Big Wood Canal Company; Notice of Application Tendered for Filing 
With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: P-3407-088.
    c. Date filed: April 9, 2025.
    d. Applicant: Big Wood Canal Company.
    e. Name of Project: Magic Dam Hydroelectric Project.
    f. Location: On the Big Wood River in Blaine and Camas Counties, 
Idaho. The project occupies Federal land managed by the U.S. Bureau of 
Land Management.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant's Authorized Agent: Peter Josten, 2742 Saint Charles 
Ave., Idaho Falls, ID 83404; Telephone: (208) 339-3542.
    i. FERC Contact: Ingrid Brofman at (202) 502-8347 or email at 
ingrid.brofman@ferc.gov.
    j. Cooperating agencies: Federal, State, local, and Tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental

[[Page 18847]]

document cannot also intervene. See, 94 FERC ] 61,076 (2001).
    k. Pursuant to Sec.  4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: June 9, 2025.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Debbie-Anne A. Reese, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. All filings must clearly identify the 
project name and docket number on the first page: Magic Dam 
Hydroelectric Project (P-3407-088).
    m. The application is not ready for environmental analysis at this 
time.
    n. Project Description: The existing project consists of: (1) a 
3,100-foot-long dam comprised of an earth-filled section, a dike, and a 
concrete spillway section; (2) a 3,740-acre reservoir with a storage 
capacity of approximately 191,500 acre-feet at an elevation of 4,798 
feet; (3) a 36.5-foot-high intake tower; (4) a 620-foot-long, 132-inch-
diameter outlet conduit leading to a 170-foot-long, 132-inch-diameter 
penstock connecting to a powerhouse; (5) a powerhouse containing three 
generating units with a combined capacity of 9.0 megawatts; (6) a 9.2-
mile-long, 4.16 kilovolt transmission line; and (7) appurtenant 
facilities.
    The project operates in a run-of-release mode only using flows that 
are seasonally released into the Big Wood River for irrigation. The 
estimated annual generation is 14.3 gigawatt-hours.
    o. A copy of the application is available for review on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document (P-3407). For assistance, 
contact FERC Online Support at FERCOnlineSupport@ferc.gov or call 
tollfree, (866) 208-3676 or (202) 502-8659 (TTY).
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
community organizations, Tribal members and others, access publicly 
available information and navigate Commission processes. For public 
inquiries and assistance with making filings such as interventions, 
comments, or requests for rehearing, the public is encouraged to 
contact OPP at (202) 502-6595 or OPP@ferc.gov.
    q. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary schedule. Revisions 
to the schedule will be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary).  June 2025.
Request Additional Information.........  June 2025.
Issue Acceptance Letter................  September 2025.
Issue Scoping Document 1 for Comments..  October 2025.
Issue Scoping Document 2 (if necessary)  January 2026.
Issue Notice of Ready for Environmental  January 2026.
 Analysis.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: April 23, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-07658 Filed 5-1-25; 8:45 am]