[Federal Register Volume 90, Number 18 (Wednesday, January 29, 2025)]
[Notices]
[Page 8394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-01869]
[[Page 8394]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15375-000]
Kram Hydro 10, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On October 10, 2024, Kram Hydro 10, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the proposed Mississippi
Lock and Dam #20 Hydroelectric Project (Lock and Dam #20 Project), a
hydropower project proposed to be located at the U.S. Army Corps of
Engineers' (Corps) Mississippi Lock and Dam located on the Mississippi
River near Lima Township, Illinois, in Adams County, Illinois. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed Lock and Dam #20 Project would consist of the
following: (1) a 300-foot-long, 120-foot-wide intake area located
upstream of the powerhouse; (2) a 125-foot-long and 125-foot-wide
powerhouse located adjacent to the eastern side of the existing dam;
(3) two identical 20.0-megawatt (MW) Kaplan pit turbine generators with
a combined net power capacity of 40.0 MW; (4) 9.4-mile-long, single
overhead three- phase, 138-kilovolt line to the interconnection point;
(5) new concrete guide walls constructed upstream and downstream of the
powerhouse; (6) a 125-foot-wide, 150-foot-long unlined earthen
excavation tailrace area; and (7) appurtenant facilities. The proposed
project would have an estimated annual generation of 252.8 gigawatt
hours.
Applicant Contact: Kristen Fan, Kram Hydro 10, LLC, 3120 Southwest
Fwy., Suite 101, PMB 50808 Houston, TX 77098, Phone: 772-418-2705.
FERC Contact: Amir Sharifi at 202-502-8518 or
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first page of any filing should include
docket number P-15375-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P-15375) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 23, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-01869 Filed 1-28-25; 8:45 am]
BILLING CODE 6717-01-P