[Federal Register Volume 90, Number 158 (Tuesday, August 19, 2025)]
[Notices]
[Page 40351]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-15767]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15388-000]


HGE Energy Storage 6, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On December 27, 2024, HGE Energy Storage 6, LLC (HGE Energy), filed 
an application for a preliminary permit, pursuant to section 4(f) of 
the Federal Power Act (FPA), proposing to study the feasibility of the 
Lake Oroville Pumped Storage Project to be located in Butte County, 
California. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following new facilities: 
(1) a 30-foot-high, 5,600-foot-long earthen with rubber sheet and 
asphalt lining upper embankment that would impound a 40-acre upper 
reservoir with a storage capacity of 4000 acre-feet at a water surface 
elevation of 2,300 feet above mean sea level (msl); (2) a pressure 
shaft of undetermined length and diameter made of concrete and steel 
lined (3) four 3,300-foot-long, 10-foot-diameter steel lined penstocks 
from the upper reservoir to eight 330-foot-long, 15-foot-diameter 
turbine penstocks; (4) a 350-foot-long, 75-foot-wide, 100-foot-high and 
100-foot below ground concrete powerhouse and substation containing six 
210-MW reversible variable speed pump-turbine generators; (5) a 300-
foot-long, 250-foot-diameter concrete lined tailrace; (6) a vertical 
access tunnel 100-feet high and 30-feet in diameter to lead from ground 
level to the powerhouse; (7) a vertical intake structure leading to the 
tailrace 100-feet below sea level (8) an 1.3-mile-long, 115-kilovolt 
transmission line; and (9) appurtenant facilities. The proposed project 
would have an estimated annual generation of 3,675,000 megawatt-hours.
    Applicant Contact: Mr. Wayne Krouse, Manager, HGE Energy Storage 6, 
LLC, 2901 4th Avenue South, #B 253 Birmingham, AL 35233 email: 
[email protected] phone: (877)-556-6566.
    FERC Contact: Jane Dalgliesh; email: [email protected]; phone: 
(503) 552-2718.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or [email protected].
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at https://ferconline.ferc.gov/QuickComment.aspx. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. The first page of any filing should include 
docket number P-15388-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's website at https://elibrary.ferc.gov/eLibrary/search. 
Enter the docket number (P-15388) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: August 14, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-15767 Filed 8-18-25; 8:45 am]
BILLING CODE 6717-01-P