[Federal Register Volume 90, Number 111 (Wednesday, June 11, 2025)]
[Notices]
[Pages 24670-24673]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-10550]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-354; NRC-2025-0094]


PSEG Nuclear LLC; Hope Creek Generating Station; License 
Amendment Request

AGENCY: Nuclear Regulatory Commission.

ACTION: Opportunity to comment, request a hearing, and to petition for 
leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an amendment to Renewed Facility Operating License (RFOL) 
No. NPF-57, issued to PSEG Nuclear LLC for the Hope Creek Generating 
Station. The proposed license amendment would revise the RFOL and 
technical specification surveillance performance interval requirements 
to accommodate a 24-month fuel cycle.

DATES: Submit comments by July 11, 2025. Comments received after this 
date will be considered if it is practical to do so, but the NRC is 
able to ensure consideration only for comments received on or before 
this date. Requests for a hearing or petition for leave to intervene 
must be filed by August 11, 2025.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-0094. Address 
questions about Docket IDs in Regulations.gov to Bridget Curran; 
telephone: 301-415-1003; email: [email protected]. For technical 
questions, contact the individual listed in the ``For Further 
Information Contact'' section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Michael Marshall, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2871; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2025-0094 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-0094.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, 
or by email to [email protected]. The ADAMS accession number for 
each document referenced (if it is available in ADAMS) is provided the 
first time that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except 
Federal holidays.

[[Page 24671]]

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2025-0094 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to RFOL No. NPF-57 
for Hope Creek Generating Station, located in Salem County, New Jersey, 
Docket No. 50-354.
    By letter dated May 20, 2024 (ADAMS Accession No. ML24141A136), as 
supplemented by letters dated September 26, 2024 (ADAMS Accession No. 
ML24271A138), and December 6, 2024 (ADAMS Accession No. ML24341A215), 
PSEG Nuclear LLC submitted a license amendment request for Hope Creek 
Generating Station to revise the RFOL and the technical specifications 
(TS) to (1) change surveillance requirement performance intervals 
(e.g., from 12 months to 24 months, and from 36 months to 48 months) to 
accommodate a 24-month fuel cycle, (2) add an exception to the 
Surveillance Frequency Control Program, and (3) change the frequency 
for measurement and assessment of the control room envelope pressure.
    Before issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in section 50.92 of title 10 of the Code of 
Federal Regulations (10 CFR), ``Issuance of amendment,'' states that 
operation of the facility in accordance with the proposed amendment 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety. As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented as follows:
    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed TS changes involve a change in the surveillance 
testing intervals to facilitate a change in the operating cycle length. 
The proposed TS changes do not physically impact the plant. The 
proposed TS changes do not degrade the performance of, or increase the 
challenges to, any safety systems assumed to function in the accident 
analysis.
    The proposed TS changes do not impact the usefulness of the 
surveillance and testing requirements in evaluating the operability of 
required systems and components, or the way in which the surveillances 
are performed. In addition, the frequency of surveillance testing is 
not considered initiators of any analyzed accident, nor do revisions to 
the frequency introduce any accident initiators. Therefore, the 
proposed change does not involve a significant increase in the 
probability of an accident previously evaluated.
    The consequences of a previously evaluated accident are not 
significantly increased. The proposed changes to surveillance 
frequencies do not affect the performance of any equipment credited to 
mitigate the radiological consequences of an accident. Evaluation of 
the proposed TS changes demonstrated that the availability of credited 
equipment is not significantly affected because of other more frequent 
testing that is performed, the availability of redundant systems and 
equipment, and the high reliability of the equipment. Historical review 
of surveillance test results and associated maintenance records did not 
find evidence of failures that would invalidate the above conclusions.
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequences of an accident previously 
evaluated.
    2. Does the proposed amendment create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed TS changes involve a change in the surveillance 
testing intervals to facilitate a change in the operating cycle length. 
The proposed TS changes do not introduce any failure mechanisms of a 
different type than those previously evaluated, since there are no 
physical configuration or design changes being made to the facility.
    No new or different equipment is being installed. No installed 
equipment is being operated in a different manner. As a result, no new 
failure modes are being introduced. Therefore, the proposed change does 
not create the possibility of a new or different kind of accident from 
any previously evaluated.
    3. Does the proposed amendment involve a significant reduction in a 
margin of safety?
    Response: No.
    The proposed TS changes involve a change in the surveillance 
testing intervals to facilitate a change in the operating cycle length. 
The impact of these changes on system availability is not significant, 
based on other more frequent testing that is performed, the existence 
of redundant systems and equipment, and overall system reliability.
    The proposed changes do not significantly impact the condition or 
performance of structures, systems, and components relied upon for 
accident mitigation. The proposed changes do not result in any hardware 
changes or in any changes to the analytical limits assumed in accident 
analyses. Existing operating margin between plant conditions and actual 
plant setpoints is not significantly reduced due to these changes. The 
proposed changes do not significantly impact any safety analysis 
assumptions or results. Therefore, the proposed change does not involve 
a significant reduction in a margin of safety.
    The NRC staff has reviewed the licensee's analysis and considers 
the licensee's discussion of proposed TS changes to also include the 
proposed RFOL changes. Based on the NRC staff's review, the staff has 
determined that the three standards of 10 CFR 50.92(c) are satisfied. 
Therefore, the NRC staff proposes to determine that the license 
amendment request involves no significant hazards consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after

