[Federal Register Volume 90, Number 123 (Monday, June 30, 2025)]
[Notices]
[Pages 27859-27860]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-12049]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7274-035]


Town of Wells; Notice of Application Ready for Environmental 
Analysis and Soliciting Comments, Recommendations, Terms and 
Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed

[[Page 27860]]

with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 7274-035.
    c. Date Filed: July 31, 2023.
    d. Applicant: Town of Wells.
    e. Name of Project: Lake Algonquin Hydroelectric Project.
    f. Location: On the Sacandaga River in the town of Wells, Hamilton 
County, New York.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Matthew Taylor, Principle-in-Charge, GZA 
GeoEnvironmental of New York, 104 West 29th Street, 10th Floor, New 
York 10001; Phone at (781) 278-5803 or email at [email protected]; 
or Beth Hunt, Supervisor, Town of Wells, P.O. Box 205, Wells, New York 
12190; Phone at (518) 924-7912 or email at [email protected].
    i. FERC Contact: Samantha Pollak at (202) 502-6419, or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: on or before 5:00 p.m. Eastern Time on 
August 25, 2025; \1\ reply comments are due on or before 5:00 p.m. 
Eastern Time October 8, 2025.
---------------------------------------------------------------------------

    \1\ The Commission's Rules of Practice and Procedure provide 
that if a deadline falls on a Saturday, Sunday, holiday, or other 
day when the Commission is closed for business, the deadline does 
not end until the close of business on the next business day. 18 
CFR. 385.2007(a)(2). Because the 60-day filing deadline falls on 
Sunday (i.e., August 24, 2025), the filing deadline is extended 
until on or before 5:00 p.m. Eastern Time on Monday, August 25, 
2025.
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://ferconline.ferc.gov/QuickComment.aspx. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy via 
U.S. Postal Service to: Debbie-Anne A. Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, 
DC 20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory 
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All 
filings must clearly identify the project name and docket number on the 
first page: Lake Algonquin Hydroelectric Project (P-7274-035).
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted and is ready for 
environmental analysis at this time.
    l. The Lake Algonquin Hydroelectric Project consists of the 
following facilities: (1) a 239-foot-long, 26.5-foot-high concrete 
gravity dam composed of an ogee spillway section at each end and a 
gated spillway section in the middle with three steel 19-foot-wide by 
12-foot-high vertical lift roller gates; (2) an impoundment with a 
surface area of 275 acres and a storage capacity of 2,557 acre-feet at 
an elevation of 986.84 feet National Geodetic Vertical Datum of 1929 
(NGVD 29); (3) two dikes/low points along the reservoir rim; (4) a 27-
foot-high, 21-foot-wide, 52-foot-long intake structure; (5) a buried 
10-foot-diameter, 113-foot-long steel penstock; (6) a 25-foot-wide, 63-
foot-long concrete, steel, and masonry powerhouse containing one 
turbine-generator unit with a rated capacity of 698 kilowatts; (7) a 
480-volt, 65-foot-long generator lead; (8) a 480-volt/4.8-kilovolt (kV) 
step-up transformer; (9) a 4.8-kV, approximately 50-foot-long overhead 
transmission line; and (10) appurtenant facilities.
    The project operates in a run-of-river mode and discharges a 
minimum flow of 20 cubic feet per second into the project's bypassed 
reach to protect aquatic resources. The project has an average annual 
generation of 1,363 megawatt-hours.
    m. A copy of the application is available for review via the 
internet through the Commission's Home Page (http://www.ferc.gov), 
using the ``eLibrary'' link. Enter the docket number, excluding the 
last three digits in the docket number field, to access the document. 
For assistance, contact FERC at [email protected] or call toll 
free, (886) 208-3676 or TTY (202) 502-8659.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR. 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding in accordance with 
18 CFR 4.34(b) and 385.2010.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members, and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or [email protected].
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. The applicant must file the following on or before 5:00 p.m. 
Eastern Time on August 25, 2025: \2\ (1) copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of a waiver of water quality certification.
---------------------------------------------------------------------------

    \2\ Id.
---------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission on or before 5:00 p.m. Eastern Time on July 25, 2025.

    Dated: June 25, 2025.
Carlos D. Clay,
Deputy Secretary.