[Federal Register Volume 90, Number 138 (Tuesday, July 22, 2025)]
[Notices]
[Page 34569]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-13745]



[[Page 34569]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Environmental Impact Statement: Austin, Fort Bend, Harris, and 
Waller Counties, Texas

AGENCY: Federal Highway Administration (FHWA), DOT.

ACTION: Federal notice of intent to prepare an Environmental Impact 
Statement (EIS).

-----------------------------------------------------------------------

SUMMARY: Pursuant to 23 CFR 771.123(a), FHWA, on behalf of the Texas 
Department of Transportation (TxDOT), is issuing this notice to advise 
the public that an EIS will be prepared for a proposed transportation 
project to construct a new north-south highway from Farm-to-Market Road 
(FM) 1994 south of Needville, Texas to Interstate Highway (I) 10 west 
of Katy, Texas (CSJ: 0912-00-544).

FOR FURTHER INFORMATION CONTACT: TxDOT Houston District, P.O. Box 1386, 
Houston, Texas 77251-1386, 713-802-5199, [email protected].

SUPPLEMENTARY INFORMATION: The environmental review, consultation, and 
other actions required by applicable Federal environmental laws for 
this project are being, or have been, carried out by TxDOT pursuant to 
23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, 
and executed by FHWA and TxDOT.
    The proposed project is needed because the 36A South Project Study 
Area lacks major north-south highways, which limits mobility and 
connectivity through the study area.
    36A South is proposed as a new highway from Farm-to-Market (FM) 
Road 1994 south of Needville, Texas to Interstate Highway (I) 10 west 
of Katy, Texas. The proposed highway would be approximately 41 miles in 
length and would serve Austin, Fort Bend, Harris, and Waller counties.
    The EIS will evaluate a range of build alternatives and a no-build 
alternative.
    TxDOT will issue a single Final Environmental Impact Statement and 
Record of Decision document pursuant to 23 U.S.C. 139(n)(2), unless 
TxDOT determines statutory criteria or practicability considerations 
preclude issuance of a combined document.
    In accordance with 23 U.S.C. 139, cooperating agencies, 
participating agencies, and the public will be given an opportunity for 
continued input on project development. A virtual public scoping 
meeting is planned for Tuesday, Aug. 26, 2025, with two in-person open 
houses. One in-person meeting would be held on Aug. 26 at Leonard E. 
Merrell Center, located at 6301 S Stadium Ln., Katy, TX 77494 and the 
second on Thursday, Aug. 28, 2025, at Fort Bend Epicenter, located at 
28505 Southwest Fwy., Rosenberg, TX 77471. Both would be from 5 to 7 
p.m. and would present identical content. The public scoping meeting 
will provide an opportunity for the public to review and comment on the 
draft coordination plan and schedule, the project purpose and need, the 
range of alternatives, and methodologies and level of detail for 
analyzing alternatives. It will also allow the public an opportunity to 
provide input on any expected environmental impacts, anticipated 
permits or other authorizations, and any significant issues that should 
be analyzed in depth in the EIS. In addition to the public scoping 
meeting, a public hearing will be held after the draft EIS is prepared. 
Public notice will be given of the time and place of the meeting and 
hearing.
    The public meeting will be conducted in English. If you need an 
interpreter or document translator because English is not your primary 
language or you have difficulty communicating effectively in English, 
one will be provided to you free of charge. If you have a disability 
and need assistance, special arrangements can be made to accommodate 
most needs. If you need interpretation or translation services or you 
are a person with a disability who requires an accommodation to attend 
and participate in the public meeting, please contact Gabriel Adame, 
TxDOT Houston District Public Engagement Coordinator, at 713-802-5199 
no later than 4 p.m. CT, Friday, Aug. 22, 2025. Please be aware that 
advance notice is required as some services and accommodations may 
require time for the Texas Department of Transportation to arrange.
    The public is requested to provide public comment on alternatives 
or impacts and on relevant information, studies, or analyses with 
respect to this proposed project. Comments may be provided in writing 
by mail to Advanced Project Development, Texas Department of 
Transportation--Houston District, P.O. Box 1386, Houston, Texas 77251-
1386 or by email to [email protected]. Comments must be received 
by Friday, Sept. 12, 2025.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction.)

    Issued on: July 8, 2025.
Ed Burgos-Gomez,
Acting Director Program Development, Federal Highway Administration.
[FR Doc. 2025-13745 Filed 7-21-25; 8:45 am]
BILLING CODE 4910-RY-P