[Federal Register Volume 90, Number 79 (Friday, April 25, 2025)]
[Notices]
[Pages 17429-17430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-07068]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC25-11-000]


Commission Information Collection Activities (FERC-725k); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-725K (Mandatory Reliability Standards for 
the SERC Region). There are no changes to the reporting requirements 
with this information collection.

DATES: Comments on the collection of information are due June 24, 2025.

ADDRESSES: Please submit comments via email to [email protected]. 
You must specify the Docket No. (IC25-11-000) and the FERC Information 
Collection number (FERC-725K) in your email. If you are unable to file 
electronically, comments may be filed by USPS mail or by hand 
(including courier) delivery:
     Mail via U.S. Postal Service only, addressed to: Federal 
Energy Regulatory Commission, Secretary of the Commission, 888 First 
Street NE, Washington, DC 20426.

[[Page 17430]]

     Hand (including courier) delivery to: Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
    Docket: To view comments and issuances in this docket, please visit 
https://elibrary.ferc.gov/eLibrary/search. Once there, you can also 
sign-up for automatic notification of activity in this docket.

FOR FURTHER INFORMATION CONTACT: Kayla Williams may be reached by email 
at [email protected], telephone at (202) 502-6468.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725K (Mandatory Reliability Standards for the SERC 
Region).
    OMB Control No.: 1902-0260.
    Type of Request: Three-year extension of the FERC-725K information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: Section 215 of the Federal Power Act (FPA) requires a 
Commission-certified Electric Reliability Organization (ERO) to develop 
mandatory and enforceable Reliability Standards, which are subject to 
Commission review and approval. Once approved, the Reliability 
Standards may be enforced by NERC, subject to Commission oversight, or 
by the Commission independently.
    Reliability Standards that NERC proposes to the Commission may 
include Reliability Standards that are proposed by a Regional Entity to 
be effective in that region. In Order No. 672, the Commission noted 
that:

    As a general matter, we will accept the following two types of 
regional differences, provided they are otherwise just, reasonable, 
not unduly discriminatory or preferential and in the public 
interest, as required under the statute: (1) a regional difference 
that is more stringent than the continent-wide Reliability Standard, 
including a regional difference that addresses matters that the 
continent-wide Reliability Standard does not; and (2) a regional 
Reliability Standard that is necessitated by a physical difference 
in the Bulk-Power System.

    When NERC reviews a regional Reliability Standard that would be 
applicable on an interconnection-wide basis and that has been proposed 
by a Regional Entity organized on an interconnection-wide basis, NERC 
must rebuttably presume that the regional Reliability Standard is just, 
reasonable, not unduly discriminatory or preferential, and in the 
public interest. In turn, the Commission must give ``due weight'' to 
the technical expertise of NERC and of a Regional Entity organized on 
an interconnection-wide basis.
    On April 19, 2007, the Commission accepted delegation agreements 
between NERC and each of the eight Regional Entities. In the order, the 
Commission accepted SERC as a Regional Entity organized on less than an 
interconnection-wide basis. As a Regional Entity, SERC oversees Bulk-
Power System reliability within the SERC Region, which covers a 
geographic area of approximately 560,000 square miles in a sixteen-
state area in the southeastern and central United States (all of 
Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia, 
Mississippi, and portions of Iowa, Illinois, Kentucky, Virginia, 
Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is 
currently geographically divided into five subregions that are 
identified as Southeastern, Central, VACAR, Delta, and Gateway.
    For this renewal, there is only one SERC region Reliability 
Standard, PRC-006-SERC-3 (Automatic Underfrequency Load Shedding 
Requirements). PRC-006-SERC-3 is applicable to these SERC entities, 27 
planning coordinators (PC), 212 generator owners (GO), and UFLS 
entities made up 70 transmission owners (TO) and 95 distribution 
providers.
    Type of Respondents: Entities registered with the North American 
Electric Reliability Corporation (within the SERC region).
    Estimate of Annual Burden: \1\ The Commission estimates the annual 
reporting burden and cost for the information collection as:
---------------------------------------------------------------------------

    \1\ ``Burden'' is defined as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
    \2\ These values were derived from the NERC Compliance data of 
February 12, 2025, using only SERC unique United States registered 
entities.
    \3\ The estimated hourly cost (salary plus benefits) is a 
combination based on the Bureau of Labor Statistics (BLS), as of 
2024, for 75% of the average of an Electrical Engineer (17-2071) 
$79.31/hr., 79.31 x .75 = 59.4825 ($59.48-rounded) ($59.48/hour) and 
25% of an Information and Record Clerk (43-4199) $44.74/hr., $44.74 
x .25% = 11.185 ($11.19 rounded) ($11.19/hour), for a total ($59.48 
+ $11.19 = $70.67/hour).

                                              FERC-725K--Mandatory Reliability Standard for the SERC Region
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                           Number of    Annual number                                                                          Cost per
                                          respondents   of responses    Total number   Average burden & cost per  Total annual burden hours   respondent
                                              \2\      per respondent   of responses          response \3\           & total annual cost         ($)
                                                  (1)             (2)     (1) * (2) =  (4)......................  (3) * (4) = (5)..........    (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual Review and Record Retention.....       27 (PC)               1              27  24 hrs., $1,696.08.......  648 hrs., $45,794.16.....    $1,696.08
                                             212 (GO)               1             212  20 hrs., $1,413.40.......  4,240 hrs., $299,640.80..     1,413.40
                                              70 (TO)               1              70  12 hrs., $848.04.........  840 hrs., $59,362.80.....       848.04
                                              95 (DP)               1              95  12 hrs., $848.04.........  1,140 hrs., $80,563.80...       848.04
                                        ----------------------------------------------------------------------------------------------------------------
    Total..............................  ............  ..............             404  .........................  6,868 hrs., $485,361.56..     4,805.56
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: April 18, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-07068 Filed 4-24-25; 8:45 am]
BILLING CODE 6717-01-P