[Project No. 15396-000]
Central Hudson Gas & Electric Corporation; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On February 18, 2025, Central Hudson Gas & Electric Corporation
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the existing
Sturgeon Pool Hydroelectric Project (Sturgeon Project) on the Wallkill
River in Ulster County, New York. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The Sturgeon Project is an existing operating project that
currently is not licensed.\1\ The project consists of the following
facilities: (1) a 670-foot-long concrete gravity dam with a 490-foot-
long spillway having a crest elevation of 129 feet mean sea level
(msl); (2) a 3.5-foot-high rubber crest gate installed on top of the
spillway; (3) an impoundment having a surface area of 212 acres and a
storage capacity of 2,894 acre-feet at a water surface elevation of
132.5 feet msl; (4) three 10-foot-diameter penstocks; (5) a 48-foot-
wide and 102-foot-long masonry and reinforced concrete powerhouse
containing three turbine-generator units having a total capacity of
15,600 kilowatts; (6) a substation; and (7) appurtenant facilities. The
proposed project would have an annual generation of 60,000 megawatt-
hours.
---------------------------------------------------------------------------
\1\ On February 6, 2025, the Commission determined that the
project is jurisdictional and required to be licensed. 190 FERC ]
62,077 (2025).
---------------------------------------------------------------------------
Applicant Contact: Ryan Hawthorne, Central Hudson Gas & Electric
Corporation, 284 South Avenue, Poughkeepsie, NY 12601; phone: (845)
486-5533.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
community organizations, Tribal members and others, access publicly
available information and navigate Commission processes. For public
inquiries and assistance with making filings such as interventions,
comments, or requests for rehearing, the public is encouraged to
contact OPP at (202) 502-6595 or OPP@ferc.gov.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P-15396) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 23, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-07660 Filed 5-1-25; 8:45 am]
BILLING CODE 6717-01-P