[Federal Register Volume 89, Number 225 (Thursday, November 21, 2024)]
[Notices]
[Page 92155]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-27305]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_NV_FRN_4500183156]
Notice of Availability of the Record of Decision for the
Robertson Mine Project, Lander County, Nevada
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD) for the Final Environmental Impact
Statement (EIS) for the Robertson Mine Project located in Lander
County, Nevada. The ROD constitutes the decision of the BLM.
DATES: The District Manager signed the ROD on November 15, 2024.
ADDRESSES: The ROD is available online at https://eplanning.blm.gov/eplanning-ui/project/2023088/510.
FOR FURTHER INFORMATION CONTACT: Jeff Kirkwood, Project Manager,
telephone: (775) 635-4164; address: 50 Bastian Road, Battle Mountain,
Nevada 89820; email: [email protected]. Individuals in the
United States who are deaf, deafblind, hard of hearing, or have a
speech disability may dial 711 (TTY, TDD, or TeleBraille) to access
telecommunications relay services for contacting Mr. Kirkwood.
Individuals outside the United States should use the relay services
offered within their country to make international calls to the point-
of-contact in the United States.
SUPPLEMENTARY INFORMATION: The ROD incorporates BLM's selection of the
Partial Backfill Alternative (Preferred Alternative/Selected
Alternative). The BLM's decision is based on the analyses contained in
the Final EIS, and after careful consideration of input received from
the public and cooperating agencies.
The BLM will authorize the plan of operations (Plan) for the
Robertson Mine Project in the ROD, in accordance with the BLM Use and
Occupancy and Surface Management Regulations at 43 CFR subparts 3715
and 3809. The BLM has determined that implementation of this ROD, with
the identified mitigation measures and the Applicant-committed
Environmental Protection Measures (ACEPMs), will not cause unnecessary
or undue degradation of the public lands and is consistent with
applicable legal requirements.
In accordance with 40 CFR 1505.2(c), the mitigation measures and
ACEPMs required as part of the Plan represent practicable means to
avoid or minimize environmental harm resulting from implementing the
BLM's Selected Alternative. All mitigation measures within the BLM's
authority will be implemented and enforced.
The operator is responsible for obtaining any necessary local,
state, and Federal permits, licenses, or reviews. Other agencies are
responsible for issuing and enforcing their own decisions and
applicable authorizations for the Project.
(Authority: 40 CFR 1506.6)
Jon D. Sherve,
Battle Mountain District Manager.
[FR Doc. 2024-27305 Filed 11-20-24; 8:45 am]
BILLING CODE 4331-21-P