes that the 
proposed AD requires a revision to the Maintenance Scheduling paragraph 
of the ALS of the existing approved EMM, but an operator is unable to 
revise the EMM because it is the responsibility of the original 
equipment manufacturer (OEM).
    The FAA disagrees that the revision to the EMM is solely the 
responsibility of the OEM because an operator may not be required to 
have the latest version of the OEM's EMM incorporated into their ICA. 
This AD requires the operator to include the latest two inspection 
tasks into the operator's EMM regardless of what version of the EMM 
they are currently required to have. The operator will then update 
their existing approved maintenance or inspection program, as 
applicable. The FAA did not change this AD as a result of this comment.

Request To Refer to the ALS of the Approved TLM

    Lufthansa requested that the FAA refer to the ALS of the approved 
TLM in the proposed AD instead of the ALS of the approved EMM.
    The FAA agrees and has updated the language in paragraph (g)(1) of 
this AD as requested.

Request To Clarify Compliance With AD Requirements

    SIAEC requested that the FAA clarify whether the incorporation of 
TASK 72-45-11-200-006 and TASK 72-45-31-200-009 into the EMM 
constitutes compliance with the requirement of the proposed AD and no 
further action is required.
    The FAA agrees to clarify. The incorporation of TASK 72-45-11-200-
006 and TASK 72-45-31-200-009 into the EMM only constitutes compliance 
with the requirements of this AD for those that do not by regulation 
have an existing approved maintenance or inspection program. For 
operators that do have such program, there is an additional requirement 
for operators to make changes to their existing approved maintenance or 
inspection program. The FAA did not change this AD as a result of this 
comment.

Request To Change the Proposed AD to a Supersedure

    An anonymous commenter requested that the FAA designate the 
proposed AD as a supersedure to AD 2004-12-08, Amendment 39-13667 (69 
FR 34051, June 18, 2004) (AD 2004-12-08). The commenter noted that all 
required actions of AD 2004-12-08 must have been completed within 90 
days of July 23, 2004.
    The FAA disagrees with the request to issue this final rule as a 
supersedure AD. The ALS revisions required by AD 2004-12-08 include 
enhanced inspections of certain life-limited parts at each piece-part 
exposure while this AD requires the inclusion of two additional 
inspections for only the HPT 1st-stage hub and HPT 2nd-stage hub at 
piece-part exposure. The FAA has determined that a stand-alone AD is 
appropriate because the only intent of this AD is to require updating 
the existing ALS to add the two new inspections of the HPT 1st-stage 
hub and HPT 2nd-stage hub at piece-part exposure. The FAA did not 
change this AD as a result of this comment.

Request To Clarify Angle Ultrasonic Inspection (AUSI) Interval

    SIAEC requested that the FAA clarify the inspection interval for 
the AUSIs that are required for the HPT stage 1 hub having part number 
(P/N) 2A5001 and HPT stage 2 hub having P/N 2A4802. SIAEC noted that 
these parts are already listed in AMP section 18 and require 
replacement before reaching 20,000 flight cycles, but the threshold for 
the AUSI is not listed in the proposed AD, TASK 72-45-11-200-006 or 
TASK 72-45-31-200-009.
    The FAA agrees and has updated paragraph (g)(1) of this AD to 
clarify that TASK 72-45-11-200-006 and TASK 72-45-31-200-009 are 
located in paragraph B.1 of the Maintenance Scheduling section of the 
applicable TLM, which is done at piece-part exposure.

Conclusion

    The FAA reviewed the relevant data, considered any comments 
received, and determined that air safety requires adopting this AD as 
proposed. Accordingly, the FAA is issuing this AD to address the unsafe 
condition on these products. Except for minor editorial changes, and 
any other changes described previously, this AD is adopted as proposed 
in the NPRM. None of the changes will increase the economic burden on 
any operator.

Costs of Compliance

    The FAA estimates that this AD affects 1,514 engines installed on 
airplanes of U.S. registry.
    The FAA estimates the following costs to comply with this AD:

                                                 Estimated Costs
----------------------------------------------------------------------------------------------------------------
                                                                                       Cost per    Cost on U.S.
                  Action                            Labor cost           Parts cost    product       operators
----------------------------------------------------------------------------------------------------------------
Revise the ALS...........................  1 work-hour x $85 per hour            $0          $85        $128,690
                                            = $85.
----------------------------------------------------------------------------------------------------------------

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    The FAA is issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701: General requirements. 
Under that section, Congress charges the FAA with promoting safe flight 
of civil aircraft in air commerce by prescribing regulations for 
practices, methods, and procedures the Administrator finds necessary 
for safety in air commerce. This regulation is within the scope of that 
authority because it addresses an unsafe condition that is likely to 
exist or develop on products identified in this rulemaking action.