[[Page 24672]]

the date of publication of this notice will be considered in making any 
final determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment 
period such that failure to act in a timely way would result, for 
example, in derating or shutdown of the facility. If the Commission 
takes action prior to the expiration of either the comment period or 
the notice period, it will publish in the Federal Register a notice of 
issuance. If the Commission makes a final no significant hazards 
consideration determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action 
before the 60-day notice period has elapsed will occur very 
infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult 10 CFR 
2.309. If a petition is filed, the presiding officer will rule on the 
petition and, if appropriate, a notice of a hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the amendment 
request involves no significant hazards consideration, the Commission 
may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
amendment request involves a significant hazards consideration, then 
any hearing held would take place before the issuance of the amendment 
unless the Commission finds an imminent danger to the health or safety 
of the public, in which case it will issue an appropriate order or rule 
under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or agency thereof may participate as a non-party under 10 
CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and on the NRC's public website 
at https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate.

IV. Electronic Submissions and E-Filing

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056) and on the NRC's public website at 
https://www.nrc.gov/site-help/e-submittals.html.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. After a digital ID certificate is 
obtained and a docket created, the participant must submit adjudicatory 
documents in Portable Document Format. Guidance on submissions is 
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. ET on the due date. Upon receipt of a 
transmission, the E-Filing system time-stamps the document and sends 
the submitter an email confirming receipt of the document. The E-Filing 
system also distributes an email that provides access to the document 
to the NRC's Office of the General Counsel and any others who have 
advised the Office of the Secretary that they wish to participate in 
the proceeding, so that the filer need not serve the document on those 
participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before adjudicatory documents are filed to 
obtain access to the documents via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.

[[Page 24673]]

    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
presiding officer. If you do not have an NRC-issued digital ID 
certificate as previously described, click ``cancel'' when the link 
requests certificates and you will be automatically directed to the 
NRC's electronic hearing docket where you will be able to access any 
publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information 
such as social security numbers, home addresses, or personal phone 
numbers in their filings unless an NRC regulation or other law requires 
submission of such information. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants 
should not include copyrighted materials in their submission.
    For further details with respect to this action, see the 
application for license amendment dated May 20, 2024 (ADAMS Accession 
No. ML24141A136), as supplemented by letters dated September 26, 2024 
(ADAMS Accession No. ML24271A138), and December 6, 2024 (ADAMS 
Accession No. ML24341A215).
    Attorney for licensee: Francis Romano, PSEG-Services Corporation, 
80 Park Plaza, T-10, Newark, NJ 07102.
    NRC Branch Chief: Hip[oacute]lito Gonz[aacute]lez.

    Dated: June 6, 2025.

    For the Nuclear Regulatory Commission.
Audrey Klett,
Senior Project Manager, Plant Licensing Branch 1, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2025-10550 Filed 6-10-25; 8:45 am]
BILLING CODE 7590-01-P