DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6398-026]


Hackett Mills Hydro Associates, LLC; Notice of Application 
Accepted for Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.

    a. Type of Application: Subsequent Minor License.
    b. Project No.: 6398-026.
    c. Date filed: August 31, 2022.
    d. Applicant: Hackett Mills Hydro Associates, LLC (Hackett Mills 
Hydro).
    e. Name of Project: Hackett Mills Hydroelectric Project.
    f. Location: On the Little Androscoggin River, in the towns of 
Poland and Minot, in Androscoggin County, Maine. The project does not 
occupy any Federal land.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Matthew Nini, Hackett Mills Hydro Associates, 
LLC c/o Eagle Creek Renewable Energy, LLC, 7315 Wisconsin Avenue, Suite 
1100W, Bethesda, Maryland 20814; phone: (973) 998-8171; email: 
[email protected].
    i. FERC Contact: John Matkowski at (202) 502-8576 or 
[email protected].
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests using the Commission's eFiling system 
at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
All filings must clearly identify the project name and docket number on 
the first page: Hackett Mills Hydroelectric Project (P-6398-026).
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted but is not ready for 
environmental analysis.
    l. The existing Hackett Mills Project consists of: (1) a 186-foot-
long dam that consists of two spillway sections: a 101-foot-long, 8-
foot-high rock filled timber crib dam with an uncontrolled spillway 
(main spillway section) and a 85-foot-long, 8-foot-high concrete 
gravity dam with three uncontrolled bays (secondary spillway section); 
(2) an obsolete sluice gatehouse that connects the main spillway and 
the secondary spillway sections; (3) a 3.5-mile-long, 60-acre 
impoundment with no useable storage capacity at a normal maximum water 
surface elevation of 235.05 feet; \1\ (4) a 17.5-foot-long, 40-foot-
high and 22-foot-wide intake structure containing five gates; (5) a 
100-foot-long, 25-foot-wide, 10-foot-deep power canal; (6) a 20-feet-
long, 43.5-foot-high and 22-feet-wide concrete powerhouse located at 
the end of the canal containing one 485-kilowatt right angle drive bulb 
turbine-generator

[[Page 13157]]

unit, with a minimum hydraulic capacity of 113 cubic-feet-per-second 
(cfs) and a maximum hydraulic capacity of 474 cfs; (7) a downstream 
fish passage facility; (8) a 200-foot-long, 12.5-kilovolt transmission 
line; and (9) appurtenant facilities.
---------------------------------------------------------------------------

    \1\ All elevations are reported in National Geodetic Vertical 
Datum of 1929 (NGVD 29).
---------------------------------------------------------------------------

    The Hackett Mills Project is currently operated in a run-of-river 
mode and generates 1,602 megawatt-hours annually. Hackett Mills Hydro 
proposes to continue operating the project as a run-of-river facility 
and does not propose any new construction to the project.
    m. In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) 
using the ``eLibrary'' link. Enter the docket number, excluding the 
last three digits in the sub-docket number field to access the 
document. For assistance, contact FERC at [email protected] or 
call toll-free, (886) 208-3676 or TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
Tribal members, and others, access publicly available information and 
navigate Commission processes. For public inquiries and assistance with 
making filings such as interventions, comments, or requests for 
rehearing, the public is encouraged to contact OPP at (202) 502-6595, 
or [email protected].
    o. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.
    p. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

Issue Scoping Document 1 for comments--April 2025
Comments on Scoping Document 1 Due--May 2025
Issue Scoping Document 2 (if necessary)--July 2025
Issue Notice of Ready for Environmental Analysis--August 2025

    Dated: March 14, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-04742 Filed 3-19-25; 8:45 am]