[Federal Register Volume 90, Number 78 (Thursday, April 24, 2025)]
[Notices]
[Pages 17251-17252]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-07069]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC25-10-000]


Commission Information Collection Activities (FERC-715); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-715 (Annual Transmission Planning and 
Evaluation Report). There are no changes to the reporting requirements 
with this information collection.

DATES: Comments on the collection of information are due June 23, 2025.

ADDRESSES: Please submit comments via email to [email protected]. 
You must specify the Docket No. (IC25-10-000) and the FERC Information 
Collection number (FERC-715) in your email. If you are unable to file 
electronically, comments may be filed by USPS mail or by hand 
(including courier) delivery:
     Mail via U.S. Postal Service only, addressed to: Federal 
Energy Regulatory Commission, Secretary of the Commission, 888 First 
Street NE, Washington, DC 20426.
     Hand (including courier) Delivery to: Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
    Docket: To view comments and issuances in this docket, please visit 
https://elibrary.ferc.gov/eLibrary/search. Once there, you can also 
sign-up for automatic notification of activity in this docket.

FOR FURTHER INFORMATION CONTACT: Kayla Williams, (202) 502-6468 or 
[email protected].

SUPPLEMENTARY INFORMATION: 
    Title: FERC-715, (Annual Transmission Planning and Evaluation 
Report).
    OMB Control No.: 1902-0171.
    Type of Request: Three-year extension of the FERC-715 information 
collection requirements with no changes to the current reporting 
requirements.
    Acting under section 213 of the Federal Power Act \1\ and 18 CFR 
141.300, FERC requires each transmitting utility that operates 
integrated transmission system facilities rated above 100 kilovolts 
(kV) to submit annually:
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824l
---------------------------------------------------------------------------

     Contact information;
     Base case power flow data (if the respondent does not 
participate in the development and use of regional power flow data);
     Transmission system maps and diagrams used by the 
respondent for transmission planning;
     A detailed description of the transmission planning 
reliability criteria used to evaluate system performance for time 
frames and planning horizons used in regional and corporate planning;
     A detailed description of the respondent's transmission 
planning assessment practices (including, but not limited to, how 
reliability criteria are applied and the steps taken in performing 
transmission planning studies); and
     A detailed evaluation of the respondent's anticipated 
system performance as measured against its stated reliability criteria 
using its stated assessment practices.
    FERC-715 enables the Commission to use the information as part of 
their regulatory oversight functions which includes:

[[Page 17252]]

     The review of rates and charges;
     The disposition of jurisdictional facilities;
     The consolidation and mergers;
     The adequacy of supply and;
     Reliability of the nation's transmission grid.
    FERC-715 also helps the Commission resolve transmission disputes. 
Additionally, the Office of Electric Reliability (OER) uses the FERC-
715 data to help protect and improve the reliability and security of 
the nation's bulk power system. OER oversees the development and review 
of mandatory reliability and security standards and ensures compliance 
with the approved standards by the users, owners, and operators of the 
bulk power system. OER also monitors and addresses issues concerning 
the nation's bulk power system including assessments of resource 
adequacy and reliability.
    Without the FERC-715 data, the Commission would be unable to 
evaluate planned projects or requests related to transmission.
    Type of Respondent: Integrated transmission system facilities rated 
at or above 100 kilovolts (kV).
    Estimate of Annual Burden: \2\ The Commission estimates the total 
annual burden and cost \3\ for this information collection as follows.
---------------------------------------------------------------------------

    \2\ ``Burden'' is the total time, effort, or financial resources 
expended by persons to generate, maintain, retain, or disclose or 
provide information to or for a Federal agency. For further 
explanation of what is included in the information collection 
burden, refer to Title 5 Code of Federal Regulations 1320.3.
    \3\ The Commission staff estimates that the industry's hourly 
cost for wages plus benefits is similar to the Commission's $103.00 
FY 2025 average hourly cost for wages and benefits.

                                              FERC-715--Annual Transmission Planning and Evaluation Report
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                     Annual number                                             Total annual burden
         Type of response              Number of     of responses    Total number of   Average burden & cost     hours  & total      Cost per respondent
                                      respondents   per respondent      responses           per response           annual cost               ($)
                                               (1)             (2)    (1) * (2) = (3)  (4)..................  (3) * (4) = (5).....  (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual Transmission Planning and               106               1                106  80 hrs.; $8,240......  8,480 hrs.; $898,880  $8,480
 Evaluation Report.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: April 18, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-07069 Filed 4-23-25; 8:45 am]
BILLING CODE 6717-01-P