[Federal Register Volume 90, Number 148 (Tuesday, August 5, 2025)]
[Notices]
[Pages 37574-37577]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-14746]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-410; NRC-2025-0742]


Constellation Energy Generation, LLC; Nine Mile Point Nuclear 
Station, Unit 2; License Amendment Request

AGENCY: Nuclear Regulatory Commission.

ACTION: Opportunity to comment, request a hearing, and to petition for 
leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an amendment to Renewed Facility Operating License (RFOL) 
No. NPF-69, issued to Constellation Energy Generation, LLC (CEG, or the 
licensee) for operation of the Nine Mile Point Nuclear Station, Unit 2, 
located in Oswego, New York. The proposed license amendment would 
revise the technical specifications (TS) to eliminate the requirement 
for automatic main steam line (MSL) isolation based on the temperature 
in the area around the MSL. In lieu of automatic isolation, a new 
specification is proposed that requires manual action when the MSL area 
temperature is above the limit.

DATES: Submit comments by September 4, 2025. Comments received after 
this date will be considered if it is practical to do so, but the NRC 
is able to ensure consideration only for comments received on or before 
this date. Requests for a hearing or petition for leave to intervene 
must be filed by October 6, 2025.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-0742. Address 
questions about Docket IDs in Regulations.gov to Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual listed in the For Further Information 
Contact section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Richard Guzman, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1030; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2025-0742 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-0742.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, 
or by email to [email protected]. The ADAMS accession number for 
each document referenced (if it is available in ADAMS) is provided the 
first time that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern

[[Page 37575]]

time (ET), Monday through Friday, except Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2025-0742 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to RFOL No. NPF-69 
for Nine Mile Point Nuclear Station, Unit 2, located in Oswego, New 
York, Docket No. 50-410.
    By letter dated July 18, 2025 (ADAMS Accession No. ML25199A162), 
Constellation Energy Generation, LLC submitted a license amendment 
request for Nine Mile Point Nuclear Station, Unit 2, to revise 
Technical Specification Limiting Condition for Operation (LCO) 3.3.6.1, 
Table 3.3.6.1-1, by deleting Trip Function 1.e, ``Main Steam Line 
Tunnel Temperature--High,'' Trip Function 1.f, ``Main Steam Line Tunnel 
Differential Temperature--High,'' and Trip Function 1.g, ``Main Steam 
Line Tunnel Lead Enclosure Temperature--High,'' and inserting the word 
``Deleted'' in Table 3.3.6.1-1, ``Primary Containment Isolation 
Instrumentation,'' for each deleted Trip Function. The proposed change 
adds a new TS LCO 3.7.7, ``Main Steam Line (MSL) Area Temperature,'' to 
require MSL area maximum temperatures to be maintained less than or 
equal to the limits specified in new Table 3.7.7-1. The proposed change 
also adds a new corresponding surveillance requirement to require 
verification that the MSL area temperatures are maintained in 
accordance with Table 3.7.7-1 on a frequency controlled by the 
Surveillance Frequency Control Program.
    Before issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in section 50.92 of title 10 of the Code of 
Federal Regulations (10 CFR), ``Issuance of amendment,'' states that 
operation of the facility in accordance with the proposed amendment 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety. As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented as follows:
    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed changes do not alter any of the previously evaluated 
accidents in the USAR [Updated Safety Analysis Report]. The proposed 
changes do not affect any of the initiators of previously evaluated 
accidents in a manner that would increase the likelihood of the event. 
The proposed change also eliminates the automatic Main Steam Isolation 
Valve (MSIV) isolation function associated with MSL Area high 
temperature from the requirements of the Technical Specifications (TS) 
and creates TS requirements for MSL Area temperature monitoring in a 
new TS 3.7.7.
    Automatic isolation of the MSIVs on MSL Area high temperature is 
not an initiator of any accident previously evaluated. A manual plant 
shutdown initiated due to MSL leakage in the MST [Main Steam Tunnel] or 
MSTLE [Main Steam Tunnel Lead Enclosure] is not an initiator of any 
accident previously evaluated. There is no credit taken in any 
licensing basis analysis for MSIV closure on MSL Area high temperature, 
and there are no calculations that credit the subject isolation 
function as a mitigative feature.
    As a result, the likelihood of malfunction of an SSC [structures, 
systems and components] is not increased. The capability and operation 
of the mitigation systems are not affected by the proposed changes. 
Thus, the mitigating systems will continue to be initiated and mitigate 
the consequences of an accident as assumed in the analysis of accidents 
previously evaluated.
    Therefore, the proposed changes do not involve a significant 
increase in the probability or consequences of an accident previously 
evaluated.
    2. Does the proposed amendment create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed TS changes involve a change in the surveillance 
testing intervals to facilitate a change in the operating cycle length. 
The proposed TS changes do not introduce any failure mechanisms of a 
different type than those previously evaluated, since there are no 
physical configuration or design changes being made to the facility.
    No new or different equipment is being installed. No installed 
equipment is being operated in a different manner. As a result, no new 
failure modes are being introduced.
    Therefore, the proposed change does not create the possibility of a 
new or different kind of accident from any previously evaluated.
    3. Does the proposed amendment involve a significant reduction in a 
margin of safety?
    Response: No.
    The proposed TS changes involve a change in the surveillance 
testing intervals to facilitate a change in the operating cycle length. 
The impact of these changes on system availability is not significant, 
based on other more frequent testing that is performed, the existence 
of redundant systems and equipment, and overall system reliability.
    The proposed changes do not significantly impact the condition or 
performance of structures, systems, and components relied upon for 
accident mitigation. The proposed changes do not result in any hardware 
changes or in any changes to the analytical limits assumed in accident 
analyses. Existing operating margin between plant conditions and actual 
plant setpoints is not significantly reduced due to these changes. The 
proposed changes do not significantly impact any safety analysis 
assumptions or results. Therefore, the proposed change does not involve 
a significant reduction in a margin of safety.
    The NRC staff has reviewed the licensee's analysis and considers 
the licensee's discussion of proposed TS changes. Based on the NRC 
staff's