Regulatory Findings

    This AD will not have federalism implications under Executive Order 
13132. This AD will not have a substantial direct effect on the States, 
on the relationship between the national government and the States, or 
on the distribution of power and responsibilities among the various 
levels of government.
    For the reasons discussed above, I certify that this AD:

[[Page 42807]]

    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Will not affect intrastate aviation in Alaska, and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive:

2025-17-16 International Aero Engines AG: Amendment 39-23126; Docket 
No. FAA-2024-2423; Project Identifier AD-2024-00320-E.

(a) Effective Date

    This airworthiness directive (AD) is effective October 10, 2025.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to International Aero Engines AG (IAE AG) Model 
V2522-A5, V2524-A5, V2525-D5, V2527-A5, V2527E-A5, V2527M-A5, V2528-
D5, V2530-A5, V2531-E5, and V2533-A5 engines.

(d) Subject

    Joint Aircraft System Component (JASC) Code 7250, Turbine Engine 
Compressor Sections.

(e) Unsafe Condition

    This AD was prompted by further analysis of an event involving 
an IAE AG model V2533-A5 engines that experienced an uncontained 
high-pressure turbine (HPT) 1st-stage hub failure that resulted in 
high-energy debris penetrating the engine cowling. The FAA is 
issuing this AD to prevent failure of the HPT 1st-stage hub and HPT 
2nd-stage hub. The unsafe condition, if not addressed, could result 
in an uncontained hub failure, release of high-energy debris, damage 
to the engine, damage to the airplane, and loss of the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Required Action

    (1) Within 90 days after the effective date of this AD, revise 
paragraph B.1 of the Maintenance Scheduling section in the 
airworthiness limitations section (ALS) of the Instructions for 
Continued Airworthiness (ICA) located in the applicable existing 
Time Limits Manual (TLM), as listed in paragraphs (g)(1)(i) through 
(iii) of this AD, by incorporating the information specified in 
table 1 to paragraph (g) of this AD:
    (i) Part Number (P/N) 2A4408, TASK 05-10-00-990-000-B00 
Instructions For Continued Airworthiness (V2500-A5);
    (ii) P/N 2A4417, TASK 05-10-00-990-000 Instructions For 
Continued Airworthiness (V2500-D5);
    (iii) P/N 2A4384, TASK 05-10-00-990-000-A00 Instructions For 
Continued Airworthiness (V2500-E5).
    (2) For air carrier operations, within 90 days after the 
effective date of this AD, revise the existing approved maintenance 
or inspection program, as applicable, by incorporating the 
information specified in table 1 to paragraph (g) of this AD, as 
applicable.

Table 1 to Paragraph (g)--ALS Additional Inspections

----------------------------------------------------------------------------------------------------------------
             Part nomenclature                  Part No.             Inspection (engine manual reference)
----------------------------------------------------------------------------------------------------------------
HPT Stage 1 Hub............................          2A5001  TASK 72-45-11-200-006.
HPT Stage 2 Hub............................          2A4802  TASK 72-45-31-200-009.
----------------------------------------------------------------------------------------------------------------

(h) Provisions for Alternative Actions

    After the actions required by paragraph (g)(1) and (2) of this 
AD have been done, no alternative actions are allowed unless they 
are approved as specified in the provisions of paragraph (i) of this 
AD.

(i) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, AIR-520 Continued Operational Safety Branch, 
FAA, has the authority to approve AMOCs for this AD, if requested 
using the procedures found in 14 CFR 39.19. In accordance with 14 
CFR 39.19, send your request to your principal inspector or local 
Flight Standards District Office, as appropriate. If sending 
information directly to the manager of the AIR-520 Continued 
Operational Safety Branch, send it to the attention of the person 
identified in paragraph (j) of this AD and email to: [email protected].
    (2) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.

(j) Additional Information

    For more information about this AD, contact Carol Nguyen, 
Aviation Safety Engineer, FAA, 2200 South 216th Street, Des Moines, 
WA 98198; phone: (781) 238-7655; email: [email protected].

(k) Material Incorporated by Reference

    None.

    Issued on August 28, 2025.
Peter A. White,
Deputy Director, Integrated Certificate Management Division, Aircraft 
Certification Service.
[FR Doc. 2025-17066 Filed 9-4-25; 8:45 am]
BILLING CODE 4910-13-P