[Federal Register Volume 90, Number 75 (Monday, April 21, 2025)]
[Notices]
[Pages 16707-16708]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-06802]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-261; NRC-2025-0076]
Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant,
Unit No. 2; Subsequent License Renewal Application
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; receipt.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has received an
application for the renewal of Facility Operating License No. DPR-23,
which authorizes Duke Energy Progress, LLC (Duke, the applicant) to
operate H.B. Robinson Steam Electric Plant (Robinson), Unit 2. The
renewed license would authorize the applicant to operate Robinson, Unit
2, for an additional 20 years beyond the period specified in the
current license. The current operating license for Robinson, Unit 2,
expires July 31, 2030.
DATES: The subsequent license renewal application referenced in this
document is available on April 21, 2025.
ADDRESSES: Please refer to Docket ID NRC-2025-0076 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-0076. Address
questions about Docket IDs in Regulations.gov to Bridget Curran;
telephone: 301-415-1003; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. The ADAMS accession number for
each document referenced (if it is available in ADAMS) is provided the
first time that it is mentioned in this document.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
[[Page 16708]]
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Andrew Siwy, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-287-9232; email: [email protected].
SUPPLEMENTARY INFORMATION: The NRC has received an application from
Duke, dated April 1, 2025 (ADAMS Package Accession No. ML25091A290)
filed pursuant to section 103 of the Atomic Energy Act of 1954, as
amended, and part 54 of title 10 of the Code of Federal Regulations,
``Requirements for Renewal of Operating Licenses for Nuclear Power
Plants,'' to renew the operating license for Robinson, Unit 2. Renewal
of the license would authorize the applicant to operate the facility
for an additional 20-year period beyond the period specified in the
current operating license. Robinson, Unit 2, is a pressurized water
reactor located near Hartsville, SC. The acceptability of the tendered
application for docketing, and other matters, including an opportunity
to request a hearing, will be the subject of subsequent Federal
Register notices.
A copy of the subsequent license renewal application for Robinson,
Unit 2, is also available to local residents near the site at the
following public library: Hartsville Memorial Public Library, 147 West
College Avenue in Hartsville, SC 29550.
Dated: April 16, 2025.
For the Nuclear Regulatory Commission.
Mark Yoo,
Acting Chief, License Renewal Project Branch, Division of New and
Renewed Licenses, Office of Nuclear Reactor Regulation.
[FR Doc. 2025-06802 Filed 4-18-25; 8:45 am]
BILLING CODE 7590-01-P