[[Page 37576]]

review, the staff has determined that the three standards of 10 CFR 
50.92(c) are satisfied. Therefore, the NRC staff proposes to determine 
that the license amendment request involves no significant hazards 
consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment 
period such that failure to act in a timely way would result, for 
example, in derating or shutdown of the facility. If the Commission 
takes action prior to the expiration of either the comment period or 
the notice period, it will publish in the Federal Register a notice of 
issuance. If the Commission makes a final no significant hazards 
consideration determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action 
before the 60-day notice period has elapsed will occur very 
infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult 10 CFR 
2.309. If a petition is filed, the presiding officer will rule on the 
petition and, if appropriate, a notice of a hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the license 
amendment request involves no significant hazards consideration, the 
Commission may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
amendment request involves a significant hazards consideration, then 
any hearing held would take place before the issuance of the amendment 
unless the Commission finds an imminent danger to the health or safety 
of the public, in which case it will issue an appropriate order or rule 
under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or agency thereof may participate as a non-party under 10 
CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053), and the NRC's public website 
(https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate).

IV. Electronic Submissions and E-Filing

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(https://www.nrc.gov/site-help/e-submittals.html).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.

[[Page 37577]]

    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless otherwise excluded pursuant to an order of 
the presiding officer. If you do not have an NRC-issued digital ID 
certificate as previously described, click ``cancel'' when the link 
requests certificates and you will be automatically directed to the 
NRC's electronic hearing docket where you will be able to access any 
publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information 
such as social security numbers, home addresses, or personal phone 
numbers in their filings unless an NRC regulation or other law requires 
submission of such information. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants 
should not include copyrighted materials in their submission.
    For further details with respect to this action, see the 
application for license amendment dated July 18, 2025 (ADAMS Accession 
No. ML25199A162).
    Attorney for licensee: Jason Zorn, Associate General Counsel, 
Constellation Energy Generation, LLC, 101 Constitution Ave. NW, Suite 
400 East, Washington, DC 20001.
    NRC Branch Chief: Hip[oacute]lito Gonz[aacute]lez.

    Dated: July 31, 2025.

    For the Nuclear Regulatory Commission.
Richard Guzman,
Senior Project Manager, Plant Licensing Branch 1, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2025-14746 Filed 8-4-25; 8:45 am